Data Element list used by SAP ABAP Table EPM_TREE_STR (Plant Manager: Structure for Quantity Variances)
SAP ABAP Table
EPM_TREE_STR (Plant Manager: Structure for Quantity Variances) is using
# | Object Type | Object Name | Object Description | Note |
---|---|---|---|---|
![]() |
![]() |
|||
1 | ![]() |
/CUM/AUEST | CU: Automatic Copy of Estimated Costs | |
2 | ![]() |
/CUM/CMNUM | CU: Construction Measure Number | |
3 | ![]() |
/CUM/DESGUID | CU: GUID of Design Document | |
4 | ![]() |
/CUM/DESNUM | CU: Design Number | |
5 | ![]() |
/CUM/INDCU | CU: Order is Used for Compatible Units | |
6 | ![]() |
/CUM/INTCUNR | CU: Internal CU Number in a Work Order | |
7 | ![]() |
ABGR_SCHL | Results Analysis Key | |
8 | ![]() |
AD_ADDRNUM | Address number | |
9 | ![]() |
AENNR | Change Number | |
10 | ![]() |
AENNR | Change Number | |
11 | ![]() |
AENNR | Change Number | |
12 | ![]() |
AM_UMWKZ | Reason for environmental investment | |
13 | ![]() |
ATRKZ | Request ID | |
14 | ![]() |
AUDISP | Ind: Reservation applicable to MRP;Purc. req. is created | |
15 | ![]() |
AUFABKRS | Processing group | |
16 | ![]() |
AUFAEDAT | Change date for Order Master | |
17 | ![]() |
AUFAENAM | Last changed by | |
18 | ![]() |
AUFART | Order Type | |
19 | ![]() |
AUFERFDAT | Created on | |
20 | ![]() |
AUFERFNAM | Entered by | |
21 | ![]() |
AUFIDAT2 | Technical completion date | |
22 | ![]() |
AUFKALSM | Costing Sheet | |
23 | ![]() |
AUFKOSTV | Responsible cost center | |
24 | ![]() |
AUFKSTAR | Settlement cost element | |
25 | ![]() |
AUFLOEKZ | Deletion flag | |
26 | ![]() |
AUFLTEXT | Long Text Exists | |
27 | ![]() |
AUFNR | Order Number | |
28 | ![]() |
AUFREFNR | Reference order number | |
29 | ![]() |
AUFSOWRK | Location plant | |
30 | ![]() |
AUFSTKZ | Identifier for statistical order | |
31 | ![]() |
AUFTEXT | Description | |
32 | ![]() |
AUFTYP | Order category | |
33 | ![]() |
AUFUSER4 | Estimated total costs of order | |
34 | ![]() |
AUFWAERS | Order Currency | |
35 | ![]() |
AUFZSCHL | Overhead key | |
36 | ![]() |
AWSLS | Variance Key | |
37 | ![]() |
BALIMSGTY | Application Log: Message Type Visualization | |
38 | ![]() |
BALPROBCLH | Application Log: Log problem class | |
39 | ![]() |
BASMN | Base quantity | |
40 | ![]() |
BASMN | Base quantity | |
41 | ![]() |
BASMN | Base quantity | |
42 | ![]() |
BEDID | ID of the capacity requirements record | |
43 | ![]() |
BEDID | ID of the capacity requirements record | |
44 | ![]() |
BEDID | ID of the capacity requirements record | |
45 | ![]() |
BEMOT | Accounting Indicator | |
46 | ![]() |
BERID | MRP Area | |
47 | ![]() |
BKTXT | Document Header Text | |
48 | ![]() |
BLDAT | Document Date in Document | |
49 | ![]() |
BREAKS | Indicator: Scheduling allowing for breaks | |
50 | ![]() |
BSDIF | Difference betw. rqmts. date and order date in fact.cal.days | |
51 | ![]() |
BUDAT | Posting Date in the Document | |
52 | ![]() |
BUKRS | Company Code | |
53 | ![]() |
CCKEY | Cost collector key | |
54 | ![]() |
CCOBJID | Object ID | |
55 | ![]() |
CC_CONF_KEY | Identical object | |
56 | ![]() |
CFB_ADTDAYS | Additional Days | |
57 | ![]() |
CFB_BBD_PPPI | Best-Before Date (BBD)/ Shelf Life Expiration Date (SLED) | |
58 | ![]() |
CFB_DATOFM | Date of Manufacture | |
59 | ![]() |
CHAR1 | Single-Character Flag | |
60 | ![]() |
CHAR46 | Comments on runtime measurement | |
61 | ![]() |
