SAP ABAP Table SRCNST100 (Structure for Project Structure Overview Reporting)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷ PS-IS (Application Component) Information System
⤷ CNIS (Package) Application development R/3 PS information system
⤷ PS-IS (Application Component) Information System
⤷ CNIS (Package) Application development R/3 PS information system
Basic Data
Table Category | INTTAB | Structure |
Structure | SRCNST100 | Table Relationship Diagram |
Short Description | Structure for Project Structure Overview Reporting |
Delivery and Maintenance
Pool/cluster | ||
Delivery Class | ||
Data Browser/Table View Maintenance | Display/Maintenance Allowed with Restrictions |
Components
Field | Key | Data Element | Domain | Data Type |
Length | Decimal Places |
Short Description | Check table |
|
---|---|---|---|---|---|---|---|---|---|
1 | .INCLUDE | 0 | 0 | Object Structure for Project Reporting | |||||
2 | .INCLUDE | 0 | 0 | Object Structure for Project Reporting | |||||
3 | ARNUMMER | ADMI_RUN_D | ADMI_RUN | CHAR | 6 | 0 | Archiving Session Number | ||
4 | VSGRUPPE | VSGRUPPE | TEXT20 | CHAR | 20 | 0 | Group for a project version | ||
5 | VSNUMMER | VSNMR | VSNMR | CHAR | 12 | 0 | Number or description of a version | ||
6 | OBJEKTID | PS_IS_ID | CHAR40 | CHAR | 40 | 0 | ID/Object key | ||
7 | KURZTEXT | KURZTEXT | TEXT40 | CHAR | 40 | 0 | Short text/description of the object | ||
8 | OBJEKTTYP | OTEXT | TEXT25 | CHAR | 25 | 0 | Object Type Text | ||
9 | .INCLUDE | 0 | 0 | Object Structure for Project Reporting | |||||
10 | ECKST | PS_ECKST | DATUM | DATS | 8 | 0 | Basic start date | ||
11 | ECKEN | PS_ECKEN | DATUM | DATS | 8 | 0 | Finish date (from basic dates) | ||
12 | PROGST | PS_PROGST | DATUM | DATS | 8 | 0 | Forecast start date | ||
13 | PROGEN | PS_PROGEN | DATUM | DATS | 8 | 0 | Forecast finish date | ||
14 | TESTFR | PS_TESTFR | DATUM | DATS | 8 | 0 | Earliest scheduled start (from basic dates) | ||
15 | TEENFR | PS_TEENFR | DATUM | DATS | 8 | 0 | Earliest scheduled finish (from basic dates) | ||
16 | TESTSP | PS_TESTSP | DATUM | DATS | 8 | 0 | Latest scheduled start (from basic dates) | ||
17 | TEENSP | PS_TEENSP | DATUM | DATS | 8 | 0 | Latest scheduled finish (from basic dates) | ||
18 | TPSTFR | PS_TPSTFR | DATUM | DATS | 8 | 0 | Earliest scheduled start (from forecast dates) | ||
19 | TPENFR | PS_TPENFR | DATUM | DATS | 8 | 0 | Earliest scheduled finish (from forecast dates) | ||
20 | TPSTSP | PS_TPSTSP | DATUM | DATS | 8 | 0 | Latest scheduled start (from forecast dates) | ||
21 | TPENSP | PS_TPENSP | DATUM | DATS | 8 | 0 | Latest scheduled finish (from forecast dates) | ||
22 | VORLST | PS_VORLST | DATUM | DATS | 8 | 0 | Tentative start date | ||
23 | VORLEN | PS_VORLEN | DATUM | DATS | 8 | 0 | Tentative finish date | ||
24 | ISTST | PS_ISTST | DATUM | DATS | 8 | 0 | Actual start date | ||
