SAP ABAP Data Element PS_NTER (Indicator: WBS dates are not current)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷ PS-DAT (Application Component) Dates
⤷ CN_PSP_TRM (Package) Project Structure Plan Dates
⤷ PS-DAT (Application Component) Dates
⤷ CN_PSP_TRM (Package) Project Structure Plan Dates
Basic Data
Data Element | PS_NTER |
Short Description | Indicator: WBS dates are not current |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | SELKZ | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 8 | To schd. |
Medium | 14 | To schedule |
Long | 20 | Dates not current |
Heading | 2 | Sd |
Documentation
Use
This indicator tells you that the scheduled dates for the WBS elements are now longer current, because:
- the activities dates for the WBS element have changed
- the network was rescheduled
To update the WBS element dates, carry out WBS scheduling.
History
Last changed by/on | SAP | 19990105 |
SAP Release Created in |