SAP ABAP Table PSIS_GEN_PLAF (Generated structure for LDB PSJ. Do not modify manually.)
Hierarchy
SAP_APPL (Software Component) Logistics and Accounting
   PS-IS (Application Component) Information System
     CNIS (Package) Application development R/3 PS information system
Basic Data
Table Category INTTAB    Structure 
Structure PSIS_GEN_PLAF   Table Relationship Diagram
Short Description Generated structure for LDB PSJ. Do not modify manually.    
Delivery and Maintenance
Pool/cluster      
Delivery Class      
Data Browser/Table View Maintenance     Display/Maintenance Allowed with Restrictions 
Components
     
Field Key Data Element Domain Data
Type
Length Decimal
Places
Short Description Check
table
1 PLNUM PLNUM PLNUM CHAR 10   0   Planned order number *
2 PSPEL PS_POSNR PS_POSNR NUMC 8   0   WBS Element *
3 RSNUM RSNUM RSNUM NUMC 10   0   Number of reservation/dependent requirements *
4 BEDID BEDID BEDID NUMC 12   0   ID of the capacity requirements record *
5 MANDT MANDT MANDT CLNT 3   0   Client *
6 MATNR PLMAT MATNR CHAR 18   0   Planning material *
7 PLWRK PLWRK WERKS CHAR 4   0   Planning Plant *
8 PWWRK PWWRK WERKS CHAR 4   0   Production plant in planned order *
9 PAART PAART PAART CHAR 4   0   Order type  
10 BESKZ BESKZ BESKZ CHAR 1   0   Procurement Type  
11 SOBES SOBES SOBES CHAR 1   0   Special procurement type  
12 GSMNG GSMNG MENG13 QUAN 13   3   Total planned order quantity  
13 TLMNG TLMNG MENG13 QUAN 13   3   Partial lot quantity  
14 AVMNG AVMNG MENG13 QUAN 13   3   Fixed quantity of scrap from production  
15 BDMNG BDMNG MENG13 QUAN 13   3   Requirement Quantity  
16 PSTTR PSTTR DATUM DATS 8   0   Order start date in planned order  
17 PEDTR PEDTR DATUM DATS 8   0   Order finish date in the planned order  
18 PERTR PERTR DATUM DATS 8   0   Planned opening date in planned order  
19 WEBAZ PLWEZ DEC3 DEC 3   0   Goods receipt processing time in days  
20 DISPO PLDSP DISPO CHAR 3   0   MRP controller *
21 UMSKZ PLUMS XFELD CHAR 1   0   Conversion indicator for planned order  
22 AUFFX PLAFX XFELD CHAR 1   0   Firming indicator for planned order data  
23 STLFX PLSFX XFELD CHAR 1   0   Fixing indicator for BOM explosion  
24 KNTTP KNTTP KNTTP CHAR 1   0   Account assignment category *
25 KDAUF KDAUF VBELN CHAR 10   0   Sales Order Number *
26 KDPOS KDPOS NUM06 NUMC 6   0   Item number in Sales Order  
27 KDEIN KDEIN NUM04 NUMC 4   0   Delivery schedule for sales order  
28 PROJN PROJN PROJN CHAR 16   0   Old: Project number : No longer used --> PS_POSNR  
29 QUNUM QUNUM QUNUM CHAR 10   0   Number of quota arrangement  
30 QUPOS QUPOS NUM03 NUMC 3   0   Quota arrangement item  
31 FLIEF FLIEF LIFNR CHAR 10   0   Fixed vendor *
32 KONNR KONNR EBELN CHAR 10   0   Number of principal purchase agreement *
33 KTPNR KTPNR EBELP NUMC 5   0   Item number of principal purchase agreement *
34 EKORG EKORG EKORG CHAR 4   0   Purchasing organization *
35 LGORT LGORT_D LGORT CHAR 4   0   Storage location *
36 NUMVR NUMVR NUMVR NUMC 2   0   Version number  
37 KZVBR KZVBR KZVBR CHAR 1   0   Consumption posting  
38 SOBKZ SOBKZ SOBKZ CHAR 1   0   Special Stock Indicator *
39 SERNR SERNR SERNR CHAR 8   0   BOM explosion number *
40 PALTR PALTR DATUM DATS 8   0   Explosion date  
41 TECHS TECHS TECHS CHAR 12   0   Parameter Variant/Standard Variant  
42 STLAN STLAN STLAN CHAR 1   0   BOM Usage *
43 STALT STALT ALTNR CHAR 2   0   Alternative BOM  
44 STSTA STLST STLST NUMC 2   0   BOM Statuses *
45 AENNR AENNR AENNR CHAR 12   0   Change Number *
46 ARSNR ARSNR MDNUM NUMC 10   0   Settlement reservation number  
47 ARSPS ARSPS RSPOS NUMC 4   0   Item number of the settlement reservation  
48 VERTO SA_VERTO SA_VERTL CHAR 4   0   Distribution key for quantity produced *
49 VERID VERID VERID CHAR 4   0   Production Version *
50 AUFNR SA_AUFNR SA_AUFNR CHAR 12   0   Run schedule header number *
