SAP ABAP Data Element PERTR (Planned opening date in planned order)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷
CRM (Application Component) Customer Relationship Management
⤷
CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷
MD03 (Package) Appl. development R/3 MPS/determin. requirements planning

⤷

⤷

⤷

Basic Data
Data Element | PERTR |
Short Description | Planned opening date in planned order |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | DATUM | |
Data Type | DATS | Date field (YYYYMMDD) stored as char(8) |
Length | 8 | |
Decimal Places | 0 | |
Output Length | 10 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ORDER_OPEN_DATE | |
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Plnd open. |
Medium | 15 | Planned opening |
Long | 20 | Planned opening date |
Heading | 8 | Pln open |
Documentation
Definition
Date that the planned order will be opened.
Supplementary Documentation - PERTR 0001
Use
Procedure
Examples
Dependencies
Note
If a start date which lies in the past is calculated during backward scheduling, then the system switches to forward scheduling and sets the current date as the start date.
In this case, no opening date is specified. Instead, the start date in the past which was calculated during the original backward scheduling calculation is displayed for information purposes.
History
Last changed by/on | SAP | 19981111 |
SAP Release Created in |