Data Element list used by SAP ABAP Table /MRSS/T_RMI_ROLE_NW (Role)
SAP ABAP Table /MRSS/T_RMI_ROLE_NW (Role) is using
pages: 1 2
# | Object Type | Object Name | Object Description | Note |
---|---|---|---|---|
1 | Data Element | /MRSS/T_GUID | GUID | |
2 | Data Element | /MRSS/T_RM_ABLIPKZ | Indicator: simultaneous teardown and wait | |
3 | Data Element | /MRSS/T_RM_ABRUE | Teardown | |
4 | Data Element | /MRSS/T_RM_ACTIVITY_TYPE | Process variant | |
5 | Data Element | /MRSS/T_RM_ADDCOMPARE_CORE | Reference Element PM/PS | |
6 | Data Element | /MRSS/T_RM_AFAKT | Execution Factor | |
7 | Data Element | /MRSS/T_RM_ANFKO | Requesting cost center | |
8 | Data Element | /MRSS/T_RM_ANFKOKRS | Controlling area of the requesting cost center | |
9 | Data Element | /MRSS/T_RM_ANLZU | Syst.Condition | |
10 | Data Element | /MRSS/T_RM_ANZMS | Number of employees | |
11 | Data Element | /MRSS/T_RM_ARUZE | Unit of measure for teardown | |
12 | Data Element | /MRSS/T_RM_ASSIGNMENTTYPE_NW | Assignment Types | |
13 | Data Element | /MRSS/T_RM_ASVRG | Operation scrap | |
14 | Data Element | /MRSS/T_RM_AUFAEDAT_NW | Change date for Order Master | |
15 | Data Element | /MRSS/T_RM_AUFAENAM_NW | Last changed by | |
16 | Data Element | /MRSS/T_RM_AUFERFDAT_NW | Created on | |
17 | Data Element | /MRSS/T_RM_AUFERFNAM_NW | Entered by | |
18 | Data Element | /MRSS/T_RM_AUFERFNAM_NW | Entered by | |
19 | Data Element | /MRSS/T_RM_AUFLOEKZ | Deletion flag | |
20 | Data Element | /MRSS/T_RM_AUMNG | Scrap quantity | |
21 | Data Element | /MRSS/T_RM_AUMNG | Scrap quantity | |
22 | Data Element | /MRSS/T_RM_AUSCHUFAK | Scrap factor | |
23 | Data Element | /MRSS/T_RM_BAGRP | Assembly | |
24 | Data Element | /MRSS/T_RM_BAUGR | Material number of higher-level assembly | |
25 | Data Element | /MRSS/T_RM_BEARZEIT | Processing time | |
26 | Data Element | /MRSS/T_RM_BEAZEP | Unit of processing time (Forecast) | |
27 | Data Element | /MRSS/T_RM_BEDID | ID of the capacity requirements record | |
28 | Data Element | /MRSS/T_RM_BILLING_OBJ_TYPE_NW | Billing Object Type | |
29 | Data Element | /MRSS/T_RM_BILLING_RATE | Billing rate to Customer - Amount | |
30 | Data Element | /MRSS/T_RM_BILLING_RATE_UNT_NW | Billing Rate Unit (hour or day) | |
31 | Data Element | /MRSS/T_RM_BILL_OBJ | SO/IO/CC Number | |
32 | Data Element | /MRSS/T_RM_BMSCH | Base Quantity | |
33 | Data Element | /MRSS/T_RM_BUDGET_NW | Budget | |
34 | Data Element | /MRSS/T_RM_CALC_COST_RATE | Calculated Cost Rate | |
35 | Data Element | /MRSS/T_RM_CANDIDATESUMMARY_NW | Candidate Summary | |
36 | Data Element | /MRSS/T_RM_CIM_COUNT | Internal counter | |
37 | Data Element | /MRSS/T_RM_CK_KALNR | Cost Estimate Number for Cost Est. w/o Qty Structure | |
38 | Data Element | /MRSS/T_RM_CK_KLVAR | Costing Variant | |
39 | Data Element | /MRSS/T_RM_CN_AUTH | Ind.: Authorization exists | |
40 | Data Element | /MRSS/T_RM_CN_AUTH | Ind.: Authorization exists | |
41 | Data Element | /MRSS/T_RM_CN_AUTH | Ind.: Authorization exists | |
42 | Data Element | /MRSS/T_RM_CN_AUTH | Ind.: Authorization exists | |
43 | Data Element | /MRSS/T_RM_CN_AUTH | Ind.: Authorization exists | |
44 | Data Element | /MRSS/T_RM_CN_AUTH | Ind.: Authorization exists | |
45 | Data Element | /MRSS/T_RM_CN_AUTH | Ind.: Authorization exists | |
46 | Data Element | /MRSS/T_RM_CN_KZFIX | Indicator: Purchasing info record data are fixed | |
47 | Data Element | /MRSS/T_RM_CN_RFPNT | Reference point for BOM transfer | |
48 | Data Element | /MRSS/T_RM_CN_RPIP | Reference Point for Relationship Between iPPE and PS | |
49 | Data Element | /MRSS/T_RM_CO_APLZL | General counter for order | |
50 | Data Element | /MRSS/T_RM_CO_APLZL | General counter for order | |
51 | Data Element | /MRSS/T_RM_CO_APLZL | General counter for order | |
52 | Data Element | /MRSS/T_RM_CO_AUFPL | Routing number of operations in the order | |
53 | Data Element | /MRSS/T_RM_CO_AUFPL | Routing number of operations in the order | |
54 | Data Element | /MRSS/T_RM_CO_BANFN | Purchase requisition number | |
55 | Data Element | /MRSS/T_RM_CO_BANFN | Purchase requisition number | |
56 | Data Element | /MRSS/T_RM_CO_BNFPO | Item number of the purchase requisition in the order | |
57 | Data Element | /MRSS/T_RM_CO_BNFPO | Item number of the purchase requisition in the order | |
58 | Data Element | /MRSS/T_RM_CO_FRDLB | Indicator: Externally processed op. with subcontracting | |
59 | Data Element | /MRSS/T_RM_CO_IPRZS | Confirmed quantity/work for business process | |
