SAP ABAP Table RCJ_PS_PPT (All Objects in the Project Planning Board)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷
PS-ST-OPR-PPB (Application Component) Project Planning Board
⤷
CN_PPT_GRAFIK (Package) Project Planning Board
⤷
⤷
Basic Data
| Table Category | INTTAB | Structure |
| Structure | RCJ_PS_PPT |
|
| Short Description | All Objects in the Project Planning Board |
Delivery and Maintenance
| Pool/cluster | ||
| Delivery Class | ||
| Data Browser/Table View Maintenance | Display/Maintenance Allowed with Restrictions |
Components
| |
Field | Key | Data Element | Domain | Data Type |
Length | Decimal Places |
Short Description | Check table |
|---|---|---|---|---|---|---|---|---|---|
| 1 | |
0 | 0 | Object Structure for Project Reporting | |||||
| 2 | |
OBJEKT_ID | CHAR30 | CHAR | 30 | 0 | ID/Object key | ||
| 3 | |
KURZTEXT | TEXT40 | CHAR | 40 | 0 | Short text/description of the object | ||
| 4 | |
OTEXT | TEXT25 | CHAR | 25 | 0 | Object Type Text | ||
| 5 | |
PS_ECKST | DATUM | DATS | 8 | 0 | Basic start date | ||
| 6 | |
PS_ECKEN | DATUM | DATS | 8 | 0 | Finish date (from basic dates) | ||
| 7 | |
PS_PROGST | DATUM | DATS | 8 | 0 | Forecast start date | ||
| 8 | |
PS_PROGEN | DATUM | DATS | 8 | 0 | Forecast finish date | ||
| 9 | |
PS_TESTFR | DATUM | DATS | 8 | 0 | Earliest scheduled start (from basic dates) | ||
| 10 | |
PS_TEENFR | DATUM | DATS | 8 | 0 | Earliest scheduled finish (from basic dates) | ||
| 11 | |
PS_TESTSP | DATUM | DATS | 8 | 0 | Latest scheduled start (from basic dates) | ||
| 12 | |
PS_TEENSP | DATUM | DATS | 8 | 0 | Latest scheduled finish (from basic dates) | ||
| 13 | |
PS_TPSTFR | DATUM | DATS | 8 | 0 | Earliest scheduled start (from forecast dates) | ||
| 14 | |
PS_TPENFR | DATUM | DATS | 8 | 0 | Earliest scheduled finish (from forecast dates) | ||
| 15 | |
PS_TPSTSP | DATUM | DATS | 8 | 0 | Latest scheduled start (from forecast dates) | ||
| 16 | |
PS_TPENSP | DATUM | DATS | 8 | 0 | Latest scheduled finish (from forecast dates) | ||
| 17 | |
PS_ISTST | DATUM | DATS | 8 | 0 | Actual start date | ||
| 18 | |
PS_ISTEN | DATUM | DATS | 8 | 0 | Actual finish date | ||
| 19 | |
PS_DATFS | DATUM | DATS | 8 | 0 | Earliest start date | ||
| 20 | |
PS_DATSE | DATUM | DATS | 8 | 0 | Latest finish date | ||
| 21 | |
PS_EDAUER | DAUER_4_1 | QUAN | 5 | 1 | Duration | ||
| 22 | |
PS_DAUEH | MEINS | UNIT | 3 | 0 | Actual duration unit | T006 | |
| 23 | |
PS_PDAUER | DAUER_4_1 | QUAN | 5 | 1 | Forecast duration | ||
| 24 | |
PS_DAUEH | MEINS | UNIT | 3 | 0 | Actual duration unit | T006 | |
| 25 | |
PS_VDAUER | DAUER_4_1 | QUAN | 5 | 1 | Tentative duration | ||
| 26 | |
PS_DAUEH | MEINS | UNIT | 3 | 0 | Actual duration unit | T006 | |
| 27 | |
PS_IDAUER | DAUER_4_1 | QUAN | 5 | 1 | Actual duration | ||
| 28 | |
PS_DAUEH | MEINS | UNIT | 3 | 0 | Actual duration unit | T006 | |
| 29 | |
PS_RDAUER | DAUER_4_1 | QUAN | 5 | 1 | Remaining duration | ||
| 30 | |
PS_DAUEH | MEINS | UNIT | 3 | 0 | Actual duration unit | T006 | |
