SAP ABAP Data Element /MRSS/T_RM_NO_DISP_PLUS (Effective for Materials Planning)
Hierarchy
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
   PM-WOC-CP (Application Component) Capacity and Resource Planning
     /MRSS/RMI_NW (Package) RM Integration Layer
Basic Data
Data Element /MRSS/T_RM_NO_DISP_PLUS
Short Description Effective for Materials Planning  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type CHAR1    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Eff.MatPlg 
Medium 15 Eff. mat. plng 
Long 20 Effec. mat. planning 
Heading 10 Eff.MatPlg 
Documentation

Definition

Relevance of components for resource planning.

The following values are possible:

1 = Not relevant for resource planning

The component reservation is not relevant for resource planning even when the order is released. The system does not create a purchase requisition for the components.

X = Relevant for resource planning later

The component reservation is relevant for resource planning by the time that the order is released. If the component is external, the system also creates a purchase requisition for it.

<blank> = Relevant for resource planning immediately

The component reservation is relevant for resource planning immediately. The system creates a purchase requisition straight away if the component is external.

History
Last changed by/on SAP  20141109 
SAP Release Created in 700