Hierarchy

⤷

⤷

Basic Data
Data Element | /MRSS/T_RM_QPPKTABS |
Short Description | Flow Variants for Inspection Point Completion |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | CHAR1 | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | IPt comp. |
Medium | 15 | InspPtComplete |
Long | 20 | Insp.pointCompletion |
Heading | 7 | IPtComp |
Documentation
Use
You can select one of the following variants for completing the inspection point from this list field:
Variant 1: Quantity, valuation, and confirmation (production)
The value assignment screen for the inspection point is called once all of the inspection characteristics have been completed and you have left the characteristic overview automatically or manually by pressing the function key.
You must assign a quantity and a valuation to the inspection point.
Depending on the control key of the operation, a confirmation indicator (partial or final confirmation, or "no confirmation" for the order) is proposed.
Variant 2: Quantity, valuation (production)
The value assignment screen for the inspection point is called automatically once the inspection characteristics are processed, or manually when you press the function key.
You must assign a quantity and a valuation to the inspection point.
The confirmation indicator is set to "No Confirmation". You can, however, still activate the confirmation if the control key permits you to do so.
Variant 3: Valuation
The value assignment screen for the inspection point is called automatically once the inspection characteristics are processed, or manually when you press the function key.
You only have to assign a valuation to the inspection point.
Variant 4: Automatic valuation based on insp. point definition
The value assignment screen for the inspection point is not called when the inspection characteristics are completed.
The inspection point is valuated automatically using the inspection
point definition:
- If all inspection characteristics are accepted, the valuation code for acceptance is used.
- If one or more inspection characteristics are rejected, the valuation code for rejection is used.
Note
The value assignment screen if still called if you:
- Have defined a partial-lot assignment in the task list header
- Press the function key
Procedure
Assign variants to the checks accordingly:
Variants 1 to 4
- For the inspection during production. Variants 2 and 3 also allow you to call the confirmation transaction.
Variants 3 or 4
- For maintenance orders. You can also call the confirmation transaction from the value assignment screen.
- For sample processing. In this case, no confirmation is required.
Examples
Dependencies
History
Last changed by/on | SAP | 20141109 |
SAP Release Created in | 700 |