SAP ABAP Data Element /MRSS/T_RM_CP_OBZOFFE (Reference date for finish of sub-operation)
Hierarchy
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
   PM-WOC-CP (Application Component) Capacity and Resource Planning
     /MRSS/RMI_NW (Package) RM Integration Layer
Basic Data
Data Element /MRSS/T_RM_CP_OBZOFFE
Short Description Reference date for finish of sub-operation  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type CHAR2    
Data Type CHAR   Character String 
Length 2    
Decimal Places 0    
Output Length 2    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Reference 
Medium 15 Reference 
Long 20 Ref. date for finish 
Heading 55 Reference date for finish of sub-operation 
Documentation

Definition

Key that you use to specify a time (such as the start date for setup or the end date for processing an operation).

Use

This reference date is required, together with the offset, to calculate the end date of the suboperation.

History
Last changed by/on SAP  20141109 
SAP Release Created in 700