SAP ABAP Data Element /MRSS/T_RM_CP_OOFFSTE (Offset to sub-operation finish)
Hierarchy
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
   PM-WOC-CP (Application Component) Capacity and Resource Planning
     /MRSS/RMI_NW (Package) RM Integration Layer
Basic Data
Data Element /MRSS/T_RM_CP_OOFFSTE
Short Description Offset to sub-operation finish  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type DAUER_4_1    
Data Type QUAN   Quantity field, points to a unit field with format UNIT 
Length 5    
Decimal Places 1    
Output Length 7    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name OFFSET_END   
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Offset 
Medium 15 Offset 
Long 20 Offset to finish 
Heading 13 Offset 
Documentation

Definition

Offset between the end of the suboperation and the corresponding reference date

History
Last changed by/on SAP  20141109 
SAP Release Created in 700