Data Element list used by SAP ABAP Table IOHEADER (Database structure for order headers and items)
SAP ABAP Table IOHEADER (Database structure for order headers and items) is using
# | Object Type | Object Name | Object Description | Note |
---|---|---|---|---|
1 | Data Element | /CUM/AUEST | CU: Automatic Copy of Estimated Costs | |
2 | Data Element | /CUM/CMNUM | CU: Construction Measure Number | |
3 | Data Element | /CUM/DESGUID | CU: GUID of Design Document | |
4 | Data Element | /CUM/DESNUM | CU: Design Number | |
5 | Data Element | /CUM/INDCU | CU: Order is Used for Compatible Units | |
6 | Data Element | /CUM/INTCUNR | CU: Internal CU Number in a Work Order | |
7 | Data Element | ABGR_SCHL | Results Analysis Key | |
8 | Data Element | AD_ADDRNUM | Address number | |
9 | Data Element | AENNR | Change Number | |
10 | Data Element | AENNR | Change Number | |
11 | Data Element | AENNR | Change Number | |
12 | Data Element | AM_UMWKZ | Reason for environmental investment | |
13 | Data Element | ATRKZ | Request ID | |
14 | Data Element | AUDISP | Ind: Reservation applicable to MRP;Purc. req. is created | |
15 | Data Element | AUFABKRS | Processing group | |
16 | Data Element | AUFAEDAT | Change date for Order Master | |
17 | Data Element | AUFAENAM | Last changed by | |
18 | Data Element | AUFART | Order Type | |
19 | Data Element | AUFERFDAT | Created on | |
20 | Data Element | AUFERFNAM | Entered by | |
21 | Data Element | AUFIDAT2 | Technical completion date | |
22 | Data Element | AUFKALSM | Costing Sheet | |
23 | Data Element | AUFKOSTV | Responsible cost center | |
24 | Data Element | AUFKSTAR | Settlement cost element | |
25 | Data Element | AUFLOEKZ | Deletion flag | |
26 | Data Element | AUFLTEXT | Long Text Exists | |
27 | Data Element | AUFNR | Order Number | |
28 | Data Element | AUFREFNR | Reference order number | |
29 | Data Element | AUFSOWRK | Location plant | |
30 | Data Element | AUFSTKZ | Identifier for statistical order | |
31 | Data Element | AUFTEXT | Description | |
32 | Data Element | AUFTYP | Order category | |
33 | Data Element | AUFUSER4 | Estimated total costs of order | |
34 | Data Element | AUFWAERS | Order Currency | |
35 | Data Element | AUFZSCHL | Overhead key | |
36 | Data Element | AWSLS | Variance Key | |
37 | Data Element | BALIMSGTY | Application Log: Message Type Visualization | |
38 | Data Element | BALPROBCLH | Application Log: Log problem class | |
39 | Data Element | BASMN | Base quantity | |
40 | Data Element | BASMN | Base quantity | |
41 | Data Element | BASMN | Base quantity | |
42 | Data Element | BEDID | ID of the capacity requirements record | |
43 | Data Element | BEDID | ID of the capacity requirements record | |
44 | Data Element | BEDID | ID of the capacity requirements record | |
45 | Data Element | BEMOT | Accounting Indicator | |
46 | Data Element | BERID | MRP Area | |
47 | Data Element | BKTXT | Document Header Text | |
48 | Data Element | BLDAT | Document Date in Document | |
49 | Data Element | BREAKS | Indicator: Scheduling allowing for breaks | |
50 | Data Element | BSDIF | Difference betw. rqmts. date and order date in fact.cal.days | |
51 | Data Element | BUDAT | Posting Date in the Document | |
52 | Data Element | BUKRS | Company Code | |
53 | Data Element | CCKEY | Cost collector key | |
54 | Data Element | CCOBJID | Object ID | |
55 | Data Element | CC_CONF_KEY | Identical object | |
56 | Data Element | CFB_ADTDAYS | Additional Days | |
57 | Data Element | CFB_BBD_PPPI | Best-Before Date (BBD)/ Shelf Life Expiration Date (SLED) | |
58 | Data Element | CFB_DATOFM | Date of Manufacture | |
59 | Data Element | CHAR1 | Single-Character Flag | |
60 | Data Element | CHARG_D | Batch Number | |