CHARG_D | Batch Number | |
62 | ![]() |
CIM_COUNT | Internal counter | |
63 | ![]() |
CIM_COUNT | Internal counter | |
64 | ![]() |
CIM_COUNT | Internal counter | |
65 | ![]() |
CKML_F_PROCNR | Production Process | |
66 | ![]() |
CKML_PROZESS_TYP | Process Category (Procurement/Consumption) | |
67 | ![]() |
CK_LOSGR | Costing lot size | |
68 | ![]() |
CN_COSTUPD | Costs are updated | |
69 | ![]() |
COIS_ICON_ORDER_KIND | Order Icon | |
70 | ![]() |
COMP_CALC | Indicator: Components will not be costed | |
71 | ![]() |
COWB_CONF_TYPE_TEXT | Short Text for Confirmation Type | |
72 | ![]() |
COWB_SCRAP_TYPE_TEXT | Short Text for Scrap Type | |
73 | ![]() |
CO_ABARB | Confirmation: Degree of processing | |
74 | ![]() |
CO_AGRND | Reason for Variance | |
75 | ![]() |
CO_APLZL | General counter for order | |
76 | ![]() |
CO_APRIO | Order priority | |
77 | ![]() |
CO_APROZ | Scrap percentage | |
78 | ![]() |
CO_APROZ | Scrap percentage | |
79 | ![]() |
CO_ASTEX | User status active | |
80 | ![]() |
CO_ASTTX | Field displaying user status | |
81 | ![]() |
CO_AUFLD | Date of BOM Explosion/Routing Transfer | |
82 | ![]() |
CO_AUFPL | Routing number of operations in the order | |
83 | ![]() |
CO_AUFPL | Routing number of operations in the order | |
84 | ![]() |
CO_AUFPL | Routing number of operations in the order | |
85 | ![]() |
CO_BSFAK | Confirmation factor confirmed qty. for order quantity | |
86 | ![]() |
CO_CHG_TIME | Changed at | |
87 | ![]() |
CO_COLORDPRC | Collective order with/without automatic goods movement | |
88 | ![]() |
CO_DISPO | MRP controller for the order | |
89 | ![]() |
CO_FTRMI | Actual release date | |
90 | ![]() |
CO_FTRMP | Planned release date | |
91 | ![]() |
CO_FTRMS | Scheduled release date | |
92 | ![]() |
CO_FTRPS | Scheduled release date (forecast) | |
93 | ![]() |
CO_GETRI | Confirmed Order Finish Date | |
94 | ![]() |
CO_GEUZI | Confirmed order finish (time) | |
95 | ![]() |
CO_GIAMG | Expected variance from planned qty to be delivered to stock | |
96 | ![]() |
CO_GLTPP | Finish date (forecast) | |
97 | ![]() |
CO_GLTPS | Scheduled forecast finish | |
98 | ![]() |
CO_GLTRI | Actual finish date | |
99 | ![]() |
CO_GLTRP | Basic finish date | |
100 | ![]() |
CO_GLTRS | Scheduled finish | |
101 | ![]() |
CO_GLUPP | Forecast finish (time) | |
102 | ![]() |
CO_GLUPS | Scheduled forecast finish time | |
103 | ![]() |
CO_GLUZP | Basic finish (time) | |
104 | ![]() |
CO_GLUZS | Scheduled finish time | |
105 | ![]() |
CO_GMEIN | Common unit of measure for all order items | |
106 | ![]() |
CO_GRDTX | Text describing the reason for a variance in a confirmation | |
107 | ![]() |
CO_GSBTR | Overall commitment date | |
108 | ![]() |
CO_GSTPP | Forecast start date | |
109 | ![]() |
CO_GSTPS | Scheduled forecast start | |
110 | ![]() |
CO_GSTRI | Actual start date | |
111 | ![]() |
CO_GSTRP | Basic start date | |
112 | ![]() |
CO_GSTRS | Scheduled start | |
113 | ![]() |
CO_GSUPP | Forecast start (time) | |
114 | ![]() |
CO_GSUPS | Scheduled start time (Forecast) | |
115 | ![]() |
CO_GSUZI | Actual start time | |
116 | ![]() |
CO_GSUZP | Basic start time | |
117 | ![]() |
CO_GSUZS | Scheduled Start (Time) | |
118 | ![]() |
CO_GWEMG | Delivered quantity | |
119 | ![]() |
CO_IASMG | Scrap confirmed for order | |
120 | ![]() |
CO_IGMNG | Yield confirmed from order confirmation | |
121 | ![]() |