| 31 | |
PS_ABARBD | CO_ABARB | NUMC | 3 | 0 | Processing % of duration | ||
| 32 | |
PS_EARBEI | PS_ARBEIT | QUAN | 9 | 1 | Work | ||
| 33 | |
PS_ARBEH | MEINS | UNIT | 3 | 0 | Unit for work | T006 | |
| 34 | |
PS_PARBEI | PS_ARBEIT | QUAN | 9 | 1 | Forecast work | ||
| 35 | |
PS_ARBEH | MEINS | UNIT | 3 | 0 | Unit for work | T006 | |
| 36 | |
PS_VARBEI | PS_ARBEIT | QUAN | 9 | 1 | Tentative work | ||
| 37 | |
PS_ARBEH | MEINS | UNIT | 3 | 0 | Unit for work | T006 | |
| 38 | |
PS_IARBEI | PS_ARBEIT | QUAN | 9 | 1 | Actual work | ||
| 39 | |
PS_ARBEH | MEINS | UNIT | 3 | 0 | Unit for work | T006 | |
| 40 | |
PS_RARBEI | PS_ARBEIT | QUAN | 9 | 1 | Remaining work | ||
| 41 | |
PS_ARBEH | MEINS | UNIT | 3 | 0 | Unit for work | T006 | |
| 42 | |
PS_ABARBA | CO_ABARB | NUMC | 3 | 0 | Percent of completion for work | ||
| 43 | |
USRCHAR20 | USRCHAR20 | CHAR | 20 | 0 | User field with 20 characters | ||
| 44 | |
USRCHAR20 | USRCHAR20 | CHAR | 20 | 0 | User field with 20 characters | ||
| 45 | |
USRCHAR10 | USRCHAR10 | CHAR | 10 | 0 | User field with 10 characters | ||
| 46 | |
USRCHAR10 | USRCHAR10 | CHAR | 10 | 0 | User field with 10 characters | ||
| 47 | |
USRQUAN13 | USRQUAN13 | QUAN | 13 | 3 | User field for quantity (length 10.3) | ||
| 48 | |
USRUNIT | MEINS | UNIT | 3 | 0 | User field: Unit for quantity fields | T006 | |
| 49 | |
USRQUAN13 | USRQUAN13 | QUAN | 13 | 3 | User field for quantity (length 10.3) | ||
| 50 | |
USRUNIT | MEINS | UNIT | 3 | 0 | User field: Unit for quantity fields | T006 | |
| 51 | |
USRCURR13 | USRCURR13 | CURR | 13 | 3 | User-defined field for values (length 10,3) | ||
| 52 | |
USRCUKY | WAERS | CUKY | 5 | 0 | User field: Unit for value fields | TCURC | |
| 53 | |
USRCURR13 | USRCURR13 | CURR | 13 | 3 | User-defined field for values (length 10,3) | ||
| 54 | |
USRCUKY | WAERS | CUKY | 5 | 0 | User field: Unit for value fields | TCURC | |
| 55 | |
USRDATE | USRDATE | DATS | 8 | 0 | User field for date | ||
| 56 | |
USRDATE | USRDATE | DATS | 8 | 0 | User field for date | ||
| 57 | |
USRFLAG | FLAG | CHAR | 1 | 0 | User-defined field: Indicator for reports | ||
| 58 | |
USRFLAG | FLAG | CHAR | 1 | 0 | User-defined field: Indicator for reports | ||
| 59 | |
PS_VERNR_C | CHAR8 | CHAR | 8 | 0 | Number of responsible person (project mgr)/MRP controller | ||
| 60 | |
PS_VERNA | PS_VERNA | CHAR | 25 | 0 | Name of responsible person (Project manager) | ||
| 61 | |
ARBPL | ARBPL | CHAR | 8 | 0 | Work center | ||
| 62 | |
NW_PRIO | NW_PRIO | CHAR | 1 | 0 | Priority | TCN07 | |
| 63 | |
STATUSTEXT | CHAR40 | CHAR | 40 | 0 | Edited status text | ||
| 64 | |
PS_STUFE | INT1 | INT1 | 3 | 0 | Level in project hierarchy | ||
| 65 | |
FRUEHER | DAUER_4_1 | QUAN | 5 | 1 | Actual start is before earliest scheduled start | ||
| 66 | |
SPAETER | DAUER_4_1 | QUAN | 5 | 1 | Actual Finish/Planned Finish After Latest Scheduled Finish | ||
| 67 | |
VERZUG | DAUER_4_1 | QUAN | 5 | 1 | Duration After Latest Scheduled Finish | ||
| 68 | |