61 | Data Element | CIM_COUNT | Internal counter | |
62 | Data Element | CIM_COUNT | Internal counter | |
63 | Data Element | CIM_COUNT | Internal counter | |
64 | Data Element | CKML_F_PROCNR | Production Process | |
65 | Data Element | CKML_PROZESS_TYP | Process Category (Procurement/Consumption) | |
66 | Data Element | CK_LOSGR | Costing lot size | |
67 | Data Element | CN_COSTUPD | Costs are updated | |
68 | Data Element | COIS_ICON_ORDER_KIND | Order Icon | |
69 | Data Element | COMP_CALC | Indicator: Components will not be costed | |
70 | Data Element | COWB_CONF_TYPE_TEXT | Short Text for Confirmation Type | |
71 | Data Element | COWB_SCRAP_TYPE_TEXT | Short Text for Scrap Type | |
72 | Data Element | CO_ABARB | Confirmation: Degree of processing | |
73 | Data Element | CO_AGRND | Reason for Variance | |
74 | Data Element | CO_APLZL | General counter for order | |
75 | Data Element | CO_APRIO | Order priority | |
76 | Data Element | CO_APROZ | Scrap percentage | |
77 | Data Element | CO_APROZ | Scrap percentage | |
78 | Data Element | CO_ASTEX | User status active | |
79 | Data Element | CO_ASTTX | Field displaying user status | |
80 | Data Element | CO_AUFLD | Date of BOM Explosion/Routing Transfer | |
81 | Data Element | CO_AUFPL | Routing number of operations in the order | |
82 | Data Element | CO_AUFPL | Routing number of operations in the order | |
83 | Data Element | CO_AUFPL | Routing number of operations in the order | |
84 | Data Element | CO_BSFAK | Confirmation factor confirmed qty. for order quantity | |
85 | Data Element | CO_CHG_TIME | Changed at | |
86 | Data Element | CO_COLORDPRC | Collective order with/without automatic goods movement | |
87 | Data Element | CO_DISPO | MRP controller for the order | |
88 | Data Element | CO_FTRMI | Actual release date | |
89 | Data Element | CO_FTRMP | Planned release date | |
90 | Data Element | CO_FTRMS | Scheduled release date | |
91 | Data Element | CO_FTRPS | Scheduled release date (forecast) | |
92 | Data Element | CO_GETRI | Confirmed Order Finish Date | |
93 | Data Element | CO_GEUZI | Confirmed order finish (time) | |
94 | Data Element | CO_GIAMG | Expected variance from planned qty to be delivered to stock | |
95 | Data Element | CO_GLTPP | Finish date (forecast) | |
96 | Data Element | CO_GLTPS | Scheduled forecast finish | |
97 | Data Element | CO_GLTRI | Actual finish date | |
98 | Data Element | CO_GLTRP | Basic finish date | |
99 | Data Element | CO_GLTRS | Scheduled finish | |
100 | Data Element | CO_GLUPP | Forecast finish (time) | |
101 | Data Element | CO_GLUPS | Scheduled forecast finish time | |
102 | Data Element | CO_GLUZP | Basic finish (time) | |
103 | Data Element | CO_GLUZS | Scheduled finish time | |
104 | Data Element | CO_GMEIN | Common unit of measure for all order items | |
105 | Data Element | CO_GRDTX | Text describing the reason for a variance in a confirmation | |
106 | Data Element | CO_GSBTR | Overall commitment date | |
107 | Data Element | CO_GSTPP | Forecast start date | |
108 | Data Element | CO_GSTPS | Scheduled forecast start | |
109 | Data Element | CO_GSTRI | Actual start date | |
110 | Data Element | CO_GSTRP | Basic start date | |
111 | Data Element | CO_GSTRS | Scheduled start | |
112 | Data Element | CO_GSUPP | Forecast start (time) | |
113 | Data Element | CO_GSUPS | Scheduled start time (Forecast) | |
114 | Data Element | CO_GSUZI | Actual start time | |
115 | Data Element | CO_GSUZP | Basic start time | |
116 | Data Element | CO_GSUZS | Scheduled Start (Time) | |
117 | Data Element | CO_GWEMG | Delivered quantity | |
118 | Data Element | CO_IASMG | Scrap confirmed for order | |