60 | Data Element | /MRSS/T_RM_CO_LEIKZ | Indicator: No remaining activity expected | |
61 | Data Element | /MRSS/T_RM_CO_LEIKZ | Indicator: No remaining activity expected | |
62 | Data Element | /MRSS/T_RM_CO_LEIKZ | Indicator: No remaining activity expected | |
63 | Data Element | /MRSS/T_RM_CO_LEIKZ | Indicator: No remaining activity expected | |
64 | Data Element | /MRSS/T_RM_CO_LEIKZ | Indicator: No remaining activity expected | |
65 | Data Element | /MRSS/T_RM_CO_LEIKZ | Indicator: No remaining activity expected | |
66 | Data Element | /MRSS/T_RM_CO_PEDZ | Forecast finish time of operation from confirmation | |
67 | Data Element | /MRSS/T_RM_CO_PRZNR | Business Process | |
68 | Data Element | /MRSS/T_RM_CO_RUMNG | Previously confirmed activity | |
69 | Data Element | /MRSS/T_RM_CO_RUMNG | Previously confirmed activity | |
70 | Data Element | /MRSS/T_RM_CO_RUMNG | Previously confirmed activity | |
71 | Data Element | /MRSS/T_RM_CO_RUMNG | Previously confirmed activity | |
72 | Data Element | /MRSS/T_RM_CO_RUMNG | Previously confirmed activity | |
73 | Data Element | /MRSS/T_RM_CO_RUMNG | Previously confirmed activity | |
74 | Data Element | /MRSS/T_RM_CO_SCHAETZ | Forecast value used to update the standard value | |
75 | Data Element | /MRSS/T_RM_CO_SCHAETZ | Forecast value used to update the standard value | |
76 | Data Element | /MRSS/T_RM_CO_SCHAETZ | Forecast value used to update the standard value | |
77 | Data Element | /MRSS/T_RM_CO_SCHAETZ | Forecast value used to update the standard value | |
78 | Data Element | /MRSS/T_RM_CO_SCHAETZ | Forecast value used to update the standard value | |
79 | Data Element | /MRSS/T_RM_CO_SCHAETZ | Forecast value used to update the standard value | |
80 | Data Element | /MRSS/T_RM_CO_SELKZ | Selection indicator for costing line items | |
81 | Data Element | /MRSS/T_RM_CP_OBZOFFB | Reference date for start of sub-operation | |
82 | Data Element | /MRSS/T_RM_CP_OBZOFFE | Reference date for finish of sub-operation | |
83 | Data Element | /MRSS/T_RM_CP_OEHOFFB | Unit for offset to start | |
84 | Data Element | /MRSS/T_RM_CP_OEHOFFE | Unit for offset to finish | |
85 | Data Element | /MRSS/T_RM_CP_OOFFSTB | Offset to sub-operation start | |
86 | Data Element | /MRSS/T_RM_CP_OOFFSTE | Offset to sub-operation finish | |
87 | Data Element | /MRSS/T_RM_CP_UMREN | Denominator for converting rtg and op units of measure | |
88 | Data Element | /MRSS/T_RM_CP_UMREZ | Numerator for converting task list and oper. un. of measure | |
89 | Data Element | /MRSS/T_RM_CR_OBJID | Object ID of the resource | |
90 | Data Element | /MRSS/T_RM_CR_OBJID_I | Actual operating resources object identification | |
91 | Data Element | /MRSS/T_RM_CR_PDEST | Printer for shop papers | |
92 | Data Element | /MRSS/T_RM_CR_RS_ANZ | Number of confirmation slips | |
93 | Data Element | /MRSS/T_RM_CS_ITMID | External identification of an item | |
94 | Data Element | /MRSS/T_RM_CY_SEQNRV | Sequence number operation | |
95 | Data Element | /MRSS/T_RM_DEM_COUNT | Counter for Demands in Operation | |
96 | Data Element | /MRSS/T_RM_DKCHG | Ind. : Document assignment to material component changed | |
97 | Data Element | /MRSS/T_RM_DZCODE | Reference number for standard value code | |
98 | Data Element | /MRSS/T_RM_DZEIER | Unit for the break time | |
99 | Data Element | /MRSS/T_RM_DZEILM | Unit for the maximum wait time | |
100 | Data Element | /MRSS/T_RM_DZEILP | Unit for the required wait time | |
101 | Data Element | /MRSS/T_RM_DZEIMB | Unit for the minimum processing time | |
102 | Data Element | /MRSS/T_RM_DZEIMU | Unit for the minimum overlap time | |
103 | Data Element | /MRSS/T_RM_DZEITM | Unit for the minimum move time | |
104 | Data Element | /MRSS/T_RM_DZEITN | Unit for the standard move time | |
105 | Data Element | /MRSS/T_RM_DZEIWM | Unit for the minumum queue time | |
106 | Data Element | /MRSS/T_RM_DZEIWN | Unit for the standard queue time | |
107 | Data Element | /MRSS/T_RM_DZERMA | Type of standard value calculation | |
108 | Data Element | /MRSS/T_RM_DZGDAT | Date when the standard value was calculated | |
109 | Data Element | /MRSS/T_RM_DZLMAX | Maximum wait time | |
110 | Data Element | /MRSS/T_RM_DZLPRO | Minimum wait time | |
111 | Data Element | /MRSS/T_RM_DZMERH | Break | |
112 | Data Element | /MRSS/T_RM_DZMINB | Minimum processing time | |
113 | Data Element | /MRSS/T_RM_DZMINU | Minimum overlap time | |
114 | Data Element | /MRSS/T_RM_DZTMIN | Minimum move time | |
115 | Data Element | /MRSS/T_RM_DZTNOR | Standard move time | |