VORBEI | DAUER_4_1 | QUAN | 5 | 1 | Duration After Latest Scheduled Start | ||
| 69 | |
VERZ_EINHT | MEINS | UNIT | 3 | 0 | Unit for Duration of the Delay | T006 | |
| 70 | |
WAERS | WAERS | CUKY | 5 | 0 | Currency Key | TCURC | |
| 71 | |
OWAERS | WAERS | CUKY | 5 | 0 | Object currency for network activity | * | |
| 72 | |
PUFFR_GESM | PUFFER | DEC | 3 | 0 | Total float | ||
| 73 | |
PUFFR_FREI | PUFFER | DEC | 3 | 0 | Free float | ||
| 74 | |
PPUFF_GESM | PUFFER | DEC | 3 | 0 | Total float (from forecast) | ||
| 75 | |
PPUFF_FREI | PUFFER | DEC | 3 | 0 | Free float (from forecast) | ||
| 76 | |
PS_PGSBR | GSBER | CHAR | 4 | 0 | Business area for WBS element | * | |
| 77 | |
PRCTR | PRCTR | CHAR | 10 | 0 | Profit Center | * | |
| 78 | |
SAKTO | SAKNR | CHAR | 10 | 0 | Cost Element | * | |
| 79 | |
FABKL | WFCID | CHAR | 2 | 0 | Factory calendar key | * | |
| 80 | |
WERKS_D | WERKS | CHAR | 4 | 0 | Plant | * | |
| 81 | |
BUKRS | BUKRS | CHAR | 4 | 0 | Company Code | * | |
| 82 | |
PS_ASTNR | PS_ASTNR | NUMC | 8 | 0 | Applicant number | * | |
| 83 | |
AUFKALSM | KALSM | CHAR | 6 | 0 | Costing Sheet | * | |
| 84 | |
AUFZSCHL | CHAR6 | CHAR | 6 | 0 | Overhead key | ||
| 85 | |
ABGR_SCHL | ABGR_SCHL | CHAR | 6 | 0 | Results Analysis Key | * | |
| 86 | |
PS_ZSCHM | PS_ZSCHM | CHAR | 7 | 0 | Interest Profile for Project/Order Interest Calculation | * | |
| 87 | |
PS_PLAKZ | XFELD | CHAR | 1 | 0 | Indicator: Planning element | ||
| 88 | |
PS_BELKZ | XFELD | CHAR | 1 | 0 | Indicator: Account assignment element | ||
| 89 | |
PS_FAKKZ | XFELD | CHAR | 1 | 0 | Indicator: Billing element | ||
| 90 | |
0 | 0 | Key Figures for Commercial Reporting in Structure Overview | |||||
| 91 | |
0 | 0 | RPSCO_LIS for graphics | |||||
| 92 | |
PROKSTPLAN | WERTV8 | CURR | 15 | 2 | Current project cost plan | ||
| 93 | |
PROKSTPLN2 | WERTV8 | CURR | 15 | 2 | Project cost plan (version 2) | ||
| 94 | |
AUFKSTPLAN | WERTV8 | CURR | 15 | 2 | Current order cost plan | ||
| 95 | |
AUFKSTPLN2 | WERTV8 | CURR | 15 | 2 | Order cost plan (version 2) | ||
| 96 | |
PROERLPLAN | WERTV8 | CURR | 15 | 2 | Current project revenue plan | ||
| 97 | |
PROERLPLN2 | WERTV8 | CURR | 15 | 2 | Project revenue plan (version 2) | ||
| 98 | |
AUFERLPLAN | WERTV8 | CURR | 15 | 2 | Current order revenue plan | ||
| 99 | |
AUFERLPLN2 | WERTV8 | CURR | 15 | 2 | Order revenue plan (version 2) | ||
| 100 | |
KREDFINPLN | WERTV8 | CURR | 15 | 2 | Current financial budget, credit side | ||
| 101 | |
DEBFINPLN | WERTV8 | CURR | 15 | 2 | Current cash budget, debit side | ||
| 102 | |
BUDGET | WERTV8 | CURR | 15 | 2 | Budget of a Measure (App. Request Variant Was Replaced) | ||
| 103 | |
FREIGABE | WERTV8 | CURR | 15 | 2 | Release | ||
| 104 | |
AUFTRANF | WERTV8 | CURR | 15 | 2 | Residual order plan | ||
| 105 | |
FESTPROBL | WERTV8 | CURR | 15 | 2 | Fixed price commitment | ||
| 106 | |
KSTOBLGES | WERTV8 | CURR | 15 | 2 | Total cost commitment | ||
| 107 | |
ISTKOSTEN | WERTV8 | CURR | 15 | 2 | Actual costs | ||
