Data Element list used by SAP ABAP Table /MRSS/T_RMI_HEADER_NW (Request header)
SAP ABAP Table
/MRSS/T_RMI_HEADER_NW (Request header) is using
| # | Object Type | Object Name | Object Description | Note |
|---|---|---|---|---|
| 1 | /MRSS/T_EXT_SYS_ID | External System ID | ||
| 2 | /MRSS/T_EXT_SYS_TYPE | External System Type | ||
| 3 | /MRSS/T_GUID | GUID | ||
| 4 | /MRSS/T_RM_ABCKZ | ABC indicator for technical object | ||
| 5 | /MRSS/T_RM_ABGR_SCHL | Results Analysis Key | ||
| 6 | /MRSS/T_RM_ABNUM | Maintenance Plan Call Number | ||
| 7 | /MRSS/T_RM_ACTIVITY_TYPE | Process variant | ||
| 8 | /MRSS/T_RM_ADDAT | PM Order: Reference Date | ||
| 9 | /MRSS/T_RM_ADDCOMPARE_CORE | Reference Element PM/PS | ||
| 10 | /MRSS/T_RM_ADUHR | Time of Reference Date | ||
| 11 | /MRSS/T_RM_AEKNZ | Change indicator | ||
| 12 | /MRSS/T_RM_AEKNZ | Change indicator | ||
| 13 | /MRSS/T_RM_AEKNZ | Change indicator | ||
| 14 | /MRSS/T_RM_AEKNZ | Change indicator | ||
| 15 | /MRSS/T_RM_AEKNZ | Change indicator | ||
| 16 | /MRSS/T_RM_AEKNZ | Change indicator | ||
| 17 | /MRSS/T_RM_AEKNZ | Change indicator | ||
| 18 | /MRSS/T_RM_AEKNZ | Change indicator | ||
| 19 | /MRSS/T_RM_AEKNZ | Change indicator | ||
| 20 | /MRSS/T_RM_AEKNZ | Change indicator | ||
| 21 | /MRSS/T_RM_AEKNZ | Change indicator | ||
| 22 | /MRSS/T_RM_AEKNZ | Change indicator | ||
| 23 | /MRSS/T_RM_AENNR | Change Number | ||
| 24 | /MRSS/T_RM_AENNR | Change Number | ||
| 25 | /MRSS/T_RM_AFAKT | Execution Factor | ||
| 26 | /MRSS/T_RM_AKKNZ | Order Category Indicator Plant Maintenance | ||
| 27 | /MRSS/T_RM_AM_UMWKZ | Reason for environmental investment | ||
| 28 | /MRSS/T_RM_ANING | Name of Person Reponsible for System | ||
| 29 | /MRSS/T_RM_ANLBD | Date until which the system is available | ||
| 30 | /MRSS/T_RM_ANLBZ | Time until which the system is available | ||
| 31 | /MRSS/T_RM_ANLVD | Date from which the system is available | ||
| 32 | /MRSS/T_RM_ANLVZ | Time from Which System is Available | ||
| 33 | /MRSS/T_RM_ANLZU | Syst.Condition | ||
| 34 | /MRSS/T_RM_AP_KTEXT | Short text for the work center | ||
| 35 | /MRSS/T_RM_ARTPR | Priority Type | ||
| 36 | /MRSS/T_RM_ASSIGNMENTTYPE_NW | Assignment Types | ||
| 37 | /MRSS/T_RM_ATRKZ | Request ID | ||
| 38 | /MRSS/T_RM_AUDISP_PLUS | Reservation Relevance/Generation of Purchase Requisition | ||
| 39 | /MRSS/T_RM_AUFABKRS | Processing group | ||
| 40 | /MRSS/T_RM_AUFAEDAT | Change date for Order Master | ||
| 41 | /MRSS/T_RM_AUFAENAM | Last changed by | ||
| 42 | /MRSS/T_RM_AUFART | Order Type | ||
| 43 | /MRSS/T_RM_AUFERFDAT | Created on | ||
| 44 | /MRSS/T_RM_AUFERFNAM | Entered by | ||
| 45 | /MRSS/T_RM_AUFERFNAM | Entered by | ||
| 46 | /MRSS/T_RM_AUFIDAT2 | Technical completion date | ||
| 47 | /MRSS/T_RM_AUFKALSM | Costing Sheet | ||
