SAP ABAP Table RCJ_PS_ORD (All Objects in the Project Planning Board)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷ PS-ST-OPR-PPB (Application Component) Project Planning Board
⤷ CN_PPT_GRAFIK (Package) Project Planning Board
⤷ PS-ST-OPR-PPB (Application Component) Project Planning Board
⤷ CN_PPT_GRAFIK (Package) Project Planning Board
Basic Data
Table Category | INTTAB | Structure |
Structure | RCJ_PS_ORD | Table Relationship Diagram |
Short Description | All Objects in the Project Planning Board |
Delivery and Maintenance
Pool/cluster | ||
Delivery Class | ||
Data Browser/Table View Maintenance | Display/Maintenance Allowed with Restrictions |
Components
Field | Key | Data Element | Domain | Data Type |
Length | Decimal Places |
Short Description | Check table |
|
---|---|---|---|---|---|---|---|---|---|
1 | .INCLUDE | 0 | 0 | Object Structure for Project Reporting | |||||
2 | OBJEKTID | OBJEKT_ID | CHAR30 | CHAR | 30 | 0 | ID/Object key | ||
3 | KURZTEXT | KURZTEXT | TEXT40 | CHAR | 40 | 0 | Short text/description of the object | ||
4 | OBJEKTTYP | OTEXT | TEXT25 | CHAR | 25 | 0 | Object Type Text | ||
5 | ECKST | PS_ECKST | DATUM | DATS | 8 | 0 | Basic start date | ||
6 | ECKEN | PS_ECKEN | DATUM | DATS | 8 | 0 | Finish date (from basic dates) | ||
7 | PROGST | PS_PROGST | DATUM | DATS | 8 | 0 | Forecast start date | ||
8 | PROGEN | PS_PROGEN | DATUM | DATS | 8 | 0 | Forecast finish date | ||
9 | TESTFR | PS_TESTFR | DATUM | DATS | 8 | 0 | Earliest scheduled start (from basic dates) | ||
10 | TEENFR | PS_TEENFR | DATUM | DATS | 8 | 0 | Earliest scheduled finish (from basic dates) | ||
11 | TESTSP | PS_TESTSP | DATUM | DATS | 8 | 0 | Latest scheduled start (from basic dates) | ||
12 | TEENSP | PS_TEENSP | DATUM | DATS | 8 | 0 | Latest scheduled finish (from basic dates) | ||
13 | TPSTFR | PS_TPSTFR | DATUM | DATS | 8 | 0 | Earliest scheduled start (from forecast dates) | ||
14 | TPENFR | PS_TPENFR | DATUM | DATS | 8 | 0 | Earliest scheduled finish (from forecast dates) | ||
15 | TPSTSP | PS_TPSTSP | DATUM | DATS | 8 | 0 | Latest scheduled start (from forecast dates) | ||
16 | TPENSP | PS_TPENSP | DATUM | DATS | 8 | 0 | Latest scheduled finish (from forecast dates) | ||
17 | ISTST | PS_ISTST | DATUM | DATS | 8 | 0 | Actual start date | ||
18 | ISTEN | PS_ISTEN | DATUM | DATS | 8 | 0 | Actual finish date | ||
19 | DATFS | PS_DATFS | DATUM | DATS | 8 | 0 | Earliest start date | ||
20 | DATSE | PS_DATSE | DATUM | DATS | 8 | 0 | Latest finish date | ||
21 | EDAUER | PS_EDAUER | DAUER_4_1 | QUAN | 5 | 1 | Duration | ||
22 | EDAUEH | PS_DAUEH | MEINS | UNIT | 3 | 0 | Actual duration unit | T006 | |
23 | PDAUER | PS_PDAUER | DAUER_4_1 | QUAN | 5 | 1 | Forecast duration | ||
24 | PDAUEH | PS_DAUEH | MEINS | UNIT | 3 | 0 | Actual duration unit | T006 | |
25 | VDAUER | PS_VDAUER | DAUER_4_1 | QUAN | 5 | 1 | Tentative duration | ||
26 | VDAUEH | PS_DAUEH | MEINS | UNIT | 3 | 0 | Actual duration unit | T006 | |
27 | IDAUER | PS_IDAUER | DAUER_4_1 | QUAN | 5 | 1 | Actual duration | ||
28 | IDAUEH | PS_DAUEH | MEINS | UNIT | 3 | 0 | Actual duration unit | T006 | |
29 | RDAUER | PS_RDAUER | DAUER_4_1 | QUAN | 5 | 1 | Remaining duration | ||