116 | Data Element | /MRSS/T_RM_DZULNR | Basis for standard value calculation | |
117 | Data Element | /MRSS/T_RM_DZWMIN | Minimum queue time | |
118 | Data Element | /MRSS/T_RM_DZWNOR | Standard queue time | |
119 | Data Element | /MRSS/T_RM_EBORT | Installation Point for Subitem | |
120 | Data Element | /MRSS/T_RM_EPANF | Dispatched start date for operation | |
121 | Data Element | /MRSS/T_RM_EPANZ | Dispatched start time for operation | |
122 | Data Element | /MRSS/T_RM_EPEND | Dispatched finish date | |
123 | Data Element | /MRSS/T_RM_EPENZ | Dispatched finish time | |
124 | Data Element | /MRSS/T_RM_ESCALATION_NW | Escalation Reason - Role | |
125 | Data Element | /MRSS/T_RM_EV_WEIGHTD | Aggregation weight for POC (PS progress) | |
126 | Data Element | /MRSS/T_RM_FE_IND | Regulatory indicator | |
127 | Data Element | /MRSS/T_RM_FLAG_NW | Indicator | |
128 | Data Element | /MRSS/T_RM_FLAG_NW | Indicator | |
129 | Data Element | /MRSS/T_RM_FLAG_NW | Indicator | |
130 | Data Element | /MRSS/T_RM_FLAG_NW | Indicator | |
131 | Data Element | /MRSS/T_RM_FLAG_NW | Indicator | |
132 | Data Element | /MRSS/T_RM_FLAG_NW | Indicator | |
133 | Data Element | /MRSS/T_RM_FLAG_NW | Indicator | |
134 | Data Element | /MRSS/T_RM_FLAG_NW | Indicator | |
135 | Data Element | /MRSS/T_RM_FLEX_START_DATE | Flexible Start Date | |
136 | Data Element | /MRSS/T_RM_FLG_CALC | Indicator: Order (network etc.) still to be calculated | |
137 | Data Element | /MRSS/T_RM_FLG_PURS | Indicator: Purchase order exists | |
138 | Data Element | /MRSS/T_RM_FLG_VAB | Indicator: Sub-network exists | |
139 | Data Element | /MRSS/T_RM_FLIESSKZ | Indicator: continuous flow production | |
140 | Data Element | /MRSS/T_RM_FOLGENART | Sequence category | |
141 | Data Element | /MRSS/T_RM_FORDP | Item of framework order | |
142 | Data Element | /MRSS/T_RM_FRSP | Earliest possible activity / Latest possible activity | |
143 | Data Element | /MRSS/T_RM_FRUNV | Indicator: External procurement data incomplete | |
144 | Data Element | /MRSS/T_RM_FSEDD | Earliest scheduled finish: Execution (date) | |
145 | Data Element | /MRSS/T_RM_FSELD | Earliest scheduled finish: Wait (date) | |
146 | Data Element | /MRSS/T_RM_FSELZ | Earliest scheduled finish: Wait (time) | |
147 | Data Element | /MRSS/T_RM_FSSAD | Earliest scheduled start: Teardown (date) | |
148 | Data Element | /MRSS/T_RM_FSSAZ | Earliest scheduled start: Teardown (time) | |
149 | Data Element | /MRSS/T_RM_FSSBD | Earliest scheduled start: Processing (date) | |
150 | Data Element | /MRSS/T_RM_FSSBZ | Earliest scheduled start: Processing (time) | |
151 | Data Element | /MRSS/T_RM_FSSLD | Earliest scheduled start: Wait (date) | |
152 | Data Element | /MRSS/T_RM_FSSLZ | Earliest scheduled start: Wait (time) | |
153 | Data Element | /MRSS/T_RM_GMNGA | Confirmed yield in order unit of measure | |
154 | Data Element | /MRSS/T_RM_GRUND | Reason for manual valuation of net assets | |
155 | Data Element | /MRSS/T_RM_IEAVD | Actual finish of operation (date) | |
156 | Data Element | /MRSS/T_RM_IEBD | Actual finish: Processing(date) | |
157 | Data Element | /MRSS/T_RM_IEBZ | Actual processing finish (time) | |
158 | Data Element | /MRSS/T_RM_IEDD | Actual finish: Execution (date) | |
159 | Data Element | /MRSS/T_RM_IEDZ | Actual finish: Execution (time) | |
160 | Data Element | /MRSS/T_RM_IERD | Actual finish: Setup (date) | |
161 | Data Element | /MRSS/T_RM_IERZ | Actual finish: Setup (time) | |
162 | Data Element | /MRSS/T_RM_IMMEDIATE_REQ_NW | Consultant required in 24 hours | |
163 | Data Element | /MRSS/T_RM_IND | Nearshore/Offshore Indicator | |
164 | Data Element | /MRSS/T_RM_INDET | Key for calculation | |
165 | Data Element | /MRSS/T_RM_INIT_DONE | Internal Initialization Carried Out Once | |
166 | Data Element | /MRSS/T_RM_ISAD | Actual start: Teardown (date) | |
167 | Data Element | /MRSS/T_RM_ISAVD | Actual operation start (date) | |
168 | Data Element | /MRSS/T_RM_ISAZ | Actual start: Teardown (time) | |
169 | Data Element | /MRSS/T_RM_ISBD | Actual start: Processing (date) | |
170 | Data Element | /MRSS/T_RM_ISBZ | Actual start: Processing (time) | |
171 | Data Element | /MRSS/T_RM_ISDD | Actual start: Execution (date) | |
172 | Data Element | /MRSS/T_RM_ISDZ | Actual start: Execution/setup (time) | |
173 | Data Element | /MRSS/T_RM_ISERH | Confirmed break time | |
174 | Data Element | /MRSS/T_RM_ISTRU | Assembly | |
175 | Data Element | /MRSS/T_RM_JV_JIBCL | JIB/JIBE Class | |
