SAP ABAP Data Element BSDIF (Difference betw. rqmts. date and order date in fact.cal.days)
Hierarchy
SAP_APPL (Software Component) Logistics and Accounting
   PP-SFC (Application Component) Production Orders
     COIS (Package) Order Information System
Basic Data
Data Element BSDIF
Short Description Difference betw. rqmts. date and order date in fact.cal.days  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type CHAR3    
Data Type CHAR   Character String 
Length 3    
Decimal Places 0    
Output Length 3    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Diff. day 
Medium 15 Difference days 
Long 20 Difference in days 
Heading DDf 
Documentation

Definition

Difference between the planned basic finish date and finish date confirmed by the availability check.

The confirmed finish date is calculated using the component with the largest difference (in factory calendar days) between requirements date and confirmed date:

confirmed finish date =

basic finish date + confirmed date component - rqmts. date component

History
Last changed by/on SAP  19980323 
SAP Release Created in