30 | RDAUEH | PS_DAUEH | MEINS | UNIT | 3 | 0 | Actual duration unit | T006 | |
31 | ABARBD | PS_ABARBD | CO_ABARB | NUMC | 3 | 0 | Processing % of duration | ||
32 | EARBEI | PS_EARBEI | PS_ARBEIT | QUAN | 9 | 1 | Work | ||
33 | EARBEH | PS_ARBEH | MEINS | UNIT | 3 | 0 | Unit for work | T006 | |
34 | PARBEI | PS_PARBEI | PS_ARBEIT | QUAN | 9 | 1 | Forecast work | ||
35 | PARBEH | PS_ARBEH | MEINS | UNIT | 3 | 0 | Unit for work | T006 | |
36 | VARBEI | PS_VARBEI | PS_ARBEIT | QUAN | 9 | 1 | Tentative work | ||
37 | VARBEH | PS_ARBEH | MEINS | UNIT | 3 | 0 | Unit for work | T006 | |
38 | IARBEI | PS_IARBEI | PS_ARBEIT | QUAN | 9 | 1 | Actual work | ||
39 | IARBEH | PS_ARBEH | MEINS | UNIT | 3 | 0 | Unit for work | T006 | |
40 | RARBEI | PS_RARBEI | PS_ARBEIT | QUAN | 9 | 1 | Remaining work | ||
41 | RARBEH | PS_ARBEH | MEINS | UNIT | 3 | 0 | Unit for work | T006 | |
42 | ABARBA | PS_ABARBA | CO_ABARB | NUMC | 3 | 0 | Percent of completion for work | ||
43 | USR00 | USRCHAR20 | USRCHAR20 | CHAR | 20 | 0 | User field with 20 characters | ||
44 | USR01 | USRCHAR20 | USRCHAR20 | CHAR | 20 | 0 | User field with 20 characters | ||
45 | USR02 | USRCHAR10 | USRCHAR10 | CHAR | 10 | 0 | User field with 10 characters | ||
46 | USR03 | USRCHAR10 | USRCHAR10 | CHAR | 10 | 0 | User field with 10 characters | ||
47 | USR04 | USRQUAN13 | USRQUAN13 | QUAN | 13 | 3 | User field for quantity (length 10.3) | ||
48 | USE04 | USRUNIT | MEINS | UNIT | 3 | 0 | User field: Unit for quantity fields | T006 | |
49 | USR05 | USRQUAN13 | USRQUAN13 | QUAN | 13 | 3 | User field for quantity (length 10.3) | ||
50 | USE05 | USRUNIT | MEINS | UNIT | 3 | 0 | User field: Unit for quantity fields | T006 | |
51 | USR06 | USRCURR13 | USRCURR13 | CURR | 13 | 3 | User-defined field for values (length 10,3) | ||
52 | USE06 | USRCUKY | WAERS | CUKY | 5 | 0 | User field: Unit for value fields | TCURC | |
53 | USR07 | USRCURR13 | USRCURR13 | CURR | 13 | 3 | User-defined field for values (length 10,3) | ||
54 | USE07 | USRCUKY | WAERS | CUKY | 5 | 0 | User field: Unit for value fields | TCURC | |
55 | USR08 | USRDATE | USRDATE | DATS | 8 | 0 | User field for date | ||
56 | USR09 | USRDATE | USRDATE | DATS | 8 | 0 | User field for date | ||
57 | USR10 | USRFLAG | FLAG | CHAR | 1 | 0 | User-defined field: Indicator for reports | ||
58 | USR11 | USRFLAG | FLAG | CHAR | 1 | 0 | User-defined field: Indicator for reports | ||
59 | VERNR | PS_VERNR_C | CHAR8 | CHAR | 8 | 0 | Number of responsible person (project mgr)/MRP controller | ||
60 | VERNA | PS_VERNA | PS_VERNA | CHAR | 25 | 0 | Name of responsible person (Project manager) | ||
61 | ARBPL | ARBPL | ARBPL | CHAR | 8 | 0 | Work center | ||
62 | PSPRI | NW_PRIO | NW_PRIO | CHAR | 1 | 0 | Priority | TCN07 | |
63 | STATXT | STATUSTEXT | CHAR40 | CHAR | 40 | 0 | Edited status text | ||
64 | STUFE | PS_STUFE | INT1 | INT1 | 3 | 0 | Level in project hierarchy | ||
65 | FRUEHER | FRUEHER | DAUER_4_1 | QUAN | 5 | 1 | Actual start is before earliest scheduled start | ||
66 | SPAETER | SPAETER | DAUER_4_1 | QUAN | 5 | 1 | Actual Finish/Planned Finish After Latest Scheduled Finish | ||