| 48 | /MRSS/T_RM_AUFKSTAR | Settlement cost element | ||
| 49 | /MRSS/T_RM_AUFLOEKZ | Deletion flag | ||
| 50 | /MRSS/T_RM_AUFLTEXT | Long Text Exists | ||
| 51 | /MRSS/T_RM_AUFNR | Order Number | ||
| 52 | /MRSS/T_RM_AUFREFNR | Reference order number | ||
| 53 | /MRSS/T_RM_AUFSOWRK | Location plant | ||
| 54 | /MRSS/T_RM_AUFSTKZ | Identifier for statistical order | ||
| 55 | /MRSS/T_RM_AUFTEXT | Description | ||
| 56 | /MRSS/T_RM_AUFTYP | Order category | ||
| 57 | /MRSS/T_RM_AUFWAERS | Order Currency | ||
| 58 | /MRSS/T_RM_AUFWAERS | Order Currency | ||
| 59 | /MRSS/T_RM_AUFZSCHL | Overhead key | ||
| 60 | /MRSS/T_RM_AUF_PLKNZ | Maintenance order planning indicator | ||
| 61 | /MRSS/T_RM_AUKBED | Indicator: Calculate capacity requirements | ||
| 62 | /MRSS/T_RM_AVOUEB | Indicator: Display operation overview | ||
| 63 | /MRSS/T_RM_AWSLS | Variance Key | ||
| 64 | /MRSS/T_RM_BASMN | Base quantity | ||
| 65 | /MRSS/T_RM_BAUTL | Assembly | ||
| 66 | /MRSS/T_RM_BEBER | Plant section | ||
| 67 | /MRSS/T_RM_BEDID | ID of the capacity requirements record | ||
| 68 | /MRSS/T_RM_BEDID | ID of the capacity requirements record | ||
| 69 | /MRSS/T_RM_BEDID | ID of the capacity requirements record | ||
| 70 | /MRSS/T_RM_BILLING_OBJ_TYPE_NW | Billing Object Type | ||
| 71 | /MRSS/T_RM_BILL_OBJ_NW | SO/IO/CC Number | ||
| 72 | /MRSS/T_RM_BOOLEAN | Supplement for True Boolean Type: 'X' == True '' == False | ||
| 73 | /MRSS/T_RM_BREAKS | Indicator: Scheduling allowing for breaks | ||
| 74 | /MRSS/T_RM_BROADCAST_TARGET_NW | Broadcast Targets | ||
| 75 | /MRSS/T_RM_BUKRS | Company Code | ||
| 76 | /MRSS/T_RM_CCKEY | Cost collector key | ||
| 77 | /MRSS/T_RM_CCOBJID | Object ID | ||
| 78 | /MRSS/T_RM_CD_OPPOR_TYPE_NW | CD Opportunity | ||
| 79 | /MRSS/T_RM_CHECKS_REQD_NW | BC/S/DS Req'd | ||
| 80 | /MRSS/T_RM_CIM_COUNT | Internal counter | ||
| 81 | /MRSS/T_RM_CIM_COUNT | Internal counter | ||
| 82 | /MRSS/T_RM_CIM_COUNT | Internal counter | ||
| 83 | /MRSS/T_RM_CKML_F_PROCNR | Production Process | ||
| 84 | /MRSS/T_RM_CKML_PROZESS_TYP | Process Category (Procurement/Consumption) | ||
| 85 | /MRSS/T_RM_CK_LOSGR | Lot Size for Product Costing | ||
| 86 | /MRSS/T_RM_CN_AUTH | Ind.: Authorization exists | ||
| 87 | /MRSS/T_RM_CN_AUTH | Ind.: Authorization exists | ||
| 88 | /MRSS/T_RM_CN_AUTH | Ind.: Authorization exists | ||
| 89 | /MRSS/T_RM_CN_AUTH | Ind.: Authorization exists | ||
| 90 | /MRSS/T_RM_CN_AUTH | Ind.: Authorization exists | ||
| 91 | /MRSS/T_RM_CN_AUTH | Ind.: Authorization exists | ||
| 92 | /MRSS/T_RM_CN_AUTH | Ind.: Authorization exists | ||
| 93 | /MRSS/T_RM_CN_COSTUPD | Costs are updated | ||
| 94 | /MRSS/T_RM_COMP_CALC | Indicator: Components will not be costed | ||
| 95 | /MRSS/T_RM_CONTRACT_TYPE_NW | Contract Type | ||
