Data Element GSBTR_PLAF
Short Description Total commitment date of plnd ord. after ATP check f.comps.  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type DATUM    
Data Type DATS   Date field (YYYYMMDD) stored as char(8) 
Length 8    
Decimal Places 0    
Output Length 10    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name TOTAL_COMMIT_DAT   
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Commitment 
Medium 15 Tot. commitment 
Long 20 Total commitment 
Heading 10 Commitment 
Documentation

Definition

Date by which complete requirement quantity of a planned order is available.

Dependencies

The total confirmation date is only calculated in the availability check according to ATP logic. This date is copied to the planned order as the order confirmation date when you save the results of the availability check.

The system calculates the total confirmation date as follows:

  • If the quantity required can be completely committed for the requirement date, the total confirmation date corresponds to the order finish date of the planned order.
  • If the quantity required cannot be completely committed for the requirement date, as not every component is available in sufficient quantity by the requested date, then the total confirmation date corresponds to the date of the last component to be completely available plus the in-house production time of the header material.
  • If one of the components is not available by the requirement date and if this component cannot be made completely available for any later date, then the system cannot calculate a total confirmation date.