25 | ISTEN | PS_ISTEN | DATUM | DATS | 8 | 0 | Actual finish date | ||
26 | DATFS | PS_DATFS | DATUM | DATS | 8 | 0 | Earliest start date | ||
27 | DATSE | PS_DATSE | DATUM | DATS | 8 | 0 | Latest finish date | ||
28 | .INCLUDE | 0 | 0 | Object Structure for Project Reporting | |||||
29 | EDAUER | PS_EDAUER_2 | DAUER_9_1 | QUAN | 10 | 1 | Duration | ||
30 | EDAUEH | PS_DAUEH | MEINS | UNIT | 3 | 0 | Actual duration unit | * | |
31 | PDAUER | PS_PDAUER_VZ | PS_DAUER_VZ | QUAN | 10 | 1 | Forecast duration | ||
32 | PDAUEH | PS_DAUEH | MEINS | UNIT | 3 | 0 | Actual duration unit | * | |
33 | VDAUER | PS_VDAUER_VZ | PS_DAUER_VZ | QUAN | 10 | 1 | Tentative duration | ||
34 | VDAUEH | PS_DAUEH | MEINS | UNIT | 3 | 0 | Actual duration unit | * | |
35 | IDAUER | PS_IDAUER_VZ | PS_DAUER_VZ | QUAN | 10 | 1 | Actual duration | ||
36 | IDAUEH | PS_DAUEH | MEINS | UNIT | 3 | 0 | Actual duration unit | * | |
37 | RDAUER | PS_RDAUER_VZ | PS_DAUER_VZ | QUAN | 10 | 1 | Remaining duration | ||
38 | RDAUEH | PS_DAUEH | MEINS | UNIT | 3 | 0 | Actual duration unit | * | |
39 | ABARBD | PS_ABARBD | CO_ABARB | NUMC | 3 | 0 | Processing % of duration | ||
40 | .INCLUDE | 0 | 0 | Object Structure for Project Reporting | |||||
41 | EARBEI | PS_EARBEI_2 | PS_ARBEIT_2 | QUAN | 13 | 3 | Work | ||
42 | EARBEH | PS_ARBEH | MEINS | UNIT | 3 | 0 | Unit for work | * | |
43 | PARBEI | PS_PARBEI_VZ | PS_ARBEIT_VZ | QUAN | 13 | 3 | Forecast work | ||
44 | PARBEH | PS_ARBEH | MEINS | UNIT | 3 | 0 | Unit for work | * | |
45 | VARBEI | PS_VARBEI_VZ | PS_ARBEIT_VZ | QUAN | 13 | 3 | Tentative work | ||
46 | VARBEH | PS_ARBEH | MEINS | UNIT | 3 | 0 | Unit for work | * | |
47 | IARBEI | PS_IARBEI_VZ | PS_ARBEIT_VZ | QUAN | 13 | 3 | Actual work | ||
48 | IARBEH | PS_ARBEH | MEINS | UNIT | 3 | 0 | Unit for work | * | |
49 | RARBEI | PS_RARBEI_VZ | PS_ARBEIT_VZ | QUAN | 13 | 3 | Remaining work | ||
50 | RARBEH | PS_ARBEH | MEINS | UNIT | 3 | 0 | Unit for work | * | |
51 | .INCLUDE | 0 | 0 | Object Structure for Project Reporting | |||||
52 | ABARBA | PS_ABARBA | CO_ABARB | NUMC | 3 | 0 | Percent of completion for work | ||
53 | SLWID | SLWID | SLWID | CHAR | 7 | 0 | Key word ID for user-defined fields | * | |
54 | USR00 | USRCHAR20 | USRCHAR20 | CHAR | 20 | 0 | User field with 20 characters | ||
55 | USR01 | USRCHAR20 | USRCHAR20 | CHAR | 20 | 0 | User field with 20 characters | ||
56 | USR02 | USRCHAR10 | USRCHAR10 | CHAR | 10 | 0 | User field with 10 characters | ||
57 | USR03 | USRCHAR10 | USRCHAR10 | CHAR | 10 | 0 | User field with 10 characters | ||
58 | .INCLUDE | 0 | 0 | Object Structure for Project Reporting | |||||
59 | USR04 | USRQUAN13 | USRQUAN13 | QUAN | 13 | 3 | User field for quantity (length 10.3) | ||
60 | USE04 | USRUNIT | MEINS | UNIT | 3 | 0 | User field: Unit for quantity fields | * | |
61 | USR05 | USRQUAN13 | USRQUAN13 | QUAN | 13 | 3 | User field for quantity (length 10.3) | ||