| 108 | |
ISTERLOESE | WERTV8 | CURR | 15 | 2 | Actual revenues | ||
| 109 | |
KZHLNG | WERTV8 | CURR | 15 | 2 | Total credit side payments (down payments and payments) | ||
| 110 | |
DZHLNG | WERTV8 | CURR | 15 | 2 | Total debit side payments (down payments and payments) | ||
| 111 | |
0 | 0 | Append Structure RCJ_RPSCO_LIS | |||||
| 112 | |
0 | 0 | RPSCO_LIS for Graphic (Object Currency) | |||||
| 113 | |
PROKSTPLANOC | WERTV8 | CURR | 15 | 2 | Current Project Cost Plan in Object Currency | ||
| 114 | |
PROKSTPLN2OC | WERTV8 | CURR | 15 | 2 | Project Cost Plan (Version 2) in Object Currency | ||
| 115 | |
AUFKSTPLANOC | WERTV8 | CURR | 15 | 2 | Current Order Cost Plan in Object Currency | ||
| 116 | |
AUFKSTPLN2OC | WERTV8 | CURR | 15 | 2 | Order Cost Plan (Version 2) in Object Currency | ||
| 117 | |
PROERLPLANOC | WERTV8 | CURR | 15 | 2 | Current Project Revenue Plan in Object Currency | ||
| 118 | |
PROERLPLN2OC | WERTV8 | CURR | 15 | 2 | Project Revenue Plan (Version 2) in Object Currency | ||
| 119 | |
AUFERLPLANOC | WERTV8 | CURR | 15 | 2 | Current Order Revenue Plan in Object Currency | ||
| 120 | |
AUFERLPLN2OC | WERTV8 | CURR | 15 | 2 | Order Revenue Plan (Version 2) in Object Currency | ||
| 121 | |
KREDFINPLNOC | WERTV8 | CURR | 15 | 2 | Current Credit Side Cash Budget in Object Currency | ||
| 122 | |
DEBFINPLNOC | WERTV8 | CURR | 15 | 2 | Current Debit Side Cash Budget in Object Currency | ||
| 123 | |
BUDGETOC | WERTV8 | CURR | 15 | 2 | Appropriation Budget (Appr.Request Variant Replaced) in OC | ||
| 124 | |
FREIGABEOC | WERTV8 | CURR | 15 | 2 | Release in Object Currency | ||
| 125 | |
AUFTRANFOC | WERTV8 | CURR | 15 | 2 | Residual Order Plan in Object Currency | ||
| 126 | |
FESTPROBLOC | WERTV8 | CURR | 15 | 2 | Fixed Price Commitment in Object Currency | ||
| 127 | |
KSTOBLGESOC | WERTV8 | CURR | 15 | 2 | Total Cost Commitment in Object Currency | ||
| 128 | |
ISTKOSTENOC | WERTV8 | CURR | 15 | 2 | Act. Costs in Object Currency | ||
| 129 | |
ISTERLOESEOC | WERTV8 | CURR | 15 | 2 | Actual Revenues in Object Currency | ||
| 130 | |
KZHLNGOC | WERTV8 | CURR | 15 | 2 | Total Vendor Payments (Down Payments and Payments) OC | ||
| 131 | |
DZHLNGOC | WERTV8 | CURR | 15 | 2 | Total Customer Payments (Down Payments and Payments) OC | ||
| 132 | |
0 | 0 | Progress Calculation: All | |||||
| 133 | |
0 | 0 | Progress Analysis: Values | |||||
| 134 | |
EVPLANORG1 | WERTV8 | CURR | 15 | 2 | Budgeted cost of work scheduled | ||
| 135 | |
EVACTORG1 | WERTV8 | CURR | 15 | 2 | Budgeted cost of work performed | ||
| 136 | |
EVACTCORR1 | WERTV8 | CURR | 15 | 2 | Budgeted cost of work performed, adjusted | ||
| 137 | |
0 | 0 | Progress Analysis: Quantities | |||||
| 138 | |
EVPLANQUANORG1 | CQUA8 | QUAN | 15 | 3 | Budgeted cost of work scheduled, quantity | ||
| 139 | |
EV_PLAN_QUAN_ORG1_UNIT | MEINS | UNIT | 3 | 0 | BCWS, Unit of Measure | * | |
| 140 | |
EVACTQUANORG1 | CQUA8 | QUAN | 15 | 3 | Budgeted cost of work performed, quantity | ||
