SAP ABAP Table PSHLP_OVERALL_DATES_OVR_ST (Overall Dates Over Struc. Chng PSHLP_OVERALL_DATES_OVR_SS_ 2)
Hierarchy
EA-APPL (Software Component) SAP Enterprise Extension PLM, SCM, Financials
   PS-ST (Application Component) Structures
     PS_HLP_MD (Package) Handling Large Projects:-Master Data
Basic Data
Table Category INTTAB    Structure 
Structure PSHLP_OVERALL_DATES_OVR_ST   Table Relationship Diagram
Short Description Overall Dates Over Struc. Chng PSHLP_OVERALL_DATES_OVR_SS_ 2    
Delivery and Maintenance
Pool/cluster      
Delivery Class      
Data Browser/Table View Maintenance     Display/Maintenance Allowed with Restrictions 
Components
     
Field Key Data Element Domain Data
Type
Length Decimal
Places
Short Description Check
table
1 OBJTYPE J_OBART J_OBART CHAR 2   0   Object Type *
2 OBJNR J_OBJNR J_OBJNR CHAR 22   0   Object number *
3 EXCEPTION PSHLP_DATE_EXCEPTION_DE ICON CHAR 4   0   Dates Exception *
4 ICON PSHLP_OBJECT_ICON_DE TV_IMAGE CHAR 46   0   Icon for Each Object Type  
5 DESCRIPTION PS_POST1 TEXT40 CHAR 40   0   PS: Short description (first text line)  
6 BASIC_START PSHLP_BASIC_START_DE DATUM DATS 8   0   Basic Start Date  
7 ORIG_BASIC_START PSHLP_ORIG_BASIC_START_DE DATUM DATS 8   0   Original Basic Start Date  
8 LAST_BASIC_START PSHLP_LAST_BASIC_START_DE DATUM DATS 8   0   Last Basic Start Date  
9 BASIC_FINISH PSHLP_BASIC_FINISH_DE DATUM DATS 8   0   Basic Finish Date  
10 ORIG_BASIC_FINISH PSHLP_ORIG_BASIC_FINISH_DE DATUM DATS 8   0   Original Basic Finish Date  
11 LAST_BASIC_FINISH PSHLP_LAST_BASIC_FINISH_DE DATUM DATS 8   0   Last Basic Finish Date  
12 BASIC_DURATION PSHLP_BASIC_DURATION_DE DAUER_4_1 QUAN 5   1   Basic Duration  
13 ORIG_BASIC_DURATION PSHLP_ORIG_BASIC_DURATION_DE DAUER_4_1 QUAN 5   1   Original Basic Duration  
14 LAST_BASIC_DURATION PSHLP_LAST_BASIC_DURATION_DE DAUER_4_1 QUAN 5   1   Last Basic Duration  
15 BASIC_DUR_UNIT PSHLP_BAS_DUR_UNIT_DE EINHEIT UNIT 3   0   Basic Duration Unit  
16 ORIG_BASIC_DUR_UNIT PSHLP_ORIG_BAS_DUR_UNIT_DE EINHEIT UNIT 3   0   Unit of Original Basic Duration  
17 LAST_BASIC_DUR_UNIT PSHLP_LAST_BAS_DUR_UNIT_DE EINHEIT UNIT 3   0   Unit of Last Basic Duration  
18 BASIC_EAR_START PSHLP_BAS_EARL_START_DE DATUM DATS 8   0   Basic Start Date (Earliest)  
19 ORIG_BASIC_EAR_START PSHLP_ORIG_BAS_EARL_START_DE DATUM DATS 8   0   Original Basic Start Date (Earliest)  
20 LAST_BASIC_EAR_START PSHLP_LAST_BAS_EARL_START_DE DATUM DATS 8   0   Last Basic Start Date (Earliest)  
21 BASIC_EAR_FINISH PSHLP_BAS_EARL_FINISH_DE DATUM DATS 8   0   Basic Finish Date (Earliest)  
