SAP ABAP Data Element GSBTR_PLAF (Total commitment date of plnd ord. after ATP check f.comps.)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ MD03 (Package) Appl. development R/3 MPS/determin. requirements planning
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ MD03 (Package) Appl. development R/3 MPS/determin. requirements planning
Basic Data
Data Element | GSBTR_PLAF |
Short Description | Total commitment date of plnd ord. after ATP check f.comps. |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | DATUM | |
Data Type | DATS | Date field (YYYYMMDD) stored as char(8) |
Length | 8 | |
Decimal Places | 0 | |
Output Length | 10 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | TOTAL_COMMIT_DAT | |
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Commitment |
Medium | 15 | Tot. commitment |
Long | 20 | Total commitment |
Heading | 10 | Commitment |
Documentation
Definition
Date by which complete requirement quantity of a planned order is available.
Dependencies
The total confirmation date is only calculated in the availability check according to ATP logic. This date is copied to the planned order as the order confirmation date when you save the results of the availability check.
The system calculates the total confirmation date as follows:
- If the quantity required can be completely committed for the requirement date, the total confirmation date corresponds to the order finish date of the planned order.
- If the quantity required cannot be completely committed for the requirement date, as not every component is available in sufficient quantity by the requested date, then the total confirmation date corresponds to the date of the last component to be completely available plus the in-house production time of the header material.
- If one of the components is not available by the requirement date and if this component cannot be made completely available for any later date, then the system cannot calculate a total confirmation date.
History
Last changed by/on | SAP | 19981111 |
SAP Release Created in |