| 141 | |
EV_ACT_QUAN_ORG1_UNIT | MEINS | UNIT | 3 | 0 | BCWP, Unit of Measure | * | |
| 142 | |
EVACTQUANCORR1 | CQUA8 | QUAN | 15 | 3 | Budgeted cost of work performed, adjusted quantity | ||
| 143 | |
EV_ACT_QUAN_CORR1_UNIT | MEINS | UNIT | 3 | 0 | BCWP, Adjusted Quantity (Unit) | * | |
| 144 | |
0 | 0 | Progress Analysis: Percentage of completion (POC) | |||||
| 145 | |
POCPLANORGAGG1 | EV_PROGRES | DEC | 6 | 3 | Aggregate planned percentage of completion | ||
| 146 | |
POCPLANORGNAGG1 | EV_PROGRES | DEC | 6 | 3 | Non-aggregated planned percentage of completion | ||
| 147 | |
POCACTORGAGG1 | EV_PROGRES | DEC | 6 | 3 | Aggregated actual POC | ||
| 148 | |
POCACTORGNAGG1 | EV_PROGRES | DEC | 6 | 3 | Non-aggregated actual percentage of completion | ||
| 149 | |
POCACTCORRAGG1 | EV_PROGRES | DEC | 6 | 3 | Adjusted aggregated actual POC | ||
| 150 | |
POCACTCORRNAGG1 | EV_PROGRES | DEC | 6 | 3 | Adjusted non-aggregated actual percentage of completion | ||
| 151 | |
EWALVARORG | WERTV8 | CURR | 15 | 2 | Cost Variance Based on EV_ACT_ORG1 | ||
| 152 | |
EVSCHVARORG | WERTV8 | CURR | 15 | 2 | Schedule Variance Based on EV_ACT_ORG1 | ||
| 153 | |
EWALINDXORG | DEC5_2 | DEC | 7 | 2 | Cost Index Based on EV_ACT_ORG1 | ||
| 154 | |
EVSCHINDXORG | DEC5_2 | DEC | 7 | 2 | Date Index Based on POC_ACT_ORG_AGG1 | ||
| 155 | |
EWALVARCORR | WERTV8 | CURR | 15 | 2 | Cost Variance Based on EV_ACT_CORR1 | ||
| 156 | |
EVSCHVARCORR | WERTV8 | CURR | 15 | 2 | Schedule Variance Based on EV_ACT_CORR1 | ||
| 157 | |
EWALINDXCORR | DEC5_2 | DEC | 7 | 2 | Cost Index Based on EV_ACT_CORR1 | ||
| 158 | |
EVSCHINDXCORR | DEC5_2 | DEC | 7 | 2 | Date Index Based on POC_ACT_CORR_AGG1 | ||
| 159 | |
0 | 0 | Append Structure: Progress Determination | |||||
| 160 | |
0 | 0 | Progress Determination (Object Currency) | |||||
| 161 | |
0 | 0 | Progress Analysis: Progress Values (PV; Object Currency) | |||||
| 162 | |
EVPLANORG1 | WERTV8 | CURR | 15 | 2 | Budgeted cost of work scheduled | ||
| 163 | |
EVACTORG1 | WERTV8 | CURR | 15 | 2 | Budgeted cost of work performed | ||
| 164 | |
EVACTCORR1 | WERTV8 | CURR | 15 | 2 | Budgeted cost of work performed, adjusted | ||
| 165 | |
EWALVARORG | WERTV8 | CURR | 15 | 2 | Cost Variance Based on EV_ACT_ORG1 | ||
| 166 | |
EVSCHVARORG | WERTV8 | CURR | 15 | 2 | Schedule Variance Based on EV_ACT_ORG1 | ||
| 167 | |
EWALVARCORR | WERTV8 | CURR | 15 | 2 | Cost Variance Based on EV_ACT_CORR1 | ||
| 168 | |
EVSCHVARCORR | WERTV8 | CURR | 15 | 2 | Schedule Variance Based on EV_ACT_CORR1 | ||
| 169 | |
STEUS | STEUS | CHAR | 4 | 0 | Control key | * | |
| 170 | |
CO_DAUBEA | DAUER_6_1 | QUAN | 7 | 1 | Processing time | ||
| 171 | |
BEAZE | EINHEIT | UNIT | 3 | 0 | Unit of measure for processing time | ||
| 172 | |
PLIFZ | DEC3 | DEC | 3 | 0 | Planned delivery time in days | ||
| 173 | |
PS_PRART | PS_PRART | CHAR | 2 | 0 | Project type | * | |
| 174 | |
0 | 0 | Structur extension for planned data | |||||
| 175 | |
J_OBJNR | J_OBJNR | CHAR | 22 | 0 | Object number | * | |