119 | Data Element | CO_IGMNG | Yield confirmed from order confirmation | |
120 | Data Element | CO_KSTEMPF | Indicator: Direct cost collector | |
121 | Data Element | CO_LAUFNR | Leading order in current processing | |
122 | Data Element | CO_LKNOT | Left node in collective order | |
123 | Data Element | CO_MATNR | Material Number for Order | |
124 | Data Element | CO_MATXT | Material description | |
125 | Data Element | CO_MBAUGR | Superior assembly | |
126 | Data Element | CO_MES_INT_ROUTINGID | Key of a Routing from an ME System | |
127 | Data Element | CO_MES_MAX_GAMNG | Maximum Value of Total Order Quantity After Distribution | |
128 | Data Element | CO_MIMEZ | Expected yield variance | |
129 | Data Element | CO_MLTPS | Order with multiple items | |
130 | Data Element | CO_M_VERF | Message Category in Availability Log | |
131 | Data Element | CO_NAUCOST | Indicator: Do not cost automatically | |
132 | Data Element | CO_NAUTERM | Indicator: Do not schedule automatically | |
133 | Data Element | CO_NOPCOST | Do not calculate planned costs for order | |
134 | Data Element | CO_PENDD | Outline finish of collective order (date) | |
135 | Data Element | CO_PENDT | Outline finish time | |
136 | Data Element | CO_PLAUF | Date for routing transfer | |
137 | Data Element | CO_POSNR | Order item number | |
138 | Data Element | CO_PRODNET | Indicator: Order is part of collective order | |
139 | Data Element | CO_PRODPRF | Production Scheduling Profile | |
140 | Data Element | CO_PSTARTD | Outline start of collective network (date) | |
141 | Data Element | CO_PSTARTT | Start time of a collective order | |
142 | Data Element | CO_RKNOT | Right node of a collective order | |
143 | Data Element | CO_RUECK | Completion confirmation number for the operation | |
144 | Data Element | CO_STTXT | System Status | |
145 | Data Element | CO_TEILNET | Number of superior network | |
146 | Data Element | CO_UPTER | Indicator: Change to Scheduled Dates | |
147 | Data Element | CO_VFMNG | Committed quantity for order acc. to ATP check components | |
148 | Data Element | CREA_APL | Application code, where the order/network was created | |
149 | Data Element | CR_OBJID | Object ID of the resource | |
150 | Data Element | CR_OBJID | Object ID of the resource | |
151 | Data Element | CR_OBJTY | Object types of the CIM resource | |
152 | Data Element | CR_OBJTY | Object types of the CIM resource | |
153 | Data Element | CSPLIT | Apportionment structure | |
154 | Data Element | CUOBJ | Configuration (internal object number) | |
155 | Data Element | CY_SEQNR | Seq. number order | |
156 | Data Element | C_TIME | Time created | |
157 | Data Element | DATUV | Valid-From Date | |
158 | Data Element | DATUV | Valid-From Date | |
159 | Data Element | DZKRIZ | Counter for additional criteria | |
160 | Data Element | FEVOR | Production Supervisor | |
161 | Data Element | FHORI | Scheduling Margin Key for Floats | |
162 | Data Element | FKBER | Functional Area | |
163 | Data Element | FLG_AOB | Indicator: relationships | |
164 | Data Element | FLG_ARBEI | Indicator: Default value work is relevant | |
165 | Data Element | FREIZ | Release period (in days) | |
166 | Data Element | GAMNG | Total order quantity | |
167 | Data Element | GASMG | Total scrap quantity in the order | |
168 | Data Element | GSBER | Business Area | |
169 | Data Element | HISTU | Level (in Multi-Level BOM Explosions) | |
170 | Data Element | IM_ABUKRS | Requesting company code | |
171 | Data Element | IM_PROFIL | Investment measure profile | |
172 | Data Element | IM_SIZECL | Scale of investment objects | |
173 | Data Element | IWERK | Maintenance Planning Plant | |
174 | Data Element | IZWEK | Reason for investment | |
