SAP ABAP Data Element /MRSS/T_RM_SCEND_ACT (Ind.: Purchase requisition at activity finish date)
Hierarchy
☛
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
⤷
PM-WOC-CP (Application Component) Capacity and Resource Planning
⤷
/MRSS/RMI_NW (Package) RM Integration Layer
⤷
⤷
Basic Data
| Data Element | /MRSS/T_RM_SCEND_ACT |
| Short Description | Ind.: Purchase requisition at activity finish date |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | CHAR1 | |
| Data Type | CHAR | Character String |
| Length | 1 | |
| Decimal Places | 0 | |
| Output Length | 1 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | ||
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | PReq fin. |
| Medium | 15 | Purch.Req. fin. |
| Long | 20 | Purch. req. at fin. |
| Heading | 2 | FD |
Documentation
Definition
You use this indicator to specify that the purchase requisition of an external operation or element is aligned with the end date of the operation. In this case, the planned delivery date of the purchase requisition is set accordingly.
Dependencies
Selecting this indicator also impacts purchasing and the time at which planned costs and commitments are generated.
History
| Last changed by/on | SAP | 20141109 |
| SAP Release Created in | 700 |