62 | USE05 | USRUNIT | MEINS | UNIT | 3 | 0 | User field: Unit for quantity fields | * | |
63 | USR06 | USRCURR13 | USRCURR13 | CURR | 13 | 3 | User-defined field for values (length 10,3) | ||
64 | USE06 | USRCUKY | WAERS | CUKY | 5 | 0 | User field: Unit for value fields | * | |
65 | USR07 | USRCURR13 | USRCURR13 | CURR | 13 | 3 | User-defined field for values (length 10,3) | ||
66 | USE07 | USRCUKY | WAERS | CUKY | 5 | 0 | User field: Unit for value fields | * | |
67 | USR08 | USRDATE | USRDATE | DATS | 8 | 0 | User field for date | ||
68 | USR09 | USRDATE | USRDATE | DATS | 8 | 0 | User field for date | ||
69 | .INCLUDE | 0 | 0 | Object Structure for Project Reporting | |||||
70 | USR10 | USRFLAG | FLAG | CHAR | 1 | 0 | User-defined field: Indicator for reports | ||
71 | USR11 | USRFLAG | FLAG | CHAR | 1 | 0 | User-defined field: Indicator for reports | ||
72 | VERNR | PS_VERNR_C | CHAR8 | CHAR | 8 | 0 | Number of responsible person (project mgr)/MRP controller | ||
73 | VERNA | PS_VERNA | PS_VERNA | CHAR | 25 | 0 | Name of responsible person (Project manager) | ||
74 | AENNR | AENNR | AENNR | CHAR | 12 | 0 | Change Number | * | |
75 | WERKS | WERKS_D | WERKS | CHAR | 4 | 0 | Plant | * | |
76 | ARBPL | ARBPL | ARBPL | CHAR | 8 | 0 | Work center | ||
77 | KALID | WFCID | WFCID | CHAR | 2 | 0 | Factory Calendar | * | |
78 | TXTSP | LTXSP | SPRAS | LANG | 1 | 0 | Language: The long text was stored in this language | * | |
79 | PSPRI | NW_PRIO | NW_PRIO | CHAR | 1 | 0 | Priority | * | |
80 | STATXT | STATUSTEXT_2 | CHAR80 | CHAR | 80 | 0 | Edited status text | ||
81 | FRUEHER | FRUEHER_2 | DAUER_9_1 | QUAN | 10 | 1 | Actual start is before earliest scheduled start | ||
82 | SPAETER | SPAETER_2 | DAUER_9_1 | QUAN | 10 | 1 | Actual Finish/Planned Finish After Latest Scheduled Finish | ||
83 | VERZUG | VERZUG_2 | DAUER_9_1 | QUAN | 10 | 1 | Duration After Latest Scheduled Finish | ||
84 | VORBEI | VORBEI_2 | DAUER_9_1 | QUAN | 10 | 1 | Duration After Earliest Scheduled Start | ||
85 | VEINH | VERZ_EINHT | MEINS | UNIT | 3 | 0 | Unit for Duration of the Delay | * | |
86 | PUFGS | PUFFR_GESM | PUFFER | DEC | 3 | 0 | Total float | ||
87 | PUFFR | PUFFR_FREI | PUFFER | DEC | 3 | 0 | Free float | ||
88 | PUFGP | PPUFF_GESM | PUFFER | DEC | 3 | 0 | Total float (from forecast) | ||
89 | PUFFP | PPUFF_FREI | PUFFER | DEC | 3 | 0 | Free float (from forecast) | ||
90 | KOKRS | KOKRS | CACCD | CHAR | 4 | 0 | Controlling Area | * | |
91 | BUKRS | BUKRS | BUKRS | CHAR | 4 | 0 | Company Code | * | |
92 | GSBER | GSBER | GSBER | CHAR | 4 | 0 | Business Area | * | |
93 | WAERS | WAERS | WAERS | CUKY | 5 | 0 | Currency Key | * | |
94 | OWAERS | OWAERS | WAERS | CUKY | 5 | 0 | Object currency for network activity | * | |
95 | MEINH | MEINH | MEINS | UNIT | 3 | 0 | Unit of Measure for Display | * | |
