SAP ABAP Data Element /MRSS/T_RM_QKZTLSBEST (Operation with Stock-Related Partial Lot Assignment)
Hierarchy
☛
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
⤷ PM-WOC-CP (Application Component) Capacity and Resource Planning
⤷ /MRSS/RMI_NW (Package) RM Integration Layer
⤷ PM-WOC-CP (Application Component) Capacity and Resource Planning
⤷ /MRSS/RMI_NW (Package) RM Integration Layer
Basic Data
Data Element | /MRSS/T_RM_QKZTLSBEST |
Short Description | Operation with Stock-Related Partial Lot Assignment |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | CHAR1 | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Last p.lot |
Medium | 15 | Last part. lot |
Long | 20 | Last p. lot assign. |
Heading | 3 | LPL |
Documentation
Procedure
Select this indicator for the operation that is to have the last inspection during production and, therefore, the last assignments to partial lots
Dependencies
Proposals for quantities posted to warehouse stock are possible only for operations for which this indicator is selected.
History
Last changed by/on | SAP | 20141109 |
SAP Release Created in | 700 |