67 | VERZUG | VERZUG | DAUER_4_1 | QUAN | 5 | 1 | Duration After Latest Scheduled Finish | ||
68 | VORBEI | VORBEI | DAUER_4_1 | QUAN | 5 | 1 | Duration After Latest Scheduled Start | ||
69 | VEINH | VERZ_EINHT | MEINS | UNIT | 3 | 0 | Unit for Duration of the Delay | T006 | |
70 | WAERS | WAERS | WAERS | CUKY | 5 | 0 | Currency Key | TCURC | |
71 | OWAERS | OWAERS | WAERS | CUKY | 5 | 0 | Object currency for network activity | * | |
72 | PUFGS | PUFFR_GESM | PUFFER | DEC | 3 | 0 | Total float | ||
73 | PUFFR | PUFFR_FREI | PUFFER | DEC | 3 | 0 | Free float | ||
74 | PUFGP | PPUFF_GESM | PUFFER | DEC | 3 | 0 | Total float (from forecast) | ||
75 | PUFFP | PPUFF_FREI | PUFFER | DEC | 3 | 0 | Free float (from forecast) | ||
76 | GESBR | PS_PGSBR | GSBER | CHAR | 4 | 0 | Business area for WBS element | * | |
77 | PRCTR | PRCTR | PRCTR | CHAR | 10 | 0 | Profit Center | * | |
78 | SAKTO | SAKTO | SAKNR | CHAR | 10 | 0 | Cost Element | * | |
79 | KALID | FABKL | WFCID | CHAR | 2 | 0 | Factory calendar key | * | |
80 | WERKS | WERKS_D | WERKS | CHAR | 4 | 0 | Plant | * | |
81 | BUKRS | BUKRS | BUKRS | CHAR | 4 | 0 | Company Code | * | |
82 | ASTNR | PS_ASTNR | PS_ASTNR | NUMC | 8 | 0 | Applicant number | * | |
83 | KALSM | AUFKALSM | KALSM | CHAR | 6 | 0 | Costing Sheet | * | |
84 | ZSCHL | AUFZSCHL | CHAR6 | CHAR | 6 | 0 | Overhead key | ||
85 | ABGSL | ABGR_SCHL | ABGR_SCHL | CHAR | 6 | 0 | Results Analysis Key | * | |
86 | ZSCHM | PS_ZSCHM | PS_ZSCHM | CHAR | 7 | 0 | Interest Profile for Project/Order Interest Calculation | * | |
87 | PLAKZ | PS_PLAKZ | XFELD | CHAR | 1 | 0 | Indicator: Planning element | ||
88 | BELKZ | PS_BELKZ | XFELD | CHAR | 1 | 0 | Indicator: Account assignment element | ||
89 | FAKKZ | PS_FAKKZ | XFELD | CHAR | 1 | 0 | Indicator: Billing element | ||
90 | .INCLUDE | 0 | 0 | Key Figures for Commercial Reporting in Structure Overview | |||||
91 | .INCLUDE | 0 | 0 | RPSCO_LIS for graphics | |||||
92 | PROKSTPLAN | PROKSTPLAN | WERTV8 | CURR | 15 | 2 | Current project cost plan | ||
93 | PROKSTPLN2 | PROKSTPLN2 | WERTV8 | CURR | 15 | 2 | Project cost plan (version 2) | ||
94 | AUFKSTPLAN | AUFKSTPLAN | WERTV8 | CURR | 15 | 2 | Current order cost plan | ||
95 | AUFKSTPLN2 | AUFKSTPLN2 | WERTV8 | CURR | 15 | 2 | Order cost plan (version 2) | ||
96 | PROERLPLAN | PROERLPLAN | WERTV8 | CURR | 15 | 2 | Current project revenue plan | ||
97 | PROERLPLN2 | PROERLPLN2 | WERTV8 | CURR | 15 | 2 | Project revenue plan (version 2) | ||
98 | AUFERLPLAN | AUFERLPLAN | WERTV8 | CURR | 15 | 2 | Current order revenue plan | ||
99 | AUFERLPLN2 | AUFERLPLN2 | WERTV8 | CURR | 15 | 2 | Order revenue plan (version 2) | ||
100 | KREDFINPLN | KREDFINPLN | WERTV8 | CURR | 15 | 2 | Current financial budget, credit side | ||
101 | DEBFINPLN | DEBFINPLN | WERTV8 | CURR | 15 | 2 | Current cash budget, debit side | ||
102 | BUDGET | BUDGET | WERTV8 | CURR | 15 | 2 | Budget of a Measure (App. Request Variant Was Replaced) | ||
103 | FREIGABE | FREIGABE | WERTV8 | CURR | 15 | 2 | Release | ||
104 | AUFTRANF | AUFTRANF | WERTV8 | CURR | 15 | 2 | Residual order plan | ||
105 | FESTPROBL | FESTPROBL | WERTV8 | CURR | 15 | 2 | Fixed price commitment | ||
