SAP ABAP Data Element PS_NTER (Indicator: WBS dates are not current)
Hierarchy
SAP_APPL (Software Component) Logistics and Accounting
   PS-DAT (Application Component) Dates
     CN_PSP_TRM (Package) Project Structure Plan Dates
Basic Data
Data Element PS_NTER
Short Description Indicator: WBS dates are not current  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type SELKZ    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short To schd. 
Medium 14 To schedule 
Long 20 Dates not current 
Heading Sd 
Documentation

Use

This indicator tells you that the scheduled dates for the WBS elements are now longer current, because:

  • the activities dates for the WBS element have changed
  • the network was rescheduled

To update the WBS element dates, carry out WBS scheduling.

History
Last changed by/on SAP  19990105 
SAP Release Created in