CO_KSTEMPF | Indicator: Direct cost collector | |
122 | ![]() |
CO_LAUFNR | Leading order in current processing | |
123 | ![]() |
CO_LKNOT | Left node in collective order | |
124 | ![]() |
CO_MATNR | Material Number for Order | |
125 | ![]() |
CO_MATXT | Material description | |
126 | ![]() |
CO_MBAUGR | Superior assembly | |
127 | ![]() |
CO_MES_INT_ROUTINGID | Key of a Routing from an ME System | |
128 | ![]() |
CO_MES_MAX_GAMNG | Maximum Value of Total Order Quantity After Distribution | |
129 | ![]() |
CO_MIMEZ | Expected yield variance | |
130 | ![]() |
CO_MLTPS | Order with multiple items | |
131 | ![]() |
CO_M_VERF | Message Category in Availability Log | |
132 | ![]() |
CO_NAUCOST | Indicator: Do not cost automatically | |
133 | ![]() |
CO_NAUTERM | Indicator: Do not schedule automatically | |
134 | ![]() |
CO_NOPCOST | Do not calculate planned costs for order | |
135 | ![]() |
CO_PENDD | Outline finish of collective order (date) | |
136 | ![]() |
CO_PENDT | Outline finish time | |
137 | ![]() |
CO_PLAUF | Date for routing transfer | |
138 | ![]() |
CO_POSNR | Order item number | |
139 | ![]() |
CO_PRODNET | Indicator: Order is part of collective order | |
140 | ![]() |
CO_PRODPRF | Production Scheduling Profile | |
141 | ![]() |
CO_PSTARTD | Outline start of collective network (date) | |
142 | ![]() |
CO_PSTARTT | Start time of a collective order | |
143 | ![]() |
CO_RKNOT | Right node of a collective order | |
144 | ![]() |
CO_RUECK | Completion confirmation number for the operation | |
145 | ![]() |
CO_STTXT | System Status | |
146 | ![]() |
CO_TEILNET | Number of superior network | |
147 | ![]() |
CO_UPTER | Indicator: Change to Scheduled Dates | |
148 | ![]() |
CO_VFMNG | Committed quantity for order acc. to ATP check components | |
149 | ![]() |
CREA_APL | Application code, where the order/network was created | |
150 | ![]() |
CR_OBJID | Object ID of the resource | |
151 | ![]() |
CR_OBJID | Object ID of the resource | |
152 | ![]() |
CR_OBJTY | Object types of the CIM resource | |
153 | ![]() |
CR_OBJTY | Object types of the CIM resource | |
154 | ![]() |
CSPLIT | Apportionment structure | |
155 | ![]() |
CUOBJ | Configuration (internal object number) | |
156 | ![]() |
CY_SEQNR | Seq. number order | |
157 | ![]() |
C_TIME | Time created | |
158 | ![]() |
DATUV | Valid-From Date | |
159 | ![]() |
DATUV | Valid-From Date | |
160 | ![]() |
DZKRIZ | Counter for additional criteria | |
161 | ![]() |
EPM_PERC | KPI Deviation Target/Actual (Percent) | |
162 | ![]() |
EPM_VALUE | Value of Key Figure | |
163 | ![]() |
FEVOR | Production Supervisor | |
164 | ![]() |
FHORI | Scheduling Margin Key for Floats | |
165 | ![]() |
FKBER | Functional Area | |
166 | ![]() |
FLG_AOB | Indicator: relationships | |
167 | ![]() |
FLG_ARBEI | Indicator: Default value work is relevant | |
168 | ![]() |
FREIZ | Release period (in days) | |
169 | ![]() |
GAMNG | Total order quantity | |
170 | ![]() |
GASMG | Total scrap quantity in the order | |
171 | ![]() |
GSBER | Business Area | |
172 | ![]() |
HISTU | Level (in Multi-Level BOM Explosions) | |
173 | ![]() |
IM_ABUKRS | Requesting company code | |
174 | ![]() |
IM_PROFIL | Investment measure profile | |
175 | ![]() |
IM_SIZECL | Scale of investment objects | |
176 | ![]() |
IWERK | Maintenance Planning Plant | |
177 | ![]() |
IZWEK | Reason for investment | |
178 | ![]() |
JV_ETYPE | Equity type | |