175 | Data Element | JV_ETYPE | Equity type | |
176 | Data Element | JV_JIBCL | JIB/JIBE Class | |
177 | Data Element | JV_JIBSA | JIB/JIBE Subclass A | |
178 | Data Element | JV_NAME | Joint venture | |
179 | Data Element | JV_OR_CO | JV original cost object | |
180 | Data Element | JV_OTYPE | Joint Venture Object Type | |
181 | Data Element | JV_RECIND | Recovery Indicator | |
182 | Data Element | J_OBJNR | Object number | |
183 | Data Element | J_STSMA | Status Profile | |
184 | Data Element | KALKVARIST | Costing variant for actual costs | |
185 | Data Element | KALKVARPLN | Costing variant for planned costs | |
186 | Data Element | KALSMA_CH | Search procedure for batch determination | |
187 | Data Element | KALSN | Calendar Selection for Order | |
188 | Data Element | KAPPL | Application | |
189 | Data Element | KAPVERSA | Version of Available Capacity | |
190 | Data Element | KBED_D | Ind: do not create capacity requirements | |
191 | Data Element | KDAUF | Sales Order Number | |
192 | Data Element | KDPOS | Item number in Sales Order | |
193 | Data Element | KOKRS | Controlling Area | |
194 | Data Element | KVEWE | Usage of the Condition Table | |
195 | Data Element | KZAVC | Indicator for type of availability check | |
196 | Data Element | K_SALDO | Order balance in controlling-area currency | |
197 | Data Element | LGORT_D | Storage location | |
198 | Data Element | LOSBS | To Lot Size | |
199 | Data Element | LOSDIV | Lot size divisor | |
200 | Data Element | LOSGRBIS | To lot size | |
201 | Data Element | LOSGRVON | From Lot Size | |
202 | Data Element | LOSVN | From Lot Size | |
203 | Data Element | LTXTSP | Long Text Language | |
204 | Data Element | LZEIH | Unit for maximum storage period | |
205 | Data Element | MANDT | Client | |
206 | Data Element | MATNR | Material Number | |
207 | Data Element | MATNR | Material Number | |
208 | Data Element | MAUFNR | Number of superior order | |
209 | Data Element | MAXLZ | Maximum storage period | |
210 | Data Element | MDV01 | Production line | |
211 | Data Element | MDV02 | Planning identification 2 | |
212 | Data Element | MEINS | Base Unit of Measure | |
213 | Data Element | MEINS | Base Unit of Measure | |
214 | Data Element | NETZKONT | Indicator for the account assignment of a network(hdr/act.) | |
215 | Data Element | NO_DISP_PLUS | Effective for Materials Planning | |
216 | Data Element | OBJEKTID | Object ID | |
217 | Data Element | OBJEKT_ID | ID/Object key | |
218 | Data Element | OCM_CH_PROC | Process that has lead to the change of an object | |
219 | Data Element | OCM_COMP_RES | OCM: Result of comparison of two order objects | |
220 | Data Element | OCM_OBJ_TYPE | Change indicator | |
221 | Data Element | O_SALDO | Order balance in order currency | |
222 | Data Element | PERTR | Planned opening date in planned order | |
223 | Data Element | PKOSA_D | Cost collector for production process PROCNR | |
224 | Data Element | PLAFX | Firming indicator for planned order data | |
225 | Data Element | PLGKZ | Identifier for planning with line items | |
226 | Data Element | PLNAL | Group Counter | |
227 | Data Element | PLNAW | Application of the task list | |
228 | Data Element | PLNME | Task list unit of measure | |
229 | Data Element | PLNNR | Key for Task List Group | |
230 | Data Element | PLNTY | Task List Type | |
231 | Data Element | PLN_VERWE | Task list usage | |
232 | Data Element | PLWRK | Planning Plant | |
233 | Data Element | POSNR | Item number of the SD document | |
234 | Data Element | POSNR | Item number of the SD document | |
235 | Data Element | PRCTR | Profit Center | |
236 | Data Element | PROFIDNZPL | Network profile | |
237 | Data Element | PS_AKSTL | Requesting cost center | |