| 176 | |
GJAHR | GJAHR | NUMC | 4 | 0 | Fiscal Year | ||
| 177 | |
CO_PERIO | PERBL | NUMC | 3 | 0 | Period | ||
| 178 | |
MEINH | MEINS | UNIT | 3 | 0 | Unit of Measure for Display | * | |
| 179 | |
PERIV | PERIV | CHAR | 2 | 0 | Fiscal Year Variant | * | |
| 180 | |
PS_UNTRG | CHAR1 | CHAR | 1 | 0 | Indicator: Element is subdivided | ||
| 181 | |
SELKZ | SELKZ | CHAR | 1 | 0 | Selection flag | ||
| 182 | |
OBJEKT_ID | CHAR30 | CHAR | 30 | 0 | ID/Object key | ||
| 183 | |
OBJEKT_ID | CHAR30 | CHAR | 30 | 0 | ID/Object key | ||
| 184 | |
FSAVZ | ATIME | TIMS | 6 | 0 | Earliest scheduled start: Execution (time) | ||
| 185 | |
FSAVZ | ATIME | TIMS | 6 | 0 | Earliest scheduled start: Execution (time) | ||
| 186 | |
FSAVZ | ATIME | TIMS | 6 | 0 | Earliest scheduled start: Execution (time) | ||
| 187 | |
FSAVZ | ATIME | TIMS | 6 | 0 | Earliest scheduled start: Execution (time) | ||
| 188 | |
FSAVZ | ATIME | TIMS | 6 | 0 | Earliest scheduled start: Execution (time) | ||
| 189 | |
FSAVZ | ATIME | TIMS | 6 | 0 | Earliest scheduled start: Execution (time) | ||
| 190 | |
FSAVZ | ATIME | TIMS | 6 | 0 | Earliest scheduled start: Execution (time) | ||
| 191 | |
FSAVZ | ATIME | TIMS | 6 | 0 | Earliest scheduled start: Execution (time) | ||
| 192 | |
FSAVZ | ATIME | TIMS | 6 | 0 | Earliest scheduled start: Execution (time) | ||
| 193 | |
FSAVZ | ATIME | TIMS | 6 | 0 | Earliest scheduled start: Execution (time) | ||
| 194 | |
FSAVD | DATUM | DATS | 8 | 0 | Earliest scheduled start: Execution (date) | ||
| 195 | |
FSAVZ | ATIME | TIMS | 6 | 0 | Earliest scheduled start: Execution (time) | ||
| 196 | |
FSAVD | DATUM | DATS | 8 | 0 | Earliest scheduled start: Execution (date) | ||
| 197 | |
FSAVZ | ATIME | TIMS | 6 | 0 | Earliest scheduled start: Execution (time) | ||
| 198 | |
FSAVD | DATUM | DATS | 8 | 0 | Earliest scheduled start: Execution (date) | ||
| 199 | |
FSAVZ | ATIME | TIMS | 6 | 0 | Earliest scheduled start: Execution (time) | ||
| 200 | |
FSAVD | DATUM | DATS | 8 | 0 | Earliest scheduled start: Execution (date) | ||
| 201 | |
FSAVZ | ATIME | TIMS | 6 | 0 | Earliest scheduled start: Execution (time) | ||
| 202 | |
FSAVZ | ATIME | TIMS | 6 | 0 | Earliest scheduled start: Execution (time) | ||
| 203 | |
FSAVZ | ATIME | TIMS | 6 | 0 | Earliest scheduled start: Execution (time) | ||
| 204 | |
FSAVZ | ATIME | TIMS | 6 | 0 | Earliest scheduled start: Execution (time) | ||
| 205 | |
FSAVZ | ATIME | TIMS | 6 | 0 | Earliest scheduled start: Execution (time) | ||
| 206 | |
FSAVD | DATUM | DATS | 8 | 0 | Earliest scheduled start: Execution (date) | ||
| 207 | |
FSAVZ | ATIME | TIMS | 6 | 0 | Earliest scheduled start: Execution (time) | ||
| 208 | |
FSAVD | DATUM | DATS | 8 | 0 | Earliest scheduled start: Execution (date) | ||
| 209 | |
FSAVZ | ATIME | TIMS | 6 | 0 | Earliest scheduled start: Execution (time) | ||
| 210 | |
EINSCHRA | RESTRIKSTR | CHAR | 1 | 0 | Constraint on the basic start date for the activity | ||
| 211 | |
