SAP ABAP Data Element /MRSS/T_RM_CN_RFPNT (Reference point for BOM transfer)
Hierarchy
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
   PM-WOC-CP (Application Component) Capacity and Resource Planning
     /MRSS/RMI_NW (Package) RM Integration Layer
Basic Data
Data Element /MRSS/T_RM_CN_RFPNT
Short Description Reference point for BOM transfer  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type CHAR20    
Data Type CHAR   Character String 
Length 20    
Decimal Places 0    
Output Length 20    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Ref. point 
Medium 15 Reference point 
Long 20 Reference point 
Heading 20 Reference point 
Documentation

Definition

Establishes a logical connection between BOM items and network activities

Use

You must first create the reference points that you want to enter here in Customizing for Project System under Material -> Bill of Material Transfer.

If you enter the same reference point in BOM items and a network activity, you can automatically assign these items to the operation using the BOM transfer or update the assignment.

Dependencies

If you defined other fields as reference points in the BOM item and operation in an earlier release, the system ignores the new Reference Point field.

To use this field, you must first delete the definition of the other fields in the IMG activity Define Fields in BOM and Activity as Reference Point.

History
Last changed by/on SAP  20141109 
SAP Release Created in 700