106 | KSTOBLGES | KSTOBLGES | WERTV8 | CURR | 15 | 2 | Total cost commitment | ||
107 | ISTKOSTEN | ISTKOSTEN | WERTV8 | CURR | 15 | 2 | Actual costs | ||
108 | ISTERLOESE | ISTERLOESE | WERTV8 | CURR | 15 | 2 | Actual revenues | ||
109 | KZHLNG | KZHLNG | WERTV8 | CURR | 15 | 2 | Total credit side payments (down payments and payments) | ||
110 | DZHLNG | DZHLNG | WERTV8 | CURR | 15 | 2 | Total debit side payments (down payments and payments) | ||
111 | .INCLU--AP | 0 | 0 | Append Structure RCJ_RPSCO_LIS | |||||
112 | .INCLUDE | 0 | 0 | RPSCO_LIS for Graphic (Object Currency) | |||||
113 | PROKSTPLAN_OC | PROKSTPLANOC | WERTV8 | CURR | 15 | 2 | Current Project Cost Plan in Object Currency | ||
114 | PROKSTPLN2_OC | PROKSTPLN2OC | WERTV8 | CURR | 15 | 2 | Project Cost Plan (Version 2) in Object Currency | ||
115 | AUFKSTPLAN_OC | AUFKSTPLANOC | WERTV8 | CURR | 15 | 2 | Current Order Cost Plan in Object Currency | ||
116 | AUFKSTPLN2_OC | AUFKSTPLN2OC | WERTV8 | CURR | 15 | 2 | Order Cost Plan (Version 2) in Object Currency | ||
117 | PROERLPLAN_OC | PROERLPLANOC | WERTV8 | CURR | 15 | 2 | Current Project Revenue Plan in Object Currency | ||
118 | PROERLPLN2_OC | PROERLPLN2OC | WERTV8 | CURR | 15 | 2 | Project Revenue Plan (Version 2) in Object Currency | ||
119 | AUFERLPLAN_OC | AUFERLPLANOC | WERTV8 | CURR | 15 | 2 | Current Order Revenue Plan in Object Currency | ||
120 | AUFERLPLN2_OC | AUFERLPLN2OC | WERTV8 | CURR | 15 | 2 | Order Revenue Plan (Version 2) in Object Currency | ||
121 | KREDFINPLN_OC | KREDFINPLNOC | WERTV8 | CURR | 15 | 2 | Current Credit Side Cash Budget in Object Currency | ||
122 | DEBFINPLN_OC | DEBFINPLNOC | WERTV8 | CURR | 15 | 2 | Current Debit Side Cash Budget in Object Currency | ||
123 | BUDGET_OC | BUDGETOC | WERTV8 | CURR | 15 | 2 | Appropriation Budget (Appr.Request Variant Replaced) in OC | ||
124 | FREIGABE_OC | FREIGABEOC | WERTV8 | CURR | 15 | 2 | Release in Object Currency | ||
125 | AUFTRANF_OC | AUFTRANFOC | WERTV8 | CURR | 15 | 2 | Residual Order Plan in Object Currency | ||
126 | FESTPROBL_OC | FESTPROBLOC | WERTV8 | CURR | 15 | 2 | Fixed Price Commitment in Object Currency | ||
127 | KSTOBLGES_OC | KSTOBLGESOC | WERTV8 | CURR | 15 | 2 | Total Cost Commitment in Object Currency | ||
128 | ISTKOSTEN_OC | ISTKOSTENOC | WERTV8 | CURR | 15 | 2 | Act. Costs in Object Currency | ||
129 | ISTERLOESE_OC | ISTERLOESEOC | WERTV8 | CURR | 15 | 2 | Actual Revenues in Object Currency | ||
130 | KZHLNG_OC | KZHLNGOC | WERTV8 | CURR | 15 | 2 | Total Vendor Payments (Down Payments and Payments) OC | ||
131 | DZHLNG_OC | DZHLNGOC | WERTV8 | CURR | 15 | 2 | Total Customer Payments (Down Payments and Payments) OC | ||
132 | .INCLUDE | 0 | 0 | Progress Calculation: All | |||||
133 | .INCLUDE | 0 | 0 | Progress Analysis: Values | |||||
134 | EV_PLAN_ORG1 | EVPLANORG1 | WERTV8 | CURR | 15 | 2 | Budgeted cost of work scheduled | ||
135 | EV_ACT_ORG1 | EVACTORG1 | WERTV8 | CURR | 15 | 2 | Budgeted cost of work performed | ||
136 | EV_ACT_CORR1 | EVACTCORR1 | WERTV8 | CURR | 15 | 2 | Budgeted cost of work performed, adjusted | ||
137 | .INCLUDE | 0 | 0 | Progress Analysis: Quantities | |||||
138 | EV_PLAN_QUAN_ORG1 | EVPLANQUANORG1 | CQUA8 | QUAN | 15 | 3 | Budgeted cost of work scheduled, quantity | ||
139 | EV_PLAN_QUAN_ORG1_UNIT | EV_PLAN_QUAN_ORG1_UNIT | MEINS | UNIT | 3 | 0 | BCWS, Unit of Measure | * | |
140 | EV_ACT_QUAN_ORG1 | EVACTQUANORG1 | CQUA8 | QUAN | 15 | 3 | Budgeted cost of work performed, quantity | ||
141 | EV_ACT_QUAN_ORG1_UNIT | EV_ACT_QUAN_ORG1_UNIT | MEINS | UNIT | 3 | 0 | BCWP, Unit of Measure | * | |
142 | EV_ACT_QUAN_CORR1 | EVACTQUANCORR1 | CQUA8 | QUAN | 15 | 3 | Budgeted cost of work performed, adjusted quantity | ||
143 | EV_ACT_QUAN_CORR1_UNIT | EV_ACT_QUAN_CORR1_UNIT | MEINS | UNIT | 3 | 0 | BCWP, Adjusted Quantity (Unit) | * | |
144 | .INCLUDE | 0 | 0 | Progress Analysis: Percentage of completion (POC) | |||||
145 | POC_PLAN_ORG_AGG1 | POCPLANORGAGG1 | EV_PROGRES | DEC | 6 | 3 | Aggregate planned percentage of completion | ||
146 | POC_PLAN_ORG_NAGG1 | POCPLANORGNAGG1 | EV_PROGRES | DEC | 6 | 3 | Non-aggregated planned percentage of completion | ||
147 | POC_ACT_ORG_AGG1 | POCACTORGAGG1 | EV_PROGRES | DEC | 6 | 3 | Aggregated actual POC | ||
148 | POC_ACT_ORG_NAGG1 | POCACTORGNAGG1 | EV_PROGRES | DEC | 6 | 3 | Non-aggregated actual percentage of completion | ||
149 | POC_ACT_CORR_AGG1 | POCACTCORRAGG1 | EV_PROGRES | DEC | 6 | 3 | Adjusted aggregated actual POC | ||
150 | POC_ACT_CORR_NAGG1 | POCACTCORRNAGG1 | EV_PROGRES | DEC | 6 | 3 | Adjusted non-aggregated actual percentage of completion | ||
151 | EV_COST_VAR_ORG | EWALVARORG | WERTV8 | CURR | 15 | 2 | Cost Variance Based on EV_ACT_ORG1 | ||
152 | EV_SCHED_VAR_ORG | EVSCHVARORG | WERTV8 | CURR | 15 | 2 | Schedule Variance Based on EV_ACT_ORG1 | ||
153 | EV_COST_INDX_ORG | EWALINDXORG | DEC5_2 | DEC | 7 | 2 | Cost Index Based on EV_ACT_ORG1 | ||
154 | EV_SCHED_INDX_ORG | EVSCHINDXORG | DEC5_2 | DEC | 7 | 2 | Date Index Based on POC_ACT_ORG_AGG1 | ||
155 | EV_COST_VAR_CORR | EWALVARCORR | WERTV8 | CURR | 15 | 2 | Cost Variance Based on EV_ACT_CORR1 | ||
156 | EV_SCHED_VAR_CORR | EVSCHVARCORR | WERTV8 | CURR | 15 | 2 | Schedule Variance Based on EV_ACT_CORR1 | ||
157 | EV_COST_INDX_CORR | EWALINDXCORR | DEC5_2 | DEC | 7 | 2 | Cost Index Based on EV_ACT_CORR1 | ||
158 | EV_SCHED_INDX_CORR | EVSCHINDXCORR | DEC5_2 | DEC | 7 | 2 | Date Index Based on POC_ACT_CORR_AGG1 | ||
159 | .INCLU--AP | 0 | 0 | Append Structure: Progress Determination | |||||
160 | .INCLUDE | 0 | 0 | Progress Determination (Object Currency) | |||||
161 | .INCLUDE | 0 | 0 | Progress Analysis: Progress Values (PV; Object Currency) | |||||
162 | EV_PLAN_ORG1_OC | EVPLANORG1 | WERTV8 | CURR | 15 | 2 | Budgeted cost of work scheduled | ||
163 | EV_ACT_ORG1_OC | EVACTORG1 | WERTV8 | CURR | 15 | 2 | Budgeted cost of work performed | ||
164 | EV_ACT_CORR1_OC | EVACTCORR1 | WERTV8 | CURR | 15 | 2 | Budgeted cost of work performed, adjusted | ||
165 | EV_COST_VAR_ORG_OC | EWALVARORG | WERTV8 | CURR | 15 | 2 | Cost Variance Based on EV_ACT_ORG1 | ||
166 | EV_SCHED_VAR_ORG_OC | EVSCHVARORG | WERTV8 | CURR | 15 | 2 | Schedule Variance Based on EV_ACT_ORG1 | ||
167 | EV_SCHED_VAR_CORR_OC | EWALVARCORR | WERTV8 | CURR | 15 | 2 | Cost Variance Based on EV_ACT_CORR1 | ||