179 | ![]() |
JV_JIBCL | JIB/JIBE Class | |
180 | ![]() |
JV_JIBSA | JIB/JIBE Subclass A | |
181 | ![]() |
JV_NAME | Joint venture | |
182 | ![]() |
JV_OR_CO | JV original cost object | |
183 | ![]() |
JV_OTYPE | Joint Venture Object Type | |
184 | ![]() |
JV_RECIND | Recovery Indicator | |
185 | ![]() |
J_OBJNR | Object number | |
186 | ![]() |
J_STSMA | Status Profile | |
187 | ![]() |
KALKVARIST | Costing variant for actual costs | |
188 | ![]() |
KALKVARPLN | Costing variant for planned costs | |
189 | ![]() |
KALSMA_CH | Search procedure for batch determination | |
190 | ![]() |
KALSN | Calendar Selection for Order | |
191 | ![]() |
KAPPL | Application | |
192 | ![]() |
KAPVERSA | Version of Available Capacity | |
193 | ![]() |
KBED_D | Ind: do not create capacity requirements | |
194 | ![]() |
KDAUF | Sales Order Number | |
195 | ![]() |
KDPOS | Item number in Sales Order | |
196 | ![]() |
KOKRS | Controlling Area | |
197 | ![]() |
KUNAG | Sold-to party | |
198 | ![]() |
KVEWE | Usage of the Condition Table | |
199 | ![]() |
KZAVC | Indicator for type of availability check | |
200 | ![]() |
K_SALDO | Order balance in controlling-area currency | |
201 | ![]() |
LGORT_D | Storage location | |
202 | ![]() |
LOSBS | To Lot Size | |
203 | ![]() |
LOSDIV | Lot size divisor | |
204 | ![]() |
LOSGRBIS | To lot size | |
205 | ![]() |
LOSGRVON | From Lot Size | |
206 | ![]() |
LOSVN | From Lot Size | |
207 | ![]() |
LTXTSP | Long Text Language | |
208 | ![]() |
LZEIH | Unit for maximum storage period | |
209 | ![]() |
MANDT | Client | |
210 | ![]() |
MATNR | Material Number | |
211 | ![]() |
MATNR | Material Number | |
212 | ![]() |
MAUFNR | Number of superior order | |
213 | ![]() |
MAXLZ | Maximum storage period | |
214 | ![]() |
MDV01 | Production line | |
215 | ![]() |
MDV02 | Planning identification 2 | |
216 | ![]() |
MEINS | Base Unit of Measure | |
217 | ![]() |
MEINS | Base Unit of Measure | |
218 | ![]() |
NETZKONT | Indicator for the account assignment of a network(hdr/act.) | |
219 | ![]() |
NO_DISP_PLUS | Effective for Materials Planning | |
220 | ![]() |
OBJEKTID | Object ID | |
221 | ![]() |
OBJEKT_ID | ID/Object key | |
222 | ![]() |
OCM_CH_PROC | Process that has lead to the change of an object | |
223 | ![]() |
OCM_COMP_RES | OCM: Result of comparison of two order objects | |
224 | ![]() |
OCM_OBJ_TYPE | Change indicator | |
225 | ![]() |
O_SALDO | Order balance in order currency | |
226 | ![]() |
PERTR | Planned opening date in planned order | |
227 | ![]() |
PKOSA_D | Cost collector for production process PROCNR | |
228 | ![]() |
PLAFX | Firming indicator for planned order data | |
229 | ![]() |
PLGKZ | Identifier for planning with line items | |
230 | ![]() |
PLNAL | Group Counter | |
231 | ![]() |
PLNAW | Application of the task list | |
232 | ![]() |
PLNME | Task list unit of measure | |
233 | ![]() |
PLNNR | Key for Task List Group | |
234 | ![]() |
PLNTY | Task List Type | |
235 | ![]() |
PLN_VERWE | Task list usage | |
236 | ![]() |
PLWRK | Planning Plant | |
237 | ![]() |
POSNR | Item number of the SD document | |
238 | ![]() |
POSNR | Item number of the SD document | |
239 | ![]() |
PRCTR | Profit Center | |
240 | ![]() |
PROFIDNZPL | Network profile | |
241 | ![]() |
PS_AKSTL | Requesting cost center | |
242 | ![]() |
PS_KZERB | Indicator: Project summarization | |
243 | ![]() |