| 96 | /MRSS/T_RM_CORP_COMPANY_NW | Corporate Company | ||
| 97 | /MRSS/T_RM_CORP_ORG_NW | Corporate Organization | ||
| 98 | /MRSS/T_RM_CO_ABARB | Confirmation: Degree of processing | ||
| 99 | /MRSS/T_RM_CO_APLZL | General counter for order | ||
| 100 | /MRSS/T_RM_CO_APRIO | Order priority | ||
| 101 | /MRSS/T_RM_CO_APROZ | Scrap percentage | ||
| 102 | /MRSS/T_RM_CO_APROZ | Scrap percentage | ||
| 103 | /MRSS/T_RM_CO_ASTEX | User status active | ||
| 104 | /MRSS/T_RM_CO_ASTTX | Field displaying user status | ||
| 105 | /MRSS/T_RM_CO_AUCOST | Indicator: Cost automatically | ||
| 106 | /MRSS/T_RM_CO_AUFLD | Date of BOM Explosion/Routing Transfer | ||
| 107 | /MRSS/T_RM_CO_AUFPL | Routing number of operations in the order | ||
| 108 | /MRSS/T_RM_CO_AUFPL | Routing number of operations in the order | ||
| 109 | /MRSS/T_RM_CO_AUTERM | Indicator: Schedule automatically | ||
| 110 | /MRSS/T_RM_CO_CHG_TIME | Changed at | ||
| 111 | /MRSS/T_RM_CO_COLORDPRC | Collective order with/without automatic goods movement | ||
| 112 | /MRSS/T_RM_CO_DISPO | MRP controller for the order | ||
| 113 | /MRSS/T_RM_CO_FLGMD | FAUF: Reading of master data executed | ||
| 114 | /MRSS/T_RM_CO_FREIKZ | Indicator: Release order immediately | ||
| 115 | /MRSS/T_RM_CO_FTRMI | Actual release date | ||
| 116 | /MRSS/T_RM_CO_FTRMP | Planned release date | ||
| 117 | /MRSS/T_RM_CO_FTRMS | Scheduled release date | ||
| 118 | /MRSS/T_RM_CO_FTRPS | Scheduled release date (forecast) | ||
| 119 | /MRSS/T_RM_CO_GETRI | Confirmed Order Finish Date | ||
| 120 | /MRSS/T_RM_CO_GEUZI | Confirmed order finish (time) | ||
| 121 | /MRSS/T_RM_CO_GIAMG | Expected variance from planned qty to be delivered to stock | ||
| 122 | /MRSS/T_RM_CO_GLTPP | Finish date (forecast) | ||
| 123 | /MRSS/T_RM_CO_GLTPS | Scheduled forecast finish | ||
| 124 | /MRSS/T_RM_CO_GLTRI | Actual finish date | ||
| 125 | /MRSS/T_RM_CO_GLTRP | Basic finish date | ||
| 126 | /MRSS/T_RM_CO_GLTRS | Scheduled finish | ||
| 127 | /MRSS/T_RM_CO_GLUPP | Forecast finish (time) | ||
| 128 | /MRSS/T_RM_CO_GLUPP | Forecast finish (time) | ||
| 129 | /MRSS/T_RM_CO_GLUPS | Scheduled forecast finish time | ||
| 130 | /MRSS/T_RM_CO_GLUZP | Basic finish (time) | ||
| 131 | /MRSS/T_RM_CO_GLUZS | Scheduled finish time | ||
| 132 | /MRSS/T_RM_CO_GLUZS | Scheduled finish time | ||
| 133 | /MRSS/T_RM_CO_GMEIN | Common unit of measure for all order items | ||
| 134 | /MRSS/T_RM_CO_GSTPP | Forecast start date | ||
| 135 | /MRSS/T_RM_CO_GSTPS | Scheduled forecast start | ||
| 136 | /MRSS/T_RM_CO_GSTRI | Actual start date | ||
| 137 | /MRSS/T_RM_CO_GSTRP | Basic start date | ||
| 138 | /MRSS/T_RM_CO_GSTRS | Scheduled start | ||
| 139 | /MRSS/T_RM_CO_GSUPS | Scheduled start time (Forecast) | ||
