SAP ABAP Data Element /MRSS/T_RM_SPLITTUNG (Required splitting)
Hierarchy
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
   PM-WOC-CP (Application Component) Capacity and Resource Planning
     /MRSS/RMI_NW (Package) RM Integration Layer
Basic Data
Data Element /MRSS/T_RM_SPLITTUNG
Short Description Required splitting  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type XFELD    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Req.spltng 
Medium 15 Req. splitting 
Long 20 Required splitting 
Heading ReqSplt 
Documentation

Definition

You use this indicator to specify that the operation must be split during scheduling.

If you do not select the indicator, the operation is split during reduction if you defined splitting in the reduction strategy.

Use

The following methods are available for splitting an operation:

  • You can enter a maximum number of splits.

    The system distributes the lot or operation processing across this number of partial lots or individual capacities.

  • You can enter a minimum processing time.

    During this economical splitting, the system determines the number of splits by dividing the processing time of the operation by the minimum processing time.

In both methods, distribution is restricted to the number of individual capacities that are assigned to the scheduling-relevant capacity in the work center.

If you select the Required Splitting indicator but do not enter a minimum processing time or the maximum number of splits, the system distributes the lot or operation processing across the number of individual capacities of the scheduling-relevant capacity.

Dependencies

The operation is split only if you specify that it is scheduled in the control key.

History
Last changed by/on SAP  20141109 
SAP Release Created in 700