51 TRART TRART CHAR1 CHAR 1   0   Scheduling type of the planned order  
52 PLGRP FEVOR FEVOR CHAR 3   0   Production Supervisor *
53 TERST TERST DATUM DATS 8   0   Start date for production  
54 TERED TERED DATUM DATS 8   0   Finish date for production  
55 AUFPL CO_AUFPL AUFPL NUMC 10   0   Routing number of operations in the order  
56 TRMKZ TRMFL XFELD CHAR 1   0   Scheduling indicator  
57 TRMER TRMER TRMER CHAR 2   0   Scheduling error  
58 REDKZ REDKZ REDKZ CHAR 1   0   Reduction indicator for scheduling  
59 TRMHK TRMHK TRMHK CHAR 1   0   Scheduling source  
60 PLNNR PLNNR PLNNR CHAR 8   0   Key for Task List Group  
61 PLNAL PLNAL ALTNR CHAR 2   0   Group Counter  
62 PLNTY PLNTY PLNTY CHAR 1   0   Task List Type *
63 FRTHW FRTHW FRTHW CHAR 1   0   Production note in the planned order  
64 RGEKZ CO_RGEKZ CO_RGEKZ CHAR 1   0   Indicator: Backflushing for order  
65 MEINS MEINS MEINS UNIT 3   0   Base Unit of Measure *
66 CUOBJ CUOBJ CUOBJ NUMC 18   0   Configuration (internal object number)  
67 REVLV REVLV REVLV CHAR 2   0   Revision level  
68 ABMNG ABMNG MENGE QUAN 13   3   Reduced quantity in the planned order  
69 RATID RATID BEDID NUMC 12   0   Index for the results of scheduling production rates *
70 GROID GROID BEDID NUMC 12   0   Index for rough scheduling results *
71 RATER RATER TRMER CHAR 2   0   Scheduling error in scheduling production rates  
72 GROER GROER TRMER CHAR 2   0   Scheduling error in rough scheduling  
73 OBART OBART OBART CHAR 1   0   Object type  
74 PLSCN PLSCN PLSCN NUMC 3   0   Planning Scenario of Long-Term Planning *
75 SBNUM SBNUM SBNUM NUMC 10   0   Simulation requirements number *
76 KBNKZ KBNKZ KBNKZ CHAR 1   0   Kanban Indicator  
77 KAPFX KAPFX XFELD CHAR 1   0   Indicator: capacity for planned order dispatched  
78 SEQNR CY_SEQNR CY_SEQNR NUMC 14   0   Seq. number order  
79 PSTTI PSTTI UZEIT TIMS 6   0   Start Time of Planned Order  
80 PEDTI PEDTI UZEIT TIMS 6   0   End Time of Planned Order  
81 MONKZ MONKZ XFELD CHAR 1   0   Indicator: for assembly order procedures  
82 PRNKZ PRNKZ KREUZ CHAR 1   0   Ind.: Leading order in collective order is planned ordre  
83 MDPBV MDPBV MDPBV CHAR 1   0   Planned order: confirmation of availability  
84 VFMNG VFMNG MENG13 QUAN 13   3   Planned order: committed quantity  
85 MDACH MDACH MDACH CHAR 2   0   Action control: planned order processing *
86 MDACC MDACC MDACC CHAR 4   0   Action: planned order processing *
87 MDACD MDACD DATUM DATS 8   0   Date of action: planned order  
88 MDACT MDACT UZEIT TIMS 6   0   Time of action: Planned order processing  
89 GSBTR GSBTR_PLAF DATUM DATS 8   0   Total commitment date of plnd ord. after ATP check f.comps.  
90 PLETX PLETX XFELD CHAR 1   0   Planned order shift quantities exist  
91 PRSCH MD_PRSCHED XFELD CHAR 1   0   Planned order: scheduling using production dates  
92 LVSCH MD_LVSCHED SCHED_TYPE CHAR 1   0   Planned order: leading scheduling level (determines dates)  
93 KZAVC KZAVC KZAVC CHAR 1   0   Indicator for type of availability check  
94 VRPLA VRPLA XFELD CHAR 1   0   Indicator: planning without final assembly  
95 PBDNR PBDNR CHAR10 CHAR 10   0   Requirements Plan Number  
96 AGREQ AGREQ AGREQ CHAR 1   0   Requirements totaling  
97 UMREZ UMREZ UMBSZ DEC 5   0   Numerator for Conversion to Base Units of Measure  
98 UMREN UMREN UMBSN DEC 5   0   Denominator for conversion to base units of measure  
99 ERFMG ERFMG MENG13 QUAN 13   3   Quantity in unit of entry  
100 ERFME ERFME MEINS UNIT 3   0   Unit of entry *
101 RQNUM RQNUM RQNUM NUMC 10   0   Requirements record number *
102 KZBWS KZBWS KZBWS CHAR 1   0   Valuation of Special Stock  
103 WEMNG WEMNG MENG13 QUAN 13   3   Quantity of goods received  
104 WAMNG WAMNG MENG13 QUAN 13   3   Issued quantity  
History
Last changed by/on SAP  20110901 
SAP Release Created in