238 | Data Element | PS_KZERB | Indicator: Project summarization | |
239 | Data Element | PS_PLART | Basis for scheduling | |
240 | Data Element | PS_POSID | Work Breakdown Structure Element (WBS Element) | |
241 | Data Element | PS_PSP_PNR | Work Breakdown Structure Element (WBS Element) | |
242 | Data Element | PS_PSP_PNR | Work Breakdown Structure Element (WBS Element) | |
243 | Data Element | PS_PSP_PRO | Project definition | |
244 | Data Element | QPLOS | Inspection Lot Number | |
245 | Data Element | QPROZENT | Unit for the Rate (Percent) | |
246 | Data Element | RC_VERF | Result of availability check | |
247 | Data Element | REDKZ | Reduction indicator for scheduling | |
248 | Data Element | REDKZP | Reduction indicator for scheduling (forecast) | |
249 | Data Element | REVLV | Revision level | |
250 | Data Element | RGEKZ | Indicator: Backflush | |
251 | Data Element | RMNGA | Total confirmed rework quantity | |
252 | Data Element | RSNUM | Number of reservation/dependent requirements | |
253 | Data Element | RSNUM | Number of reservation/dependent requirements | |
254 | Data Element | RSORD | Refurbishment order indicator (PM) | |
255 | Data Element | RU_LMNGA | Yield currently to be confirmed | |
256 | Data Element | RU_RMNGA | Current rework quantity to be confirmed | |
257 | Data Element | RU_VORME | Confirmation unit of measure | |
258 | Data Element | RU_XMNGA | Scrap currently to be confirmed | |
259 | Data Element | SA_AUFNR | Run schedule header number | |
260 | Data Element | SA_CHARG | Receiving batch for repetitive manufacturing | |
261 | Data Element | SA_ERFME | Unit of measure for backflush quantity and for actual scrap | |
262 | Data Element | SA_ERFMG | Backflush quantity in repetitive manufacturing | |
263 | Data Element | SA_GRUND | Reason for scrap | |
264 | Data Element | SA_MNG04 | Scrap quantity | |
265 | Data Element | SA_ZPUNKT | Reporting Point | |
266 | Data Element | SCOPE_CV | Object Class | |
267 | Data Element | SICHZ | Float after production (in days) | |
268 | Data Element | SICHZ_TRM | Scheduled float after production in days | |
269 | Data Element | SOBKZ | Special Stock Indicator | |
270 | Data Element | SPLIT_STAT | Status of an order in a split hierarchy | |
271 | Data Element | STALT | Alternative BOM | |
272 | Data Element | STLAN | BOM Usage | |
273 | Data Element | STLST | BOM Statuses | |
274 | Data Element | STLTY | BOM Category | |
275 | Data Element | STNUM | Bill of Material | |
276 | Data Element | SYSUUID_X | UUID in X form (binary) | |
277 | Data Element | TABIX_D | Field defined as in SY-TABIX | |
278 | Data Element | TERHW | Scheduling note from order scheduling | |
279 | Data Element | TERMKZ | Scheduling type | |
280 | Data Element | TERMKZP | Scheduling type (forecast) | |
281 | Data Element | TEXT40 | Text, 40 Characters Long | |
282 | Data Element | TRMDT | Date of the last scheduling | |
283 | Data Element | TXJCD | Tax Jurisdiction | |
284 | Data Element | TYPKZ | Type of object causing the load (order category) | |
285 | Data Element | VAGRP | Responsible planner group/department | |
286 | Data Element | VBELN | Sales and Distribution Document Number | |
287 | Data Element | VERID | Production Version | |
288 | Data Element | VORGZ | Float before production (in days) | |
289 | Data Element | VORGZ_TRM | Scheduled float before production in days | |
290 | Data Element | VSNMR_V | Sales document version number | |
291 | Data Element | WEGXX | Path (for Multi-Level BOM Explosions) | |
292 | Data Element | WEGXX | Path (for Multi-Level BOM Explosions) | |
293 | Data Element | WERKS_D | Plant | |
294 | Data Element | WFCID | Factory Calendar |