EINSCHRA | RESTRIKSTR | CHAR | 1 | 0 | Constraint on the basic start date for the activity | ||
| 212 | |
FSAVD | DATUM | DATS | 8 | 0 | Earliest scheduled start: Execution (date) | ||
| 213 | |
FSAVZ | ATIME | TIMS | 6 | 0 | Earliest scheduled start: Execution (time) | ||
| 214 | |
FSAVD | DATUM | DATS | 8 | 0 | Earliest scheduled start: Execution (date) | ||
| 215 | |
FSAVZ | ATIME | TIMS | 6 | 0 | Earliest scheduled start: Execution (time) | ||
| 216 | |
EINSCHRA | RESTRIKSTR | CHAR | 1 | 0 | Constraint on the basic start date for the activity | ||
| 217 | |
EINSCHRA | RESTRIKSTR | CHAR | 1 | 0 | Constraint on the basic start date for the activity | ||
| 218 | |
FSAVD | DATUM | DATS | 8 | 0 | Earliest scheduled start: Execution (date) | ||
| 219 | |
FSAVZ | ATIME | TIMS | 6 | 0 | Earliest scheduled start: Execution (time) | ||
| 220 | |
FSAVD | DATUM | DATS | 8 | 0 | Earliest scheduled start: Execution (date) | ||
| 221 | |
FSAVZ | ATIME | TIMS | 6 | 0 | Earliest scheduled start: Execution (time) | ||
| 222 | |
FSAVD | DATUM | DATS | 8 | 0 | Earliest scheduled start: Execution (date) | ||
| 223 | |
FSAVZ | ATIME | TIMS | 6 | 0 | Earliest scheduled start: Execution (time) | ||
| 224 | |
PS_STUFE | INT1 | INT1 | 3 | 0 | Level in project hierarchy | ||
| 225 | |
PS_WBSIND | SYST_LONG | INT4 | 10 | 0 | Document table index for WBS elements | ||
| 226 | |
AUFNR | AUFNR | CHAR | 12 | 0 | Order Number | * | |
| 227 | |
VORNR | VORNR | CHAR | 4 | 0 | Operation/Activity Number | ||
| 228 | |
VORNR | VORNR | CHAR | 4 | 0 | Operation/Activity Number | ||
| 229 | |
PS_WBSIND | SYST_LONG | INT4 | 10 | 0 | Document table index for WBS elements | ||
| 230 | |
AUFNR | AUFNR | CHAR | 12 | 0 | Order Number | * | |
| 231 | |
VORNR | VORNR | CHAR | 4 | 0 | Operation/Activity Number | ||
| 232 | |
PS_STUFE | INT1 | INT1 | 3 | 0 | Level in project hierarchy | ||
| 233 | |
SELKZ | SELKZ | CHAR | 1 | 0 | Selection flag | ||
| 234 | |
BCCHARTID | BCINT4 | INT4 | 10 | 0 | Identification of chart in bar chart | ||
| 235 | |
PS_WBSIND | SYST_LONG | INT4 | 10 | 0 | Document table index for WBS elements | ||
| 236 | |
AUFNR | AUFNR | CHAR | 12 | 0 | Order Number | * | |
| 237 | |
CO_AUFPL | AUFPL | NUMC | 10 | 0 | Routing number of operations in the order | ||
| 238 | |
CO_APLZL | CO_APLZL | NUMC | 8 | 0 | General counter for order | * | |
| 239 | |
CO_AUFPL | AUFPL | NUMC | 10 | 0 | Routing number of operations in the order | ||
| 240 | |
CO_APLZL | CO_APLZL | NUMC | 8 | 0 | General counter for order | * | |
| 241 | |
BCROWNUMB | BCINT4 | INT4 | 10 | 0 | Line number in bar chart | ||
| 242 | |
PS_WBSIND | SYST_LONG | INT4 | 10 | 0 | Document table index for WBS elements | ||
| 243 | |
PS_NWIND | SYST_LONG | INT4 | 10 | 0 | Document table index for networks | ||
| 244 | |
INDEX_PLFL | TABIX | INT4 | 10 | 0 | Index referring to record table for sequences | ||
| 245 | |
PS_ACTIND | SYST_LONG | INT4 | 10 | 0 | Doc. table index for activities | ||
| 246 | |