96 | .INCLUDE | 0 | 0 | Key Figures for Commercial Reporting in Structure Overview | |||||
97 | .INCLUDE | 0 | 0 | RPSCO_LIS for graphics | |||||
98 | PROKSTPLAN | PROKSTPLAN | WERTV8 | CURR | 15 | 2 | Current project cost plan | ||
99 | PROKSTPLN2 | PROKSTPLN2 | WERTV8 | CURR | 15 | 2 | Project cost plan (version 2) | ||
100 | AUFKSTPLAN | AUFKSTPLAN | WERTV8 | CURR | 15 | 2 | Current order cost plan | ||
101 | AUFKSTPLN2 | AUFKSTPLN2 | WERTV8 | CURR | 15 | 2 | Order cost plan (version 2) | ||
102 | PROERLPLAN | PROERLPLAN | WERTV8 | CURR | 15 | 2 | Current project revenue plan | ||
103 | PROERLPLN2 | PROERLPLN2 | WERTV8 | CURR | 15 | 2 | Project revenue plan (version 2) | ||
104 | AUFERLPLAN | AUFERLPLAN | WERTV8 | CURR | 15 | 2 | Current order revenue plan | ||
105 | AUFERLPLN2 | AUFERLPLN2 | WERTV8 | CURR | 15 | 2 | Order revenue plan (version 2) | ||
106 | KREDFINPLN | KREDFINPLN | WERTV8 | CURR | 15 | 2 | Current financial budget, credit side | ||
107 | DEBFINPLN | DEBFINPLN | WERTV8 | CURR | 15 | 2 | Current cash budget, debit side | ||
108 | BUDGET | BUDGET | WERTV8 | CURR | 15 | 2 | Budget of a Measure (App. Request Variant Was Replaced) | ||
109 | FREIGABE | FREIGABE | WERTV8 | CURR | 15 | 2 | Release | ||
110 | AUFTRANF | AUFTRANF | WERTV8 | CURR | 15 | 2 | Residual order plan | ||
111 | FESTPROBL | FESTPROBL | WERTV8 | CURR | 15 | 2 | Fixed price commitment | ||
112 | KSTOBLGES | KSTOBLGES | WERTV8 | CURR | 15 | 2 | Total cost commitment | ||
113 | ISTKOSTEN | ISTKOSTEN | WERTV8 | CURR | 15 | 2 | Actual costs | ||
114 | ISTERLOESE | ISTERLOESE | WERTV8 | CURR | 15 | 2 | Actual revenues | ||
115 | KZHLNG | KZHLNG | WERTV8 | CURR | 15 | 2 | Total credit side payments (down payments and payments) | ||
116 | DZHLNG | DZHLNG | WERTV8 | CURR | 15 | 2 | Total debit side payments (down payments and payments) | ||
117 | .INCLU--AP | 0 | 0 | Append Structure RCJ_RPSCO_LIS | |||||
118 | .INCLUDE | 0 | 0 | RPSCO_LIS for Graphic (Object Currency) | |||||
119 | PROKSTPLAN_OC | PROKSTPLANOC | WERTV8 | CURR | 15 | 2 | Current Project Cost Plan in Object Currency | ||
120 | PROKSTPLN2_OC | PROKSTPLN2OC | WERTV8 | CURR | 15 | 2 | Project Cost Plan (Version 2) in Object Currency | ||
121 | AUFKSTPLAN_OC | AUFKSTPLANOC | WERTV8 | CURR | 15 | 2 | Current Order Cost Plan in Object Currency | ||
122 | AUFKSTPLN2_OC | AUFKSTPLN2OC | WERTV8 | CURR | 15 | 2 | Order Cost Plan (Version 2) in Object Currency | ||
123 | PROERLPLAN_OC | PROERLPLANOC | WERTV8 | CURR | 15 | 2 | Current Project Revenue Plan in Object Currency | ||
124 | PROERLPLN2_OC | PROERLPLN2OC | WERTV8 | CURR | 15 | 2 | Project Revenue Plan (Version 2) in Object Currency | ||
125 | AUFERLPLAN_OC | AUFERLPLANOC | WERTV8 | CURR | 15 | 2 | Current Order Revenue Plan in Object Currency | ||
126 | AUFERLPLN2_OC | AUFERLPLN2OC | WERTV8 | CURR | 15 | 2 | Order Revenue Plan (Version 2) in Object Currency | ||
