SAP ABAP Data Element PS_DIFFE (Difference between two finish dates)
Hierarchy
☛ SAP_APPL (Software Component) Logistics and Accounting
   ⤷ PS-DAT (Application Component) Dates
     ⤷ CN_PSP_TRM (Package) Project Structure Plan Dates
Basic Data
Data Element PS_DIFFE
Short Description Difference between two finish dates  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type DAUER_4_1    
Data Type QUAN   Quantity field, points to a unit field with format UNIT 
Length 5    
Decimal Places 1    
Output Length 7    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 8 Fin.diff 
Medium 15 Finish diff. 
Long 19 Finish difference 
Heading 7 FinDiff 
Documentation

Definition

Difference between the scheduled finish date and the finish date you entered manually.

History
Last changed by/on SAP  19950401 
SAP Release Created in 470