22 ORIG_BASIC_EAR_FINISH PSHLP_ORIG_BAS_EARL_FINISH_DE DATUM DATS 8   0   Original Basic Finish Date (Earliest)  
23 LAST_BASIC_EAR_FINISH PSHLP_LAST_BAS_EARL_FINISH_DE DATUM DATS 8   0   Last Basic Finish Date (Earliest)  
24 BASIC_LAT_START PSHLP_BASIC_LATEST_START_DE DATUM DATS 8   0   Basic Start Date (Latest)  
25 ORIG_BASIC_LAT_START PSHLP_ORIG_BAS_LATEST_START_DE DATUM DATS 8   0   Original Basic Start Date (Latest)  
26 LAST_BASIC_LAT_START PSHLP_LAST_BAS_LATEST_START_DE DATUM DATS 8   0   Last Basic Start Date (Latest)  
27 BASIC_LAT_FINISH PSHLP_BASIC_LATEST_FINISH_DE DATUM DATS 8   0   Basic Finish Date (Latest)  
28 ORIG_BASIC_LAT_FINISH PSHLP_ORIG_BAS_LATEST_FIN_DE DATUM DATS 8   0   Original Basic Finish Date (Latest)  
29 LAST_BASIC_LAT_FINISH PSHLP_LAST_BAS_LATEST_FIN_DE DATUM DATS 8   0   Last Basic Finish Date (Latest)  
30 BASIC_SCH_START PSHLP_BASIC_SCHED_START_DE DATUM DATS 8   0   Basic Start Date (Scheduled)  
31 ORIG_BASIC_SCH_START PSHLP_ORIG_BAS_SCHED_START_DE DATUM DATS 8   0   Original Basic Start Date (Scheduled)  
32 LAST_BASIC_SCH_START PSHLP_LAST_BAS_SCHED_START_DE DATUM DATS 8   0   Last Basic Start Date (Scheduled)  
33 BASIC_SCH_FINISH PSHLP_BASIC_SCHED_FINISH_DE DATUM DATS 8   0   Basic Finish Date (Scheduled)  
34 ORIG_BASIC_SCH_FINISH PSHLP_ORIG_BAS_SCHED_FINISH_DE DATUM DATS 8   0   Original Basic Finish Date (Scheduled)  
35 LAST_BASIC_SCH_FINISH PSHLP_LAST_BAS_SCHED_FINISH_DE DATUM DATS 8   0   Last Basic Finish Date (Scheduled)  
36 BASIC_SCH_RELEASE PSHLP_BASIC_SCHED_RELEASE_DE DATUM DATS 8   0   Basic Release Date (Scheduled)  
37 ORIG_BASIC_SCH_RELEASE PSHLP_ORIG_BASIC_SCHED_REL_DE DATUM DATS 8   0   Original Basic Release Date (Scheduled)  
38 LAST_BASIC_SCH_RELEASE PSHLP_LAST_BASIC_SCHED_REL_DE DATUM DATS 8   0   Last Basic Release Date (Scheduled)  
39 FORECAST_START PSHLP_FORECAST_START_DE DATUM DATS 8   0   Forecast Start Date  
40 ORIG_FORECAST_START PSHLP_ORIG_FORECAST_START_DE DATUM DATS 8   0   Original Forecast Start Date  
41 LAST_FORECAST_START PSHLP_LAST_FORECAST_START_DE DATUM DATS 8   0   Last Forecast Start Date  
42 FORECAST_FINISH PSHLP_FORECAST_FINISH_DE DATUM DATS 8   0   Forecast Finish Date  
43 ORIG_FORECAST_FINISH PSHLP_ORIG_FORECAST_FINISH_DE DATUM DATS 8   0   Original Forecast Finish Date  
44 LAST_FORECAST_FINISH PSHLP_LAST_FORECAST_FINISH_DE DATUM DATS 8   0   Last Forecast Finish Date  
45 FORECAST_DURATION PSHLP_FORECAST_DURATION_DE DAUER_4_1 QUAN 5   1   Forecast Duration  
46 ORIG_FORECAST_DURATION PSHLP_ORIG_FRCST_DURATION_DE DAUER_4_1 QUAN 5   1   Original Forecast Duration  
47 LAST_FORECAST_DURATION PSHLP_LAST_FRCST_DURATION_DE DAUER_4_1 QUAN 5   1   Last Forecast Duration  
48 FORECAST_DUR_UNIT PSHLP_FRCST_DUR_UNIT_DE EINHEIT UNIT 3   0   Forecast Duration Unit  
49 ORIG_FORECAST_DUR_UNIT PSHLP_ORIG_FRCST_DUR_UNIT_DE EINHEIT UNIT 3   0   Original Forecast Duration Unit  
50 LAST_FORECAST_DUR_UNIT PSHLP_LAST_FRCST_DUR_UNIT_DE EINHEIT UNIT 3   0   Unit of Last Forecast Duration  
51 FORECAST_EAR_START PSHLP_FRCST_EARL_START_DE DATUM DATS 8   0   Forecast Start Date (Earliest)  
52 ORIG_FORECAST_EAR_START PSHLP_ORIG_FCST_EAR_START_DE DATUM DATS 8   0   Original Forecast Start Date (Earliest)  
53 LAST_FORECAST_EAR_START PSHLP_LAST_FCST_EAR_START_DE DATUM DATS 8   0   Last Forecast Start Date (Earliest)  
54 FORECAST_EAR_FINISH PSHLP_FRCST_EARL_FINISH_DE DATUM DATS 8   0   Forecast Finish Date (Earliest)  
55 ORIG_FORECAST_EAR_FINISH PSHLP_ORIG_FCST_EAR_FIN_DE DATUM DATS 8   0   Original Forecast Finish Date (Earliest)  
56 LAST_FORECAST_EAR_FINISH PSHLP_LAST_FCST_EAR_FIN_DE DATUM DATS 8   0   Last Forecast Finish Date (Earliest)  
57 FORECAST_LAT_START PSHLP_FRCST_LATEST_START_DE DATUM DATS 8   0   Forecast Start Date (Latest)  
58 ORIG_FORECAST_LAT_START PSHLP_ORIG_FCST_LATST_START_DE DATUM DATS 8   0   Original Forecast Start Date (Latest)  
59 LAST_FORECAST_LAT_START PSHLP_LAST_FCST_LATST_START_DE DATUM DATS 8   0   Last Forecast Start Date (Latest)  
60 FORECAST_LAT_FINISH PSHLP_FRCST_LATEST_FINISH_DE DATUM DATS 8   0   Forecast Finish Date (Latest)  
61 ORIG_FORECAST_LAT_FINISH PSHLP_ORIG_FCST_LATST_FIN_DE DATUM DATS 8   0   Original Forecast Finish Date (Latest)  
62 LAST_FORECAST_LAT_FINISH PSHLP_LAST_FCST_LATST_FIN_DE DATUM DATS 8   0   Last Forecast Finish Date (Latest)  
63 FORECAST_SCH_START PSHLP_FRCST_SCHED_START_DE DATUM DATS 8   0   Forecast Start Date (Scheduled)  
64 ORIG_FORECAST_SCH_START PSHLP_ORIG_FCST_SCHED_START_DE DATUM DATS 8   0   Original Forecast Start Date (Scheduled)  
65 LAST_FORECAST_SCH_START PSHLP_LAST_FCST_SCHED_START_DE DATUM DATS 8   0   Last Forecast Start Date (Scheduled)  
66 FORECAST_SCH_FINISH PSHLP_FRCST_SCHED_FINISH_DE DATUM DATS 8   0   Forecast Finish Date (Scheduled)  
67 ORIG_FORECAST_SCH_FINISH PSHLP_ORIG_FCST_SCHED_FIN_DE DATUM DATS 8   0   Original Forecast Finish Date (Scheduled)  
68 LAST_FORECAST_SCH_FINISH PSHLP_LAST_FCST_SCHED_FIN_DE DATUM DATS 8   0   Last Forecast Finish Date (Scheduled)  
69 FORECAST_SCH_RELEASE PSHLP_FRCST_SCHED_RELEASE_DE DATUM DATS 8   0   Forecast Release Date (Scheduled)  
70 ORIG_FORECAST_SCH_RELEASE PSHLP_ORIG_FCST_SCHED_REL_DE DATUM DATS 8   0   Original Forecast Release Date (Scheduled)  
71 LAST_FORECAST_SCH_RELEASE PSHLP_LAST_FCST_SCHED_REL_DE DATUM DATS 8   0   Last Forecast Release Date (Scheduled)  
72 ACTUAL_START PSHLP_ACTUAL_START_DE DATUM DATS 8   0   Actual Start Date  
73 ORIG_ACTUAL_START PSHLP_ORIG_ACTUAL_START_DE DATUM DATS 8   0   Original Actual Start Date  
74 LAST_ACTUAL_START PSHLP_LAST_ACTUAL_START_DE DATUM DATS 8   0   Last Actual Start Date  
75 ACTUAL_FINISH PSHLP_ACTUAL_FINISH_DE DATUM DATS 8   0   Actual Finish Date  
76 ORIG_ACTUAL_FINISH PSHLP_ORIG_ACTUAL_FINISH_DE DATUM DATS 8   0   Original Actual Finish Date  
77 LAST_ACTUAL_FINISH PSHLP_LAST_ACTUAL_FINISH_DE DATUM DATS 8   0   Last Actual Finish Date  
78 ACTUAL_DURATION PSHLP_ACTUAL_DURATION_DE DAUER_4_1 QUAN 5   1   Actual Duration  
79 ORIG_ACTUAL_DURATION PSHLP_ORIG_ACTUAL_DURATION_DE DAUER_4_1 QUAN 5   1   Original Actual Duration  
80 LAST_ACTUAL_DURATION PSHLP_LAST_ACTUAL_DURATION_DE DAUER_4_1 QUAN 5   1   Last Actual Duration  
81 ACTUAL_DUR_UNIT PSHLP_ACTUAL_DUR_UNIT_DE EINHEIT UNIT 3   0   Actual Duration Unit  
82 ORIG_ACTUAL_DUR_UNIT PSHLP_ORIG_ACTUAL_DUR_UNIT_DE EINHEIT UNIT 3   0   Original Actual Unit of Duration  
83 LAST_ACTUAL_DUR_UNIT PSHLP_LAST_ACTUAL_DUR_UNIT_DE EINHEIT UNIT 3   0   Last Actual Unit of Duration  
84 ACTUAL_TEN_START PSHLP_TENT_ACTUAL_START_DE DATUM DATS 8   0   Actual Start Date (Tentative)  
85 ORIG_ACTUAL_TEN_START PSHLP_ORIG_TENT_ACTL_START_DE DATUM DATS 8   0   Original Actual Start Date (Tentative)  
86 LAST_ACTUAL_TEN_START PSHLP_LAST_TENT_ACTL_START_DE DATUM DATS 8   0   Last Actual Start Date (Tentative)  
87 ACTUAL_TEN_FINISH PSHLP_TENT_ACTUAL_FINISH_DE DATUM DATS 8   0   Actual Finish Date (Tentative)  
88 ORIG_ACTUAL_TEN_FINISH PSHLP_ORIG_TENT_ACTL_FINISH_DE DATUM DATS 8   0   Original Actual Finish Date (Tentative)  
89 LAST_ACTUAL_TEN_FINISH PSHLP_LAST_TENT_ACTL_FINISH_DE DATUM DATS 8   0   Last Actual Finish Date (Tentative)  
90 FACT_CAL CALID WFCID CHAR 2   0   Calendar ID *
91 AL85 VGTYP VORG_TYP CHAR 3   0   Activity or element category  
92 AL86 FRUEHER_2 DAUER_9_1 QUAN 10   1   Actual start is before earliest scheduled start  
93 AL87 SPAETER_2 DAUER_9_1 QUAN 10   1   Actual Finish/Planned Finish After Latest Scheduled Finish  
94 AL88 VERZUG_2 DAUER_9_1 QUAN 10   1   Duration After Latest Scheduled Finish  
95 AL89 VORBEI_2 DAUER_9_1 QUAN 10   1   Duration After Earliest Scheduled Start  
96 AL90 FLG_CRIT XFELD CHAR 1   0   Indicator: Activity is critical  
97 AL91 FLG_SUBCRT XFELD CHAR 1   0   Indicator: Activity is sub-critical  
98 AL92 FLG_DATE_CONFLICT XFELD CHAR 1   0   Date Conflict  
99 AL93 FLG_UPDATE_REQUIRED XFELD CHAR 1   0   Update Required  
100 TOTAL_FLOAT PUFFR_GESM PUFFER DEC 3   0   Total float  
101 FREE_FLOAT PUFFR_FREI PUFFER DEC 3   0   Free float  
102 AL96 FLG_ACTY_WO_PREDECESSOR XFELD CHAR 1   0   Activity Without Predecessor  
103 AL97 FLG_ACTY_WO_SUCCESSOR XFELD CHAR 1   0   Activity Without Successor  
104 FORECAST_DURATION_CNF PDAU DAUER_4_1 QUAN 5   1   Forecasted duration of activity from confirmation  
105 TENTATIVE_DURATION PS_VDAUER_VZ PS_DAUER_VZ QUAN 10   1   Tentative duration  
106 REMAINING_DURATION PS_RDAUER_VZ PS_DAUER_VZ QUAN 10   1   Remaining duration  
107 DEGREE_OF_PROCESSING CO_ABARB CO_ABARB NUMC 3   0   Confirmation: Degree of processing  
108 ACTIVITY_ELEMENT UVORN VORNR CHAR 4   0   Suboperation  
109 CELLTAB LVC_T_STYL   TTYP 0   0    
110 COLOR_TAB LVC_T_SCOL   TTYP 0   0    
111 EINSA PSHLP_CONST_BASIC_ST_DT_DE RESTRIKSTR CHAR 1   0   Constraint for Basic Start Date for Activity  
112 EINSE PSHLP_CONST_BASIC_FI_DT_DE RESTRIKEND CHAR 1   0   Constraint for Finish Date of the Activity  
113 NTANF PSHLP_CONST_BASIC_START_DT_DE VORGABESTR DATS 8   0   Constraint for Activity Start (Basic)  
114 NTANZ PSHLP_CONST_BASIC_START_TM_DE ATIME TIMS 6   0   Constraint for Activity Start time (Basic)  
115 NTEND PSHLP_CONST_BASIC_FINISH_DT_DE VORGABEEND DATS 8   0   Constraint for Finish of Activity (Basic)  
116 NTENZ PSHLP_CONST_BASIC_FINISH_TM_DE ATIME TIMS 6   0   Constraint for Activity Finish Time (Basic)  
117 EWSTA PSHLP_CONST_FRST_ST_DT_DE RESTRIKSTR CHAR 1   0   Forecast Date Constraint on Activity Start  
118 EWSTE PSHLP_CONST_FRST_FI_DT_DE RESTRIKEND CHAR 1   0   Forecast Date Constraint on Activity Finish  
119 EWSTD PSHLP_CONST_FRST_START_DT_DE DATUM DATS 8   0   Forecast Start Date for Activity  
120 EWSTZ PSHLP_CONST_FRST_START_TM_DE ATIME TIMS 6   0   Forecast Start Time of Activity  
121 EWEND PSHLP_CONST_FRST_FINISH_DT_DE DATUM DATS 8   0   Forecast Finish Date  
122 EWENZ PSHLP_CONST_FRST_FINISH_TM_DE ATIME TIMS 6   0   Forecast Finish Time for Activity  
123 ID PS_IS_ID CHAR40 CHAR 40   0   ID/Object key  
124 ACTIVE PSHLP_HAS_CHANGE_AUTH_DE XFELD CHAR 1   0   Has Change Authorization  
125 DISPLAY PSHLP_HAS_DISPLAY_AUTH_DE XFELD CHAR 1   0   Forecast Finish Time for Activity  
126 TLEVEL SEU_LEVEL SEU_LEVEL NUMC 2   0   Node level  
History
Last changed by/on SAP  20130529 
SAP Release Created in 606