127 | KREDFINPLN_OC | KREDFINPLNOC | WERTV8 | CURR | 15 | 2 | Current Credit Side Cash Budget in Object Currency | ||
128 | DEBFINPLN_OC | DEBFINPLNOC | WERTV8 | CURR | 15 | 2 | Current Debit Side Cash Budget in Object Currency | ||
129 | BUDGET_OC | BUDGETOC | WERTV8 | CURR | 15 | 2 | Appropriation Budget (Appr.Request Variant Replaced) in OC | ||
130 | FREIGABE_OC | FREIGABEOC | WERTV8 | CURR | 15 | 2 | Release in Object Currency | ||
131 | AUFTRANF_OC | AUFTRANFOC | WERTV8 | CURR | 15 | 2 | Residual Order Plan in Object Currency | ||
132 | FESTPROBL_OC | FESTPROBLOC | WERTV8 | CURR | 15 | 2 | Fixed Price Commitment in Object Currency | ||
133 | KSTOBLGES_OC | KSTOBLGESOC | WERTV8 | CURR | 15 | 2 | Total Cost Commitment in Object Currency | ||
134 | ISTKOSTEN_OC | ISTKOSTENOC | WERTV8 | CURR | 15 | 2 | Act. Costs in Object Currency | ||
135 | ISTERLOESE_OC | ISTERLOESEOC | WERTV8 | CURR | 15 | 2 | Actual Revenues in Object Currency | ||
136 | KZHLNG_OC | KZHLNGOC | WERTV8 | CURR | 15 | 2 | Total Vendor Payments (Down Payments and Payments) OC | ||
137 | DZHLNG_OC | DZHLNGOC | WERTV8 | CURR | 15 | 2 | Total Customer Payments (Down Payments and Payments) OC | ||
138 | .INCLUDE | 0 | 0 | Progress Calculation: All | |||||
139 | .INCLUDE | 0 | 0 | Progress Analysis: Values | |||||
140 | EV_PLAN_ORG1 | EVPLANORG1 | WERTV8 | CURR | 15 | 2 | Budgeted cost of work scheduled | ||
141 | EV_ACT_ORG1 | EVACTORG1 | WERTV8 | CURR | 15 | 2 | Budgeted cost of work performed | ||
142 | EV_ACT_CORR1 | EVACTCORR1 | WERTV8 | CURR | 15 | 2 | Budgeted cost of work performed, adjusted | ||
143 | .INCLUDE | 0 | 0 | Progress Analysis: Quantities | |||||
144 | EV_PLAN_QUAN_ORG1 | EVPLANQUANORG1 | CQUA8 | QUAN | 15 | 3 | Budgeted cost of work scheduled, quantity | ||
145 | EV_PLAN_QUAN_ORG1_UNIT | EV_PLAN_QUAN_ORG1_UNIT | MEINS | UNIT | 3 | 0 | BCWS, Unit of Measure | * | |
146 | EV_ACT_QUAN_ORG1 | EVACTQUANORG1 | CQUA8 | QUAN | 15 | 3 | Budgeted cost of work performed, quantity | ||
147 | EV_ACT_QUAN_ORG1_UNIT | EV_ACT_QUAN_ORG1_UNIT | MEINS | UNIT | 3 | 0 | BCWP, Unit of Measure | * | |
148 | EV_ACT_QUAN_CORR1 | EVACTQUANCORR1 | CQUA8 | QUAN | 15 | 3 | Budgeted cost of work performed, adjusted quantity | ||
149 | EV_ACT_QUAN_CORR1_UNIT | EV_ACT_QUAN_CORR1_UNIT | MEINS | UNIT | 3 | 0 | BCWP, Adjusted Quantity (Unit) | * | |
150 | .INCLUDE | 0 | 0 | Progress Analysis: Percentage of completion (POC) | |||||
151 | POC_PLAN_ORG_AGG1 | POCPLANORGAGG1 | EV_PROGRES | DEC | 6 | 3 | Aggregate planned percentage of completion | ||
152 | POC_PLAN_ORG_NAGG1 | POCPLANORGNAGG1 | EV_PROGRES | DEC | 6 | 3 | Non-aggregated planned percentage of completion | ||
153 | POC_ACT_ORG_AGG1 | POCACTORGAGG1 | EV_PROGRES | DEC | 6 | 3 | Aggregated actual POC | ||
154 | POC_ACT_ORG_NAGG1 | POCACTORGNAGG1 | EV_PROGRES | DEC | 6 | 3 | Non-aggregated actual percentage of completion | ||