PS_ACTIND | SYST_LONG | INT4 | 10 | 0 | Doc. table index for activities | ||
| 247 | |
PS_MSTIND | SYST_LONG | INT4 | 10 | 0 | Document table index for milestones | ||
| 248 | |
PS_MATIND | TABIX | INT4 | 10 | 0 | Document table index for material components | ||
| 249 | |
SELKZ | SELKZ | CHAR | 1 | 0 | Selection flag | ||
| 250 | |
PS_POSNR | PS_POSNR | NUMC | 8 | 0 | WBS Element | * | |
| 251 | |
SELKZ | SELKZ | CHAR | 1 | 0 | Selection flag | ||
| 252 | |
SELKZ | SELKZ | CHAR | 1 | 0 | Selection flag | ||
| 253 | |
CY_IND_OBJ | SYST_LONG | INT4 | 10 | 0 | Index to object | ||
| 254 | |
SELKZ | SELKZ | CHAR | 1 | 0 | Selection flag | ||
| 255 | |
SELKZ | SELKZ | CHAR | 1 | 0 | Selection flag | ||
| 256 | |
SELKZ | SELKZ | CHAR | 1 | 0 | Selection flag | ||
| 257 | |
SELKZ | SELKZ | CHAR | 1 | 0 | Selection flag | ||
| 258 | |
BCBOXID | BCINT4 | INT4 | 10 | 0 | Identification for box in bar chart | ||
| 259 | |
BCNODEID | BCINT4 | INT4 | 10 | 0 | Identification for nodes in bar chart | ||
| 260 | |
BCBOXID | BCINT4 | INT4 | 10 | 0 | Identification for box in bar chart | ||
| 261 | |
BCBOXID | BCINT4 | INT4 | 10 | 0 | Identification for box in bar chart | ||
| 262 | |
SELKZ | SELKZ | CHAR | 1 | 0 | Selection flag | ||
| 263 | |
SELKZ | SELKZ | CHAR | 1 | 0 | Selection flag | ||
| 264 | |
SELKZ | SELKZ | CHAR | 1 | 0 | Selection flag | ||
| 265 | |
SELKZ | SELKZ | CHAR | 1 | 0 | Selection flag | ||
| 266 | |
AUFTYP | AUFTYP | NUMC | 2 | 0 | Order category | ||
| 267 | |
AUFART | AUFART | CHAR | 4 | 0 | Order Type | * | |
| 268 | |
OWAERS | WAERS | CUKY | 5 | 0 | Object currency for network activity | * | |
| 269 | |
SELKZ | SELKZ | CHAR | 1 | 0 | Selection flag | ||
| 270 | |
BCBOXID | BCINT4 | INT4 | 10 | 0 | Identification for box in bar chart | ||
| 271 | |
BCVALSVAL | TEXT80 | CHAR | 80 | 0 | Value in value table | ||
| 272 | |
CK_KALNR | CK_KALNR | NUMC | 12 | 0 | Cost Estimate Number for Cost Est. w/o Qty Structure | * | |
| 273 | |
SELKZ | SELKZ | CHAR | 1 | 0 | Selection flag |
Foreign Keys
| |
Source Table | Source Column | Foreign Table | Foreign Column | Dependency Factor | Cardinality left | Cardinality right |
|---|---|---|---|---|---|---|---|
| 1 | RCJ_PS_PPT | EARBEH | |
|
REF | C | CN |
| 2 | RCJ_PS_PPT | EDAUEH | |
|
REF | C | CN |
| 3 | RCJ_PS_PPT | IARBEH | |
|
REF | C | CN |
| 4 | RCJ_PS_PPT | IDAUEH | |
|
REF | C | CN |
| 5 | RCJ_PS_PPT | PARBEH | |
|
REF | C | CN |
| 6 | RCJ_PS_PPT | PDAUEH | |
|
REF | C | CN |
| 7 | RCJ_PS_PPT | PSPRI | |
|
REF | C | CN |
| 8 | RCJ_PS_PPT | RARBEH | |
|
REF | C | CN |
| 9 | RCJ_PS_PPT | RDAUEH | |
|
REF | C | CN |
| 10 | RCJ_PS_PPT | USE04 | |
|
|||
| 11 | RCJ_PS_PPT | USE05 | |
|
|||
| 12 | RCJ_PS_PPT | USE06 | |
|
|||
| 13 | RCJ_PS_PPT | USE07 | |
|
|||
| 14 | RCJ_PS_PPT | VARBEH | |
|
REF | C | CN |
| 15 | RCJ_PS_PPT | VDAUEH | |
|
REF | C | CN |
| 16 | RCJ_PS_PPT | VEINH | |
|
REF | C | CN |
| 17 | RCJ_PS_PPT | WAERS | |
|
REF | C | CN |
History
| Last changed by/on | SAP | 20130529 |
| SAP Release Created in |