SAP ABAP Data Element PS_PSPRUCK (Ind: Actual finish date can be entered for WBS element)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷ PS-DAT (Application Component) Dates
⤷ CN_PSP_TRM (Package) Project Structure Plan Dates
⤷ PS-DAT (Application Component) Dates
⤷ CN_PSP_TRM (Package) Project Structure Plan Dates
Basic Data
Data Element | PS_PSPRUCK |
Short Description | Ind: Actual finish date can be entered for WBS element |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | SELKZ | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Act.Fin |
Medium | 15 | ActFin.Maintain |
Long | 20 | Act.Fin.Maintainable |
Heading | 2 | AF |
Documentation
Use
When this indicator is set, you can enter an actual finish date for the WBS element. The WBS element gets the status "final confirmation".
History
Last changed by/on | SAP | 20040819 |
SAP Release Created in | 470 |