SAP ABAP Data Element /MRSS/T_RM_UEMUSKZ (Required overlapping)
Hierarchy
☛
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
⤷
PM-WOC-CP (Application Component) Capacity and Resource Planning
⤷
/MRSS/RMI_NW (Package) RM Integration Layer

⤷

⤷

Basic Data
Data Element | /MRSS/T_RM_UEMUSKZ |
Short Description | Required overlapping |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | CHAR1 | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | REQUIRED_OVERLAPPING | |
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | ReqOverlap |
Medium | 15 | Req.overlapping |
Long | 20 | Required overlapping |
Heading | 10 | ReqOverlap |
Documentation
Definition
Specifies required overlapping between the operation and the following operation.
Dependencies
- Conditions for Overlaps/>
During scheduling the system determines from the minimum send-ahead quantity and the minimum overlap time.
- Whether the operations can overlap
- An overlap is only permissible, if the time the operations overlap is larger than the minimum overlap time.
- When is the start date of the following operation
- If operations overlap, the next operation can start when the minimum send-ahead quantity has been produced. If a move is necessary, this is taken into account with the minimum move time.
- The following operation is scheduled so that no interruptions occur.
- Additional Condition for Overlaps in Collective Orders
If you specify overlps for the last operation of an order, which is part of a collective order this operation can overlap with its successor in the superior order. The prerequisite for this is that there is no difference between the requirements date of the directly produced component and the basic finish date of the subordinate order.
History
Last changed by/on | SAP | 20141109 |
SAP Release Created in | 700 |