176 | Data Element | /MRSS/T_RM_JV_JIBSA | JIB/JIBE Subclass A | |
177 | Data Element | /MRSS/T_RM_JV_OR_CO | JV original cost object | |
178 | Data Element | /MRSS/T_RM_JV_OTYPE | Joint Venture Object Type | |
179 | Data Element | /MRSS/T_RM_KAPT_PUFFR | Operation floats after finite scheduling (in seconds) | |
180 | Data Element | /MRSS/T_RM_KNOTE | Transportation Connection Points | |
181 | Data Element | /MRSS/T_RM_KRATE_NW | K-rate | |
182 | Data Element | /MRSS/T_RM_KTSCH | Standard text key | |
183 | Data Element | /MRSS/T_RM_KZKFG | Configurable Material | |
184 | Data Element | /MRSS/T_RM_KZLGF | Indicator: fixed lot external processing | |
185 | Data Element | /MRSS/T_RM_KZWRTF | Indicator: Fixed price for external processing | |
186 | Data Element | /MRSS/T_RM_LANGUAGE_NW | Language(s) | |
187 | Data Element | /MRSS/T_RM_LATEST_FEEDBCK_DATE | Latest Feedback date | |
188 | Data Element | /MRSS/T_RM_LD_TAKT | takt within a line segment | |
189 | Data Element | /MRSS/T_RM_LEKNW | Indicator: No Remaining Work Expected | |
190 | Data Element | /MRSS/T_RM_LIEGEZEIT | Wait time used for scheduling | |
191 | Data Element | /MRSS/T_RM_LIGZE | Unit of measure for wait time | |
192 | Data Element | /MRSS/T_RM_LMNGA | Total Yield Confirmed | |
193 | Data Element | /MRSS/T_RM_LOCATION_NW | Project Location | |
194 | Data Element | /MRSS/T_RM_LOHNANZ | Number of Time Tickets | |
195 | Data Element | /MRSS/T_RM_LOHNGRP | Wage group | |
196 | Data Element | /MRSS/T_RM_LTXA1 | Operation short text | |
197 | Data Element | /MRSS/T_RM_LTXA2 | Second line of the description | |
198 | Data Element | /MRSS/T_RM_MAT_PRKST | Material planning in networks: primary costs | |
199 | Data Element | /MRSS/T_RM_MDCI_VERSION_NW | Version Number | |
200 | Data Element | /MRSS/T_RM_MEPROFILE | External Procurement Profile | |
201 | Data Element | /MRSS/T_RM_MGVRG | Operation Quantity | |
202 | Data Element | /MRSS/T_RM_MINWEI | Minimum Send-Ahead Quantity | |
203 | Data Element | /MRSS/T_RM_NETZKONT | Indicator for the account assignment of a network(hdr/act.) | |
204 | Data Element | /MRSS/T_RM_NO_DISP_PLUS | Effective for Materials Planning | |
205 | Data Element | /MRSS/T_RM_NUMBER_DAYS_NW | Number of days per week (Working Ratio) | |
206 | Data Element | /MRSS/T_RM_OCM_CH_PROC | Process that has lead to the change of an object | |
207 | Data Element | /MRSS/T_RM_OCM_COMP_RES | OCM: Result of comparison of two order objects | |
208 | Data Element | /MRSS/T_RM_OCM_OBJ_TYPE | Change indicator | |
209 | Data Element | /MRSS/T_RM_OPRE1 | Unit for remaining quantity of business process | |
210 | Data Element | /MRSS/T_RM_OPRZ1 | Remaining quantity for business process | |
211 | Data Element | /MRSS/T_RM_ORDER_PROB | Order Probability ID | |
212 | Data Element | /MRSS/T_RM_ORDER_PROB_NW | Order Probability | |
213 | Data Element | /MRSS/T_RM_OWAERS | Object currency for network activity | |
214 | Data Element | /MRSS/T_RM_PBEARZEIT | Processing time (forecast) | |
215 | Data Element | /MRSS/T_RM_PHFLG | Indicator: Phase | |
216 | Data Element | /MRSS/T_RM_PHSEQ | Control Recipe Destination | |
217 | Data Element | /MRSS/T_RM_PLIFZ | Planned Delivery Time in Days | |
218 | Data Element | /MRSS/T_RM_PLNAL | Group Counter | |
219 | Data Element | /MRSS/T_RM_PLNFOLGE | Sequence | |
220 | Data Element | /MRSS/T_RM_PLNKN | Number of the task list node | |
221 | Data Element | /MRSS/T_RM_PLNNR | Key for Task List Group | |
222 | Data Element | /MRSS/T_RM_PRIORITAET | Priority | |
223 | Data Element | /MRSS/T_RM_PROD_ACT | Indicator: Activity is a production activity | |
224 | Data Element | /MRSS/T_RM_PROJECT_ACTIVITY_NW | Project Activity types | |
225 | Data Element | /MRSS/T_RM_PROJECT_PHASE_NW | Project Phase | |
226 | Data Element | /MRSS/T_RM_PROJ_COUNTRY_NW | Project Country | |
227 | Data Element | /MRSS/T_RM_PSTXCHG | Ind.: Changed PS text | |
228 | Data Element | /MRSS/T_RM_PS_SPS_ELE | Standard WBS element | |
229 | Data Element | /MRSS/T_RM_QEIFSUBSYS | Subsystem Identifier for QM Subsystem Interface | |
230 | Data Element | /MRSS/T_RM_QERFSICHT | Recording View | |
231 | Data Element | /MRSS/T_RM_QKZFEAT | Indicator Is Not Used Currently | |
232 | Data Element | /MRSS/T_RM_QKZPRFREI | Interval Without Reference to Time or Quantity | |
233 | Data Element | /MRSS/T_RM_QKZPRMENG | Creation Cycle = Quantity (Quantity-Reference) | |
234 | Data Element | /MRSS/T_RM_QKZPRZEIT | Interval = Time (Time-Related) | |
235 | Data Element | /MRSS/T_RM_QKZTLSBEST | Operation with Stock-Related Partial Lot Assignment | |
236 | Data Element | /MRSS/T_RM_QKZZTMG1 | Quantity Confirmation for Each Partial Lot | |
237 | Data Element | /MRSS/T_RM_QL_KAPART | Capacity category | |
238 | Data Element | /MRSS/T_RM_QPART | Inspection Type | |
239 | Data Element | /MRSS/T_RM_QPPKTABS | Flow Variants for Inspection Point Completion | |
240 | Data Element | /MRSS/T_RM_QRASTEREH | Grid Unit of Measure | |
241 | Data Element | /MRSS/T_RM_QRASTMENG | Quantity Between Two Inspections | |
242 | Data Element | /MRSS/T_RM_QRASTZEHT | Time Unit | |
243 | Data Element | /MRSS/T_RM_QRASTZFAK | Time Factor | |
244 | Data Element | /MRSS/T_RM_QUALF | Suitability | |
245 | Data Element | /MRSS/T_RM_RAP_SUPERVISOR_CNT | Number of Site Supervisors | |
246 | Data Element | /MRSS/T_RM_REASON_CLOSE_NW | Closed Reason | |
247 | Data Element | /MRSS/T_RM_RELEVANT_FOR_MRS | Operation Set as MRS-Relevant | |
248 | Data Element | /MRSS/T_RM_REMOTE_NW | Remote possible | |
249 | Data Element | /MRSS/T_RM_REM_EFFORT_RES_CNT | Determination of Remaining Demand: No. of Resources | |
250 | Data Element | /MRSS/T_RM_REQUEST_LOB_NW | Requester Line of Business | |
251 | Data Element | /MRSS/T_RM_REQU_UPD | Requirements Profile Was Changed Manually | |
252 | Data Element | /MRSS/T_RM_REQ_PARTNER | Requested Partner | |
253 | Data Element | /MRSS/T_RM_RMNGA | Total confirmed rework quantity | |
254 | Data Element | /MRSS/T_RM_ROLE_CATEGORY | Role Category | |
255 | Data Element | /MRSS/T_RM_ROLE_TYPE_NW | Role Type | |
256 | Data Element | /MRSS/T_RM_RO_GROUP_ROLE_NW | Role Owner Group - Role | |
257 | Data Element | /MRSS/T_RM_RSG_BOOLEAN | Boolean Variable | |
258 | Data Element | /MRSS/T_RM_RSG_BOOLEAN | Boolean Variable | |
259 | Data Element | /MRSS/T_RM_RSG_REQUID | Profile key | |
260 | Data Element | /MRSS/T_RM_RSG_TEAM_PLANNING | Team Planning flag for Demand | |
261 | Data Element | /MRSS/T_RM_RSG_TIME_RULE_ID | Time Rule Id | |
262 | Data Element | /MRSS/T_RM_RSTRA | Reduction strategy per operation/activity | |
263 | Data Element | /MRSS/T_RM_RSTUF | Reduction level which reduces operation lead time | |
264 | Data Element | /MRSS/T_RM_RSTZE | Unit of measure for setup time | |
265 | Data Element | /MRSS/T_RM_RUEARSCHLU | Setup Type Key | |
266 | Data Element | /MRSS/T_RM_RUEFAGRP | Setup group category | |
267 | Data Element | /MRSS/T_RM_RUEFASCHLU | Setup group key | |
268 | Data Element | /MRSS/T_RM_RUEST | Setup time | |
269 | Data Element | /MRSS/T_RM_RU_IPRZE | Unit of measurement for conf. quantity for business process | |
270 | Data Element | /MRSS/T_RM_RU_IPRZK | No remaining quantity expected for business process | |
271 | Data Element | /MRSS/T_RM_RWFAK | Rework factor (is not used yet) | |
272 | Data Element | /MRSS/T_RM_SCEND_ACT | Ind.: Purchase requisition at activity finish date | |
273 | Data Element | /MRSS/T_RM_SCOPE_CV | Object Class | |
274 | Data Element | /MRSS/T_RM_SERV_PHASE_NW | Resource Management Service Phase | |
275 | Data Element | /MRSS/T_RM_SFORDN | Framework Order | |
276 | Data Element | /MRSS/T_RM_SLA_EXCLUDE_NW | Reason code for Exclude from SLA | |
277 | Data Element | /MRSS/T_RM_SORTI | Sort Term for Non-Stock Info Records | |
278 | Data Element | /MRSS/T_RM_SPARAMETER | Scheduling Parameters for External Scheduling | |
279 | Data Element | /MRSS/T_RM_SPARAMETER | Scheduling Parameters for External Scheduling | |
280 | Data Element | /MRSS/T_RM_SPARAMETER | Scheduling Parameters for External Scheduling | |
281 | Data Element | /MRSS/T_RM_SPLITTANZ | Maximum number of splits | |
282 | Data Element | /MRSS/T_RM_SPLITTERM | Actual number of splits | |
283 | Data Element | /MRSS/T_RM_SPLITTUNG | Required splitting | |
284 | Data Element | /MRSS/T_RM_SPLIT_QTY | Split quantity in the order split | |
285 | Data Element | /MRSS/T_RM_SSELD | Latest scheduled finish: Wait time (date) | |
286 | Data Element | /MRSS/T_RM_SSELZ | Latest scheduled finish: Wait time | |
287 | Data Element | /MRSS/T_RM_SSSAD | Latest scheduled start: Teardown (date) | |
288 | Data Element | /MRSS/T_RM_SSSAZ | Latest scheduled start: Teardown (time) | |
289 | Data Element | /MRSS/T_RM_SSSBD | Latest scheduled start: Processing (date) | |
290 | Data Element | /MRSS/T_RM_SSSBZ | Latest scheduled start: Processing (time) | |
291 | Data Element | /MRSS/T_RM_SSSLD | Latest scheduled start: Wait time (date) | |
292 | Data Element | /MRSS/T_RM_SSSLZ | Latest scheduled start: Wait time | |
293 | Data Element | /MRSS/T_RM_STATUS_IND_NW | STATUS Indicator | |
294 | Data Element | /MRSS/T_RM_STDKN | Node of operation within reference operation set | |
295 | Data Element | /MRSS/T_RM_STEUS | Control key | |
296 | Data Element | /MRSS/T_RM_STLKN | BOM item node number | |
297 | Data Element | /MRSS/T_RM_STLTY | BOM category | |
298 | Data Element | /MRSS/T_RM_STLTY | BOM category | |
299 | Data Element | /MRSS/T_RM_STNUM | Bill of material | |
300 | Data Element | /MRSS/T_RM_SUMKNTNR | Node number of the superior operation | |
301 | Data Element | /MRSS/T_RM_SYSTEM_INFO_NW | System Info | |
302 | Data Element | /MRSS/T_RM_TABIX_D | Field defined as in SY-TABIX | |
303 | Data Element | /MRSS/T_RM_TIMESTAMP_BEGIN | Time Stamp: Start | |
304 | Data Element | /MRSS/T_RM_TIMESTAMP_BEGIN | Time Stamp: Start | |
305 | Data Element | /MRSS/T_RM_TIMESTAMP_END | Time stamp: end | |
306 | Data Element | /MRSS/T_RM_TIMESTAMP_END | Time stamp: end | |
307 | Data Element | /MRSS/T_RM_TRANSZEIT | Move time used for scheduling | |
308 | Data Element | /MRSS/T_RM_TRAZE | Unitof measure for move time | |
309 | Data Element | /MRSS/T_RM_TXCHG | Indicator: long text changed | |
310 | Data Element | /MRSS/T_RM_TXTKY | Internal text number (12-character) | |
311 | Data Element | /MRSS/T_RM_UEKANKZ | Optional overlapping | |
312 | Data Element | /MRSS/T_RM_UEMUSKZ | Required overlapping | |
313 | Data Element | /MRSS/T_RM_UPOSZ | Subitem Number | |
314 | Data Element | /MRSS/T_RM_USCREENCTL_DATACHGD | Data Was Changed in the Controls on the User Screen | |
315 | Data Element | /MRSS/T_RM_VBKZ | Update Indicator | |
316 | Data Element | /MRSS/T_RM_VGWRT | Standard Value | |
317 | Data Element | /MRSS/T_RM_VGWRT | Standard Value | |
318 | Data Element | /MRSS/T_RM_VGWRT | Standard Value | |
319 | Data Element | /MRSS/T_RM_VGWRT | Standard Value | |
320 | Data Element | /MRSS/T_RM_VGWRT | Standard Value | |
321 | Data Element | /MRSS/T_RM_VGWRT | Standard Value | |
322 | Data Element | /MRSS/T_RM_VGWRTEH | Unit of measure for the standard value | |
323 | Data Element | /MRSS/T_RM_VGWRTEH | Unit of measure for the standard value | |
324 | Data Element | /MRSS/T_RM_VGWRTEH | Unit of measure for the standard value | |
325 | Data Element | /MRSS/T_RM_VGWRTEH | Unit of measure for the standard value | |
326 | Data Element | /MRSS/T_RM_VGWRTEH | Unit of measure for the standard value | |
327 | Data Element | /MRSS/T_RM_VGWRTEH | Unit of measure for the standard value | |
328 | Data Element | /MRSS/T_RM_VG_EKGRP | Purchasing group for external processing | |
329 | Data Element | /MRSS/T_RM_VINTV | Increment between referenced operations | |
330 | Data Element | /MRSS/T_RM_VORGABEEND2 | Constraint for Finish of Activity (Basic) | |
331 | Data Element | /MRSS/T_RM_VORGSCHL | Standard value key | |
332 | Data Element | /MRSS/T_RM_VORNR | Role Number | |
333 | Data Element | /MRSS/T_RM_VPLBFL | Referenced sequence in routing | |
334 | Data Element | /MRSS/T_RM_VPLNAL | Group counter of the referenced task list | |
335 | Data Element | /MRSS/T_RM_VPLNNR | Group of the referenced task list | |
336 | Data Element | /MRSS/T_RM_VPLNTY | Type of the referenced task list | |
337 | Data Element | /MRSS/T_RM_VSINACT | Version inactive indicator | |
338 | Data Element | /MRSS/T_RM_VSTGA | Deadline deviation reason | |
339 | Data Element | /MRSS/T_RM_VSTZW | Deadline function | |
340 | Data Element | /MRSS/T_RM_WARTEZEIT | Queue timeQueue time used for scheduling | |
341 | Data Element | /MRSS/T_RM_WEMNG | Quantity of Goods Received | |
342 | Data Element | /MRSS/T_RM_WERKS_D | plant | |
343 | Data Element | /MRSS/T_RM_WERKS_I | Actual plant | |
344 | Data Element | /MRSS/T_RM_WKURS | Exchange Rate | |
345 | Data Element | /MRSS/T_RM_WTRZE | Unit of measure for queue time | |
346 | Data Element | /MRSS/T_RM_XCHAR | Batch management indicator (internal) | |
347 | Data Element | /MRSS/T_RM_XMNGA | Total scrap quantity confirmed | |
348 | Data Element | /MRSS/T_RM_X_KUM_PER | Cumulative Scrap Qty of Subsequent Reporting Pts (Cur. Per.) | |
349 | Data Element | ABLAD | Unloading Point | |
350 | Data Element | AENNR | Change Number | |
351 | Data Element | AFNAM | Name of requisitioner/requester | |
352 | Data Element | ANZKAP | Number of capacities required | |
353 | Data Element | APROZENT | Work percentage | |
354 | Data Element | ARBEIT | Work involved in the activity | |
355 | Data Element | ARBEITE | Unit for work | |
356 | Data Element | AUFKALSM | Costing Sheet | |
357 | Data Element | AUFNR | Order Number | |
358 | Data Element | AUFZSCHL | Overhead key | |
359 | Data Element | BEAZE | Unit of measure for processing time | |
360 | Data Element | BEDNR | Requirement Tracking Number | |
361 | Data Element | BSTME | Order unit | |
362 | Data Element | BUKRS | Company Code | |
363 | Data Element | CHAR1 | Single-Character Flag | |
364 | Data Element | CHAR1 | Single-Character Flag | |
365 | Data Element | CHAR10 | Character Field Length = 10 | |
366 | Data Element | CHAR10 | Character Field Length = 10 | |
367 | Data Element | CHAR19 | 19 Characters | |
368 | Data Element | CHAR19 | 19 Characters | |
369 | Data Element | CHAR3 | 3-Byte field | |
370 | Data Element | CHAR32 | Character field, length 32 | |
371 | Data Element | CIM_COUNT | Internal counter | |
372 | Data Element | CIM_COUNT | Internal counter | |
373 | Data Element | CLASF | Ind.: Take Activity Into Account for Project Summarization | |
374 | Data Element | CO_ISMNGEH | Unit of measure for the activity to be confirmed | |
375 | Data Element | CO_ISMNGEH | Unit of measure for the activity to be confirmed | |
376 | Data Element | CO_ISMNGEH | Unit of measure for the activity to be confirmed | |
377 | Data Element | CO_ISMNGEH | Unit of measure for the activity to be confirmed | |
378 | Data Element | CO_ISMNGEH | Unit of measure for the activity to be confirmed | |
379 | Data Element | CO_ISMNGEH | Unit of measure for the activity to be confirmed | |
380 | Data Element | CO_ISMNW | Actual work | |
381 | Data Element | CO_PEDD | Forecast finish date of operation from confirmation | |
382 | Data Element | CO_RMZHL | Confirmation counter | |
383 | Data Element | CO_RUECK | Completion confirmation number for the operation | |
384 | Data Element | CR_VERTN | Distr.cap.reqmts (plant maint.,process order, network) | |
385 | Data Element | CUOBJ | Configuration (internal object number) | |
386 | Data Element | DATS | Field of type DATS | |
387 | Data Element | DATS | Field of type DATS | |
388 | Data Element | DATS | Field of type DATS | |
389 | Data Element | DATS | Field of type DATS | |
390 | Data Element | DAUDEHN | Indicator: flexible duration | |
391 | Data Element | DAUMIN | Minimum activity duration | |
392 | Data Element | DAUMINE | Unit for the minimum duration | |
393 | Data Element | DAUNOR | Normal duration of the activity | |
394 | Data Element | DAUNORE | Normal duration/unit | |
395 | Data Element | EBELN | Purchasing Document Number | |
396 | Data Element | EBELP | Item Number of Purchasing Document | |
397 | Data Element | EINSCHRA | Constraint on the basic start date for the activity | |
398 | Data Element | EINSCHRE | Constraint on the finish date of the activity | |
399 | Data Element | EKORG | Purchasing organization | |
400 | Data Element | ESOKZ | Purchasing info record category | |
401 | Data Element | EWDAM | Minimum duration (from forecast) for activity | |
402 | Data Element | EWDAN | Normal duration (from forecast) of activity | |
403 | Data Element | EWDME | Unit for forecast minimum duration | |
404 | Data Element | EWDNE | Unit for forecast normal duration | |
405 | Data Element | EWENDED | Forecast finish date | |
406 | Data Element | EWENDEZ | Forecast finish time for the activity | |
407 | Data Element | EWSTARTD | Forecasted start date for the activity | |
408 | Data Element | EWSTARTZ | Forecast start time of the activity | |
409 | Data Element | FKBER | Functional Area | |
410 | Data Element | FPAVD | Earliest scheduled start date (forecast) | |
411 | Data Element | FPAVZ | Earliest scheduled start time (forecast) | |
412 | Data Element | FPEDD | Earliest scheduled finish date (forecast) | |
413 | Data Element | FPEDZ | Earliest scheduled finish time (forecast) | |
414 | Data Element | FPLNR | Billing plan number / invoicing plan number | |
415 | Data Element | FSAVD | Earliest scheduled start: Execution (date) | |
416 | Data Element | FSAVZ | Earliest scheduled start: Execution (time) | |
417 | Data Element | FSEDZ | Earliest scheduled finish: Execution (time) | |
418 | Data Element | GSBER | Business Area | |
419 | Data Element | INFNR | Number of purchasing info record | |
420 | Data Element | JV_NAME | Joint venture | |
421 | Data Element | JV_RECIND | Recovery Indicator | |
422 | Data Element | J_OBJNR | Object number | |
423 | Data Element | KNOBJ | Number of Object with Assigned Dependencies | |
424 | Data Element | KNTTP | Account assignment category | |
425 | Data Element | KONNR | Number of principal purchase agreement | |
426 | Data Element | KSTAR | Cost Element | |
427 | Data Element | KTPNR | Item number of principal purchase agreement | |
428 | Data Element | LIFNR | Account Number of Vendor or Creditor | |
429 | Data Element | LIFNR | Account Number of Vendor or Creditor | |
430 | Data Element | LOHNART | Wage type | |
431 | Data Element | LSTAR | Activity Type | |
432 | Data Element | LSTAR | Activity Type | |
433 | Data Element | LSTAR | Activity Type | |
434 | Data Element | LSTAR | Activity Type | |
435 | Data Element | LSTAR | Activity Type | |
436 | Data Element | LSTAR | Activity Type | |
437 | Data Element | LSTAR | Activity Type | |
438 | Data Element | MANDT | Client | |
439 | Data Element | MATKL | Material Group | |
440 | Data Element | MEINS | Base Unit of Measure | |
441 | Data Element | MEINS | Base Unit of Measure | |
442 | Data Element | MILESTONE | Usage | |
443 | Data Element | NW_PRIO | Priority | |
444 | Data Element | OBJEKTID | Object ID | |
445 | Data Element | OFMNW | Forecasted work (actual + remaining) | |
446 | Data Element | OTYPE | Object Type | |
447 | Data Element | PACKNO | Package number | |
448 | Data Element | PDAE | Unit of the forecasted duration from the confirmation | |
449 | Data Element | PDAU | Forecasted duration of activity from confirmation | |
450 | Data Element | PEINH | Price unit | |
451 | Data Element | PERNR_D | Personnel Number | |
452 | Data Element | PERNR_D | Personnel Number | |
453 | Data Element | PERNR_D | Personnel Number | |
454 | Data Element | PLNFOLGE | Sequence | |
455 | Data Element | PPUFF_FREI | Free float (from forecast) | |
456 | Data Element | PPUFF_GESM | Total float (from forecast) | |
457 | Data Element | PRCTR | Profit Center | |
458 | Data Element | PREIS | Price | |
459 | Data Element | PRKST | Costs in the activity | |
460 | Data Element | PS_PSP_ELE | Work breakdown structure element (WBS element) | |
461 | Data Element | PS_RESTA | Forecast date constraint on activity start | |
462 | Data Element | PS_RESTE | Forecast date constraint on activity finish | |
463 | Data Element | PUFFR_FREI | Free float | |
464 | Data Element | PUFFR_GESM | Total float | |
465 | Data Element | REGIO | Region (State, Province, County) | |
466 | Data Element | SELKZ | Selection flag | |
467 | Data Element | SLWID | Key word ID for user-defined fields | |
468 | Data Element | SPAVD | Latest scheduled start date (forecast) | |
469 | Data Element | SPAVZ | Latest scheduled start time (forecast) | |
470 | Data Element | SPEDD | Latest scheduled finish date (forecast) | |
471 | Data Element | SPEDZ | Latest scheduled finish time (forecast) | |
472 | Data Element | SPRAS | Language Key | |
473 | Data Element | SSAVD | Latest scheduled start: Execution (date) | |
474 | Data Element | SSAVZ | Latest scheduled start: Execution (time) | |
475 | Data Element | SSEDD | Latest scheduled finish: Execution (date) | |
476 | Data Element | SSEDZ | Latest scheduled finish: Execution (time) | |
477 | Data Element | TECHS | Parameter Variant/Standard Variant | |
478 | Data Element | TIMS | Field of type TIMS | |
479 | Data Element | TIMS | Field of type TIMS | |
480 | Data Element | TIMS | Field of type TIMS | |
481 | Data Element | TIMS | Field of type TIMS | |
482 | Data Element | TXJCD | Tax Jurisdiction | |
483 | Data Element | TZNTSTMPLL | Time Stamp - Long Format | |
484 | Data Element | TZNTSTMPLL | Time Stamp - Long Format | |
485 | Data Element | USRCHAR10 | User field with 10 characters | |
486 | Data Element | USRCHAR10 | User field with 10 characters | |
487 | Data Element | USRCHAR20 | User field with 20 characters | |
488 | Data Element | USRCHAR20 | User field with 20 characters | |
489 | Data Element | USRCUKY | User field: Unit for value fields | |
490 | Data Element | USRCUKY | User field: Unit for value fields | |
491 | Data Element | USRCURR13 | User-defined field for values (length 10,3) | |
492 | Data Element | USRCURR13 | User-defined field for values (length 10,3) | |
493 | Data Element | USRDATE | User field for date | |
494 | Data Element | USRDATE | User field for date | |
495 | Data Element | USRFLAG | User-defined field: Indicator for reports | |
496 | Data Element | USRFLAG | User-defined field: Indicator for reports | |
497 | Data Element | USRQUAN13 | User field for quantity (length 10.3) | |
498 | Data Element | USRQUAN13 | User field for quantity (length 10.3) | |
499 | Data Element | USRUNIT | User field: Unit for quantity fields | |
500 | Data Element | USRUNIT | User field: Unit for quantity fields |