168 | EV_COST_VAR_CORR_OC | EVSCHVARCORR | WERTV8 | CURR | 15 | 2 | Schedule Variance Based on EV_ACT_CORR1 | ||
169 | STEUS | STEUS | STEUS | CHAR | 4 | 0 | Control key | * | |
170 | DABEA | CO_DAUBEA | DAUER_6_1 | QUAN | 7 | 1 | Processing time | ||
171 | BEAZE | BEAZE | EINHEIT | UNIT | 3 | 0 | Unit of measure for processing time | ||
172 | PLIFZ | PLIFZ | DEC3 | DEC | 3 | 0 | Planned delivery time in days | ||
173 | PRART | PS_PRART | PS_PRART | CHAR | 2 | 0 | Project type | * | |
174 | .INCLUDE | 0 | 0 | Structur extension for planned data | |||||
175 | OBJNR | J_OBJNR | J_OBJNR | CHAR | 22 | 0 | Object number | * | |
176 | GJAHR | GJAHR | GJAHR | NUMC | 4 | 0 | Fiscal Year | ||
177 | PERIO | CO_PERIO | PERBL | NUMC | 3 | 0 | Period | ||
178 | MEINH | MEINH | MEINS | UNIT | 3 | 0 | Unit of Measure for Display | * | |
179 | PERIV | PERIV | PERIV | CHAR | 2 | 0 | Fiscal Year Variant | * | |
180 | UNTRG | PS_UNTRG | CHAR1 | CHAR | 1 | 0 | Indicator: Element is subdivided | ||
181 | SEL | SELKZ | SELKZ | CHAR | 1 | 0 | Selection flag | ||
182 | OBJEKTID_ONLY | OBJEKT_ID | CHAR30 | CHAR | 30 | 0 | ID/Object key | ||
183 | OBJEKTID_WITH_A | OBJEKT_ID | CHAR30 | CHAR | 30 | 0 | ID/Object key | ||
184 | TESTFRZ | FSAVZ | ATIME | TIMS | 6 | 0 | Earliest scheduled start: Execution (time) | ||
185 | TEENFRZ | FSAVZ | ATIME | TIMS | 6 | 0 | Earliest scheduled start: Execution (time) | ||
186 | TESTSPZ | FSAVZ | ATIME | TIMS | 6 | 0 | Earliest scheduled start: Execution (time) | ||
187 | TEENSPZ | FSAVZ | ATIME | TIMS | 6 | 0 | Earliest scheduled start: Execution (time) | ||
188 | TPSTFRZ | FSAVZ | ATIME | TIMS | 6 | 0 | Earliest scheduled start: Execution (time) | ||
189 | TPENFRZ | FSAVZ | ATIME | TIMS | 6 | 0 | Earliest scheduled start: Execution (time) | ||
190 | TPSTSPZ | FSAVZ | ATIME | TIMS | 6 | 0 | Earliest scheduled start: Execution (time) | ||
191 | TPENSPZ | FSAVZ | ATIME | TIMS | 6 | 0 | Earliest scheduled start: Execution (time) | ||
192 | ISTSTZ | FSAVZ | ATIME | TIMS | 6 | 0 | Earliest scheduled start: Execution (time) | ||
193 | ISTENZ | FSAVZ | ATIME | TIMS | 6 | 0 | Earliest scheduled start: Execution (time) | ||
194 | FPEDATE | FSAVD | DATUM | DATS | 8 | 0 | Earliest scheduled start: Execution (date) | ||
195 | FPETIME | FSAVZ | ATIME | TIMS | 6 | 0 | Earliest scheduled start: Execution (time) | ||
196 | FPPDATE | FSAVD | DATUM | DATS | 8 | 0 | Earliest scheduled start: Execution (date) | ||
197 | FPPTIME | FSAVZ | ATIME | TIMS | 6 | 0 | Earliest scheduled start: Execution (time) | ||
198 | ECKSTZ | FSAVZ | ATIME | TIMS | 6 | 0 | Earliest scheduled start: Execution (time) | ||
199 | ECKENZ | FSAVZ | ATIME | TIMS | 6 | 0 | Earliest scheduled start: Execution (time) | ||
200 | PROGSTZ | FSAVZ | ATIME | TIMS | 6 | 0 | Earliest scheduled start: Execution (time) | ||
201 | PROGENZ | FSAVZ | ATIME | TIMS | 6 | 0 | Earliest scheduled start: Execution (time) | ||
202 | EPANF | FSAVD | DATUM | DATS | 8 | 0 | Earliest scheduled start: Execution (date) | ||
203 | EPANZ | FSAVZ | ATIME | TIMS | 6 | 0 | Earliest scheduled start: Execution (time) | ||
204 | EPEND | FSAVD | DATUM | DATS | 8 | 0 | Earliest scheduled start: Execution (date) | ||
205 | EPENZ | FSAVZ | ATIME | TIMS | 6 | 0 | Earliest scheduled start: Execution (time) | ||
206 | EINSA | EINSCHRA | RESTRIKSTR | CHAR | 1 | 0 | Constraint on the basic start date for the activity | ||
207 | EINSE | EINSCHRA | RESTRIKSTR | CHAR | 1 | 0 | Constraint on the basic start date for the activity | ||
208 | EWSTD | FSAVD | DATUM | DATS | 8 | 0 | Earliest scheduled start: Execution (date) | ||
209 | EWSTDZ | FSAVZ | ATIME | TIMS | 6 | 0 | Earliest scheduled start: Execution (time) | ||
210 | EWEND | FSAVD | DATUM | DATS | 8 | 0 | Earliest scheduled start: Execution (date) | ||
211 | EWENDZ | FSAVZ | ATIME | TIMS | 6 | 0 | Earliest scheduled start: Execution (time) | ||
212 | EWSTA | EINSCHRA | RESTRIKSTR | CHAR | 1 | 0 | Constraint on the basic start date for the activity | ||
213 | EWSTE | EINSCHRA | RESTRIKSTR | CHAR | 1 | 0 | Constraint on the basic start date for the activity | ||
214 | ISBD | FSAVD | DATUM | DATS | 8 | 0 | Earliest scheduled start: Execution (date) | ||
215 | ISBZ | FSAVZ | ATIME | TIMS | 6 | 0 | Earliest scheduled start: Execution (time) | ||
216 | IEBD | FSAVD | DATUM | DATS | 8 | 0 | Earliest scheduled start: Execution (date) | ||
217 | IEBZ | FSAVZ | ATIME | TIMS | 6 | 0 | Earliest scheduled start: Execution (time) | ||
218 | PEDD | FSAVD | DATUM | DATS | 8 | 0 | Earliest scheduled start: Execution (date) | ||
219 | PEDZ | FSAVZ | ATIME | TIMS | 6 | 0 | Earliest scheduled start: Execution (time) | ||
220 | EINRUECK | PS_STUFE | INT1 | INT1 | 3 | 0 | Level in project hierarchy | ||
221 | TABIX | PS_WBSIND | SYST_LONG | INT4 | 10 | 0 | Document table index for WBS elements | ||
222 | EXT_AUFNR | AUFNR | AUFNR | CHAR | 12 | 0 | Order Number | * | |
223 | VORNR | VORNR | VORNR | CHAR | 4 | 0 | Operation/Activity Number | ||
224 | UVORN | VORNR | VORNR | CHAR | 4 | 0 | Operation/Activity Number | ||
225 | NETZ_TABIX | PS_WBSIND | SYST_LONG | INT4 | 10 | 0 | Document table index for WBS elements | ||
226 | AUFNRDTN | AUFNR | AUFNR | CHAR | 12 | 0 | Order Number | * | |
227 | VORNRTN | VORNR | VORNR | CHAR | 4 | 0 | Operation/Activity Number | ||
228 | NETZ_STUFE | PS_STUFE | INT1 | INT1 | 3 | 0 | Level in project hierarchy | ||
229 | CHART_ID | BCCHARTID | BCINT4 | INT4 | 10 | 0 | Identification of chart in bar chart | ||
230 | STD_SORT | PS_WBSIND | SYST_LONG | INT4 | 10 | 0 | Document table index for WBS elements | ||
231 | AUFNRD | AUFNR | AUFNR | CHAR | 12 | 0 | Order Number | * | |
232 | AUFPT | CO_AUFPL | AUFPL | NUMC | 10 | 0 | Routing number of operations in the order | ||
233 | APLZT | CO_APLZL | CO_APLZL | NUMC | 8 | 0 | General counter for order | * | |
234 | AUFPL | CO_AUFPL | AUFPL | NUMC | 10 | 0 | Routing number of operations in the order | ||
235 | APLZL | CO_APLZL | CO_APLZL | NUMC | 8 | 0 | General counter for order | * | |
236 | ROWNUMBER | BCROWNUMB | BCINT4 | INT4 | 10 | 0 | Line number in bar chart | ||
237 | PSIND | PS_WBSIND | SYST_LONG | INT4 | 10 | 0 | Document table index for WBS elements | ||
238 | NWIND | PS_NWIND | SYST_LONG | INT4 | 10 | 0 | Document table index for networks | ||
