SAP ABAP Data Element PS_RARBEI (Remaining work)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷
PS-IS (Application Component) Information System
⤷
CNIS (Package) Application development R/3 PS information system
⤷
⤷
Basic Data
| Data Element | PS_RARBEI |
| Short Description | Remaining work |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | PS_ARBEIT | |
| Data Type | QUAN | Quantity field, points to a unit field with format UNIT |
| Length | 9 | |
| Decimal Places | 1 | |
| Output Length | 12 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | ||
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | Work (R) |
| Medium | 15 | Remaining work |
| Long | 20 | Remaining work |
| Heading | 12 | Remain. work |
Documentation
Definition
Specifies the remaining work for a network activity.
The different cases are as follows:
- Activity is finally confirmed
-> Remaining work = 0
- Activity is partially confirmed
-> Remaining work = Forecast work minus actual work
- The remaining work cannot be calculated for ativities with confirmation via person assignment (split) and for the activity.
- The remaining work can only be calculated for activities exclusively confirmed via person assignment (split) if the forecast work is set.
- Activity is not yet confirmed
-> Remaining work = Forecast work or work for the activity