PS_PLART | Basis for scheduling | |
244 | ![]() |
PS_POSID | Work Breakdown Structure Element (WBS Element) | |
245 | ![]() |
PS_PSP_PNR | Work Breakdown Structure Element (WBS Element) | |
246 | ![]() |
PS_PSP_PNR | Work Breakdown Structure Element (WBS Element) | |
247 | ![]() |
PS_PSP_PRO | Project definition | |
248 | ![]() |
QPLOS | Inspection Lot Number | |
249 | ![]() |
QPROZENT | Unit for the Rate (Percent) | |
250 | ![]() |
RC_VERF | Result of availability check | |
251 | ![]() |
REDKZ | Reduction indicator for scheduling | |
252 | ![]() |
REDKZP | Reduction indicator for scheduling (forecast) | |
253 | ![]() |
REVLV | Revision level | |
254 | ![]() |
RGEKZ | Indicator: Backflush | |
255 | ![]() |
RMNGA | Total confirmed rework quantity | |
256 | ![]() |
RSNUM | Number of reservation/dependent requirements | |
257 | ![]() |
RSNUM | Number of reservation/dependent requirements | |
258 | ![]() |
RSORD | Refurbishment order indicator (PM) | |
259 | ![]() |
RU_LMNGA | Yield currently to be confirmed | |
260 | ![]() |
RU_RMNGA | Current rework quantity to be confirmed | |
261 | ![]() |
RU_VORME | Confirmation unit of measure | |
262 | ![]() |
RU_XMNGA | Scrap currently to be confirmed | |
263 | ![]() |
SA_AUFNR | Run schedule header number | |
264 | ![]() |
SA_CHARG | Receiving batch for repetitive manufacturing | |
265 | ![]() |
SA_ERFME | Unit of measure for backflush quantity and for actual scrap | |
266 | ![]() |
SA_ERFMG | Backflush quantity in repetitive manufacturing | |
267 | ![]() |
SA_GRUND | Reason for scrap | |
268 | ![]() |
SA_MNG04 | Scrap quantity | |
269 | ![]() |
SA_ZPUNKT | Reporting Point | |
270 | ![]() |
SCOPE_CV | Object Class | |
271 | ![]() |
SICHZ | Float after production (in days) | |
272 | ![]() |
SICHZ_TRM | Scheduled float after production in days | |
273 | ![]() |
SOBKZ | Special Stock Indicator | |
274 | ![]() |
SPLIT_STAT | Status of an order in a split hierarchy | |
275 | ![]() |
STALT | Alternative BOM | |
276 | ![]() |
STLAN | BOM Usage | |
277 | ![]() |
STLST | BOM Statuses | |
278 | ![]() |
STLTY | BOM Category | |
279 | ![]() |
STNUM | Bill of Material | |
280 | ![]() |
SYSUUID_X | UUID in X form (binary) | |
281 | ![]() |
TABIX_D | Field defined as in SY-TABIX | |
282 | ![]() |
TERHW | Scheduling note from order scheduling | |
283 | ![]() |
TERMKZ | Scheduling type | |
284 | ![]() |
TERMKZP | Scheduling type (forecast) | |
285 | ![]() |
TEXT40 | Text, 40 Characters Long | |
286 | ![]() |
TRMDT | Date of the last scheduling | |
287 | ![]() |
TXJCD | Tax Jurisdiction | |
288 | ![]() |
TYPKZ | Type of object causing the load (order category) | |
289 | ![]() |
VAGRP | Responsible planner group/department | |
290 | ![]() |
VBELN | Sales and Distribution Document Number | |
291 | ![]() |
VERID | Production Version | |
292 | ![]() |
VORGZ | Float before production (in days) | |
293 | ![]() |
VORGZ_TRM | Scheduled float before production in days | |
294 | ![]() |
VSNMR_V | Sales document version number | |
295 | ![]() |
WEGXX | Path (for Multi-Level BOM Explosions) | |
296 | ![]() |
WEGXX | Path (for Multi-Level BOM Explosions) | |
297 | ![]() |
WERKS_D | Plant | |
298 | ![]() |
WFCID | Factory Calendar | |
299 | ![]() |
WOGXXX | Total Value in Object Currency | |
300 | ![]() |
WOGXXX | Total Value in Object Currency | |
301 | ![]() |
WOGXXX | Total Value in Object Currency |