SAP ABAP Table RCWBT (Screen Table for SAPLCJTR Module Pool)
Hierarchy
SAP_APPL (Software Component) Logistics and Accounting
   PS-DAT (Application Component) Dates
     CN_PSP_TRM (Package) Project Structure Plan Dates
Basic Data
Table Category INTTAB    Structure 
Structure RCWBT   Table Relationship Diagram
Short Description Screen Table for SAPLCJTR Module Pool    
Delivery and Maintenance
Pool/cluster      
Delivery Class      
Data Browser/Table View Maintenance     Display/Maintenance Allowed with Restrictions 
Components
     
Field Key Data Element Domain Data
Type
Length Decimal
Places
Short Description Check
table
1 POSID PS_OBJCT PS_OBJCT CHAR 24   0   Identification of project element  
2 POST1 PS_POST1 TEXT40 CHAR 40   0   PS: Short description (first text line)  
3 POSKI PS_POSKI PS_PROKI CHAR 16   0   WBS element short identification  
4 PSTRT PS_PSTRT DATUM DATS 8   0   WBS element: Basic start date  
5 PENDE PS_PENDE DATUM DATS 8   0   WBS element: Basic finish date  
6 PDAUR PS_TRMDAUR DAUER_4_1 QUAN 5   1   Scheduled duration of a WBS element  
7 PEINH DAUNORE MEINS UNIT 3   0   Normal duration/unit *
8 ESTRT PS_ESTRT DATUM DATS 8   0   Forecasted start date of the WBS element  
9 EENDE PS_EENDE DATUM DATS 8   0   Forecasted finish date of the WBS element  
10 EDAUR PS_TRMDAUR DAUER_4_1 QUAN 5   1   Scheduled duration of a WBS element  
11 EEINH DAUNORE MEINS UNIT 3   0   Normal duration/unit *
12 ISTRT PS_ISTRT DATUM DATS 8   0   Actual start date for the WBS element  
13 IENDE PS_IENDE DATUM DATS 8   0   Actual finish date of the WBS element  
14 IDAUR PS_TRMDAUR DAUER_4_1 QUAN 5   1   Scheduled duration of a WBS element  
15 IEINH DAUNORE MEINS UNIT 3   0   Normal duration/unit *
16 STERM PS_STERM DATUM DATS 8   0   Start date for an object (WBS element, operation)  
17 ETERM PS_ETERM DATUM DATS 8   0   Finish date for an object (WBS element, activity ...)  
18 DAUER PSDAUER DAUER_4_1 QUAN 5   1   Length (duration) of a project or a WBS element  
19 EINHT DAUNORE MEINS UNIT 3   0   Normal duration/unit *
20 STUFE PS_STUFE INT1 INT1 3   0   Level in project hierarchy  
21 SELKZ SELKZ SELKZ CHAR 1   0   Selection flag  
22 SLHIE PS_EIGEN XFELD CHAR 1   0   Indicator: Assignments/Attributes WBS elements + activities  
23 IDENT PS_IDENT TEXT40 CHAR 40   0   Work breakdown structure element (WBS element)  
24 LFDNR ENTRY_ACT SYST_LONG INT4 10   0   Entry  
25 PLART PSPLART PSPLART NUMC 1   0   Planning type for project date definition  
26 PLFRM PSPLFRM PSPLFRM NUMC 1   0   Planning method for project scheduling  
27 AUFNR AUFNR AUFNR CHAR 12   0   Order Number *
28 MSTRT PS_MSTRT DATUM DATS 8   0   Earliest start for the WBS element  
29 MENDE PS_MENDE DATUM DATS 8   0   Latest finish for WBS element  
30 PIDEN PS_PIDENT TEXT40 CHAR 40   0   Project definition  
31 UNTRG PS_UNTRGIC CHAR40 CHAR 40   0   Indicator: WBS element is sub-divided  
32 OBJCT PS_OBJCT PS_OBJCT CHAR 24   0   Identification of project element  
33 KENNR PS_KENNR CHAR10 CHAR 10   0   Object  
34 INCLA PS_INCLA SELKZ CHAR 1   0   Create project with activities  
35 VRGNG PS_KZVRG CHAR1 CHAR 1   0   Indicator: Activities exist for WBS element  
36 NTER PS_NTER SELKZ CHAR 1   0   Indicator: WBS dates are not current  
37 DIFFS PS_DIFFS DAUER_4_1 QUAN 5   1   Difference between scheduled start and entered start  
38 DIFSE DAUNORE MEINS UNIT 3   0   Normal duration/unit *
39 DIFFE PS_DIFFE DAUER_4_1 QUAN 5   1   Difference between two finish dates  
40 DIFEE DAUNORE MEINS UNIT 3   0   Normal duration/unit *
41 IRUCK PS_PSPRUCK SELKZ CHAR 1   0   Ind: Actual finish date can be entered for WBS element  
42 CORPD CFREPID2 BERNA2 CHAR 12   0   Report *
43 REPID SETNR SETNR CHAR 12   0   Set ID  
44 BELAS PS_BELASTG DEC8_2 DEC 10   2   Capacity load caused by WBS element  
45 PSPPR PS_BELPROZ DEC8_2 DEC 10   2   Load (%) in one period caused by WBS elements  
46 TRMRP PS_TRMRP AS4TAB CHAR 30   0   Overview of Project Info System TCNE
47 TRMPRF PS_PROF_DT PS_PROF_DT CHAR 12   0   Information system profile: Overview TCND
48 BEZEI PS_BEZEICH TEXT40 CHAR 40   0   Description project objects  
49 VSNMR VSNMR VSNMR CHAR 12   0   Number or description of a version  
50 SEARCH PS_SEARCH TEXT40 CHAR 40   0   Search term  
51 VSPOSID PS_POSID PS_POSID CHAR 24   0   Work Breakdown Structure Element (WBS Element)  
52 VSPSPID PS_PSPID PS_PSPID CHAR 24   0   Project definition  
53 VSKAT VSKAT VSKAT CHAR 1   0   Project version category: status/time-dependent  
54 VRGNG_IC PS_VRGNGIC CHAR40 CHAR 40   0   Indicator: WBS element has activities assigned  
55 FSAVD FSAVD DATUM DATS 8   0   Earliest scheduled start: Execution (date)  
56 FSEDD FSEDD DATUM DATS 8   0   Earliest scheduled finish: Execution (date)  
57 SSAVD SSAVD DATUM DATS 8   0   Latest scheduled start: Execution (date)  
58 SSEDD SSEDD DATUM DATS 8   0   Latest scheduled finish: Execution (date)  
59 FPAVD FPAVD DATUM DATS 8   0   Earliest scheduled start date (forecast)  
60 FPEDD FPEDD DATUM DATS 8   0   Earliest scheduled finish date (forecast)  
61 SPAVD SPAVD DATUM DATS 8   0   Latest scheduled start date (forecast)  
62 SPEDD SPEDD DATUM DATS 8   0   Latest scheduled finish date (forecast)  
63 VISTR PS_ISTVORL DATUM DATS 8   0   Tentative actual start date for WBS element  
64 VIEND PS_IENVORL DATUM DATS 8   0   Tentative actual finish date for WBS element  
65 SCHED_INST CN_SCHINST CN_SCHINST NUMC 1   0   Schedule maintenance/service orders  
Foreign Keys
Source Table Source Column Foreign Table Foreign Column Dependency Factor Cardinality left Cardinality right
1 RCWBT TRMPRF TCND PROFID REF 1 CN
2 RCWBT TRMRP TCNE TABNAME REF 1 CN
History
Last changed by/on SAP  20130529 
SAP Release Created in