| 140 | /MRSS/T_RM_CO_GSUZI | Actual start time | ||
| 141 | /MRSS/T_RM_CO_GSUZP | Basic start time | ||
| 142 | /MRSS/T_RM_CO_GWEMG | Delivered quantity | ||
| 143 | /MRSS/T_RM_CO_IASMG | Scrap confirmed for order | ||
| 144 | /MRSS/T_RM_CO_IGMNG | Yield confirmed from order confirmation | ||
| 145 | /MRSS/T_RM_CO_KDAUF | Sales order number | ||
| 146 | /MRSS/T_RM_CO_KDPOS | Sales order item | ||
| 147 | /MRSS/T_RM_CO_KONSI | Selection: Consignment stock | ||
| 148 | /MRSS/T_RM_CO_KONTI | Account assignment | ||
| 149 | /MRSS/T_RM_CO_KORRK | Order conversion with the possibility of making corrections | ||
| 150 | /MRSS/T_RM_CO_KSTEMPF | Indicator: Direct cost collector | ||
| 151 | /MRSS/T_RM_CO_LAUFNR | Leading order in current processing | ||
| 152 | /MRSS/T_RM_CO_LEIHG | Selection: Returnable packaging | ||
| 153 | /MRSS/T_RM_CO_LKNOT | Left node in collective order | ||
| 154 | /MRSS/T_RM_CO_LTEXT | Long text exists | ||
| 155 | /MRSS/T_RM_CO_MATNR | Material Number for Order | ||
| 156 | /MRSS/T_RM_CO_MATXT | Material description | ||
| 157 | /MRSS/T_RM_CO_MBAUGR | Superior assembly | ||
| 158 | /MRSS/T_RM_CO_MIMEZ | Expected yield variance | ||
| 159 | /MRSS/T_RM_CO_MLTPS | Order with multiple items | ||
| 160 | /MRSS/T_RM_CO_NAUCOST | Indicator: Do not cost automatically | ||
| 161 | /MRSS/T_RM_CO_NAUTERM | Indicator: Do not schedule automatically | ||
| 162 | /MRSS/T_RM_CO_NOPCOST | Do not calculate planned costs for order | ||
| 163 | /MRSS/T_RM_CO_PENDD | Outline finish of collective order (date) | ||
| 164 | /MRSS/T_RM_CO_PENDT | Outline finish time | ||
| 165 | /MRSS/T_RM_CO_PLAFKZ | Indicator: Convert planned order with RSNUM | ||
| 166 | /MRSS/T_RM_CO_PLAUF | Date for routing transfer | ||
| 167 | /MRSS/T_RM_CO_POSNR | Order Item Number | ||
| 168 | /MRSS/T_RM_CO_PRMBD | Check with requirements | ||
| 169 | /MRSS/T_RM_CO_PRODNET | Indicator: Order is part of collective order | ||
| 170 | /MRSS/T_RM_CO_PRODPRF | Production Scheduling Profile | ||
| 171 | /MRSS/T_RM_CO_PSTARTD | StartOutline start of collective network (date) | ||
| 172 | /MRSS/T_RM_CO_PSTARTT | Start time of a collective order | ||
| 173 | /MRSS/T_RM_CO_RKNOT | Right node of a collective order | ||
| 174 | /MRSS/T_RM_CO_RUECK | Completion confirmation number for the operation | ||
| 175 | /MRSS/T_RM_CO_SDATB | To selection date | ||
| 176 | /MRSS/T_RM_CO_SDATV | From selection date | ||
| 177 | /MRSS/T_RM_CO_STTXT | System Status | ||
| 178 | /MRSS/T_RM_CO_TEILNET | Number of superior network | ||
| 179 | /MRSS/T_RM_CO_TM_FREI | Indicator: Order is (partially) released | ||
| 180 | /MRSS/T_RM_CO_TM_TABG | Indicator: Order is technically completed | ||
| 181 | /MRSS/T_RM_CO_UMSKZ | Indicator: Collective conversion of planned orders | ||
| 182 | /MRSS/T_RM_CO_UPTER | