Data Element CP_OOFFSTE
Short Description Offset to sub-operation finish  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type VNZTV    
Data Type QUAN   Quantity field, points to a unit field with format UNIT 
Length 5    
Decimal Places 0    
Output Length 7    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Offset 
Medium 15 Offset 
Long 20 Offset to finish 
Heading 13 Offset 
Documentation

Definition

Offset between the sub-operation finish and the corresponding reference date.

Supplementary Documentation - CP_OOFFSTE0001

Use

The offset is used together with the reference date to calculate the finish date of the sub-operation.

  • If the offset is negative, the sub-operation finishes before the reference date. Please enter the minus sign after the value for the offset (for example, 45-).
  • If the offset is positive, the sub-operation finishes after the reference date.

Supplementary Documentation - CP_OOFFSTE2380

Definition

Activity element offset to the start of the activity.

Dependencies

The offset for the finish must not be positive, that is, it must not be after the activity finish date.

Supplementary Documentation - CP_OOFFSTE4430

Definition

Offset between the finish of resource usage and the finish of the superior operation / superior phase.

Procedure

  • If the resource date is after the reference date, enter a positive value for the offset.
  • If the resource date is before the reference date, enter a negative value for the offset.

    Enter the minus sign after the number.

Supplementary Documentation - CP_OOFFSTE5190

Definition

Offset from the end of usage of the secondary resource to the corresponding reference date.