239 | FLIND | INDEX_PLFL | TABIX | INT4 | 10 | 0 | Index referring to record table for sequences | ||
240 | ACIND | PS_ACTIND | SYST_LONG | INT4 | 10 | 0 | Doc. table index for activities | ||
241 | VEIND | PS_ACTIND | SYST_LONG | INT4 | 10 | 0 | Doc. table index for activities | ||
242 | MSIND | PS_MSTIND | SYST_LONG | INT4 | 10 | 0 | Document table index for milestones | ||
243 | CRIND | PS_MATIND | TABIX | INT4 | 10 | 0 | Document table index for material components | ||
244 | OBJECT | SELKZ | SELKZ | CHAR | 1 | 0 | Selection flag | ||
245 | PSPNR | PS_POSNR | PS_POSNR | NUMC | 8 | 0 | WBS Element | * | |
246 | LOEKZ | SELKZ | SELKZ | CHAR | 1 | 0 | Selection flag | ||
247 | LOEVM | SELKZ | SELKZ | CHAR | 1 | 0 | Selection flag | ||
248 | KAPID | CY_IND_OBJ | SYST_LONG | INT4 | 10 | 0 | Index to object | ||
249 | HAS_TEXT | SELKZ | SELKZ | CHAR | 1 | 0 | Selection flag | ||
250 | FLG_VAB | SELKZ | SELKZ | CHAR | 1 | 0 | Selection flag | ||
251 | DISPLAY | SELKZ | SELKZ | CHAR | 1 | 0 | Selection flag | ||
252 | DB_READ | SELKZ | SELKZ | CHAR | 1 | 0 | Selection flag | ||
253 | BOX_ID | BCBOXID | BCINT4 | INT4 | 10 | 0 | Identification for box in bar chart | ||
254 | NODE_ID | BCNODEID | BCINT4 | INT4 | 10 | 0 | Identification for nodes in bar chart | ||
255 | GRID_ID | BCBOXID | BCINT4 | INT4 | 10 | 0 | Identification for box in bar chart | ||
256 | CAL_ID | BCBOXID | BCINT4 | INT4 | 10 | 0 | Identification for box in bar chart | ||
257 | FLG_DISPLAY | SELKZ | SELKZ | CHAR | 1 | 0 | Selection flag | ||
258 | FLG_COLAPSED | SELKZ | SELKZ | CHAR | 1 | 0 | Selection flag | ||
259 | MARK_COPY | SELKZ | SELKZ | CHAR | 1 | 0 | Selection flag | ||
260 | MARK | SELKZ | SELKZ | CHAR | 1 | 0 | Selection flag | ||
261 | AUTYP | AUFTYP | AUFTYP | NUMC | 2 | 0 | Order category | ||
262 | AUART | AUFART | AUFART | CHAR | 4 | 0 | Order Type | * | |
263 | OWAER | OWAERS | WAERS | CUKY | 5 | 0 | Object currency for network activity | * | |
264 | AUSBLENDEN | SELKZ | SELKZ | CHAR | 1 | 0 | Selection flag |
Foreign Keys
Source Table | Source Column | Foreign Table | Foreign Column | Dependency Factor | Cardinality left | Cardinality right | |
---|---|---|---|---|---|---|---|
1 | RCJ_PS_ORD | EARBEH | T006 | MSEHI | REF | C | CN |
2 | RCJ_PS_ORD | EDAUEH | T006 | MSEHI | REF | C | CN |
3 | RCJ_PS_ORD | IARBEH | T006 | MSEHI | REF | C | CN |
4 | RCJ_PS_ORD | IDAUEH | T006 | MSEHI | REF | C | CN |
5 | RCJ_PS_ORD | PARBEH | T006 | MSEHI | REF | C | CN |
6 | RCJ_PS_ORD | PDAUEH | T006 | MSEHI | REF | C | CN |
7 | RCJ_PS_ORD | PSPRI | TCN07 | NPRIO | REF | C | CN |
8 | RCJ_PS_ORD | RARBEH | T006 | MSEHI | REF | C | CN |
9 | RCJ_PS_ORD | RDAUEH | T006 | MSEHI | REF | C | CN |
10 | RCJ_PS_ORD | USE04 | T006 | MSEHI | |||
11 | RCJ_PS_ORD | USE05 | T006 | MSEHI | |||
12 | RCJ_PS_ORD | USE06 | TCURC | WAERS | |||
13 | RCJ_PS_ORD | USE07 | TCURC | WAERS | |||
14 | RCJ_PS_ORD | VARBEH | T006 | MSEHI | REF | C | CN |
15 | RCJ_PS_ORD | VDAUEH | T006 | MSEHI | REF | C | CN |
16 | RCJ_PS_ORD | VEINH | T006 | MSEHI | REF | C | CN |
17 | RCJ_PS_ORD | WAERS | TCURC | WAERS | REF | C | CN |
History
Last changed by/on | SAP | 20130529 |
SAP Release Created in |