155 | POC_ACT_CORR_AGG1 | POCACTCORRAGG1 | EV_PROGRES | DEC | 6 | 3 | Adjusted aggregated actual POC | ||
156 | POC_ACT_CORR_NAGG1 | POCACTCORRNAGG1 | EV_PROGRES | DEC | 6 | 3 | Adjusted non-aggregated actual percentage of completion | ||
157 | EV_COST_VAR_ORG | EWALVARORG | WERTV8 | CURR | 15 | 2 | Cost Variance Based on EV_ACT_ORG1 | ||
158 | EV_SCHED_VAR_ORG | EVSCHVARORG | WERTV8 | CURR | 15 | 2 | Schedule Variance Based on EV_ACT_ORG1 | ||
159 | EV_COST_INDX_ORG | EWALINDXORG | DEC5_2 | DEC | 7 | 2 | Cost Index Based on EV_ACT_ORG1 | ||
160 | EV_SCHED_INDX_ORG | EVSCHINDXORG | DEC5_2 | DEC | 7 | 2 | Date Index Based on POC_ACT_ORG_AGG1 | ||
161 | EV_COST_VAR_CORR | EWALVARCORR | WERTV8 | CURR | 15 | 2 | Cost Variance Based on EV_ACT_CORR1 | ||
162 | EV_SCHED_VAR_CORR | EVSCHVARCORR | WERTV8 | CURR | 15 | 2 | Schedule Variance Based on EV_ACT_CORR1 | ||
163 | EV_COST_INDX_CORR | EWALINDXCORR | DEC5_2 | DEC | 7 | 2 | Cost Index Based on EV_ACT_CORR1 | ||
164 | EV_SCHED_INDX_CORR | EVSCHINDXCORR | DEC5_2 | DEC | 7 | 2 | Date Index Based on POC_ACT_CORR_AGG1 | ||
165 | .INCLU--AP | 0 | 0 | Append Structure: Progress Determination | |||||
166 | .INCLUDE | 0 | 0 | Progress Determination (Object Currency) | |||||
167 | .INCLUDE | 0 | 0 | Progress Analysis: Progress Values (PV; Object Currency) | |||||
168 | EV_PLAN_ORG1_OC | EVPLANORG1 | WERTV8 | CURR | 15 | 2 | Budgeted cost of work scheduled | ||
169 | EV_ACT_ORG1_OC | EVACTORG1 | WERTV8 | CURR | 15 | 2 | Budgeted cost of work performed | ||
170 | EV_ACT_CORR1_OC | EVACTCORR1 | WERTV8 | CURR | 15 | 2 | Budgeted cost of work performed, adjusted | ||
171 | EV_COST_VAR_ORG_OC | EWALVARORG | WERTV8 | CURR | 15 | 2 | Cost Variance Based on EV_ACT_ORG1 | ||
172 | EV_SCHED_VAR_ORG_OC | EVSCHVARORG | WERTV8 | CURR | 15 | 2 | Schedule Variance Based on EV_ACT_ORG1 | ||
173 | EV_SCHED_VAR_CORR_OC | EWALVARCORR | WERTV8 | CURR | 15 | 2 | Cost Variance Based on EV_ACT_CORR1 | ||
174 | EV_COST_VAR_CORR_OC | EVSCHVARCORR | WERTV8 | CURR | 15 | 2 | Schedule Variance Based on EV_ACT_CORR1 | ||
175 | .INCLUDE | 0 | 0 | Object Structure for Project Reporting | |||||
176 | EVMET_P1 | EV_METHOD_PLN | CHAR10 | CHAR | 10 | 0 | Measurement method for PS progress analysis (plan) | ||
177 | EVMET_A1 | EV_METHOD_ACT | CHAR10 | CHAR | 10 | 0 | Measurement method in PS progress analysis (actual) | ||
178 | EVGEW | EV_WEIGHTD | DEC8 | DEC | 8 | 0 | Aggregation weight for POC (PS progress) | ||
179 | .INCLUDE | 0 | 0 | ||||||
180 | OBJNR | J_OBJNR | J_OBJNR | CHAR | 22 | 0 | Object number | * | |
181 | HIERSTUFE | HIERSTUFE | INT4 | INT4 | 10 | 0 | Classification: Level in Hierarchy | ||
182 | TABNAME | TABNAME | AS4TAB | CHAR | 30 | 0 | Table Name | * | |
183 | TABINDEX | PS_ENTRY | SYST_LONG | INT4 | 10 | 0 | Entry (line number on a list) |
History
Last changed by/on | SAP | 20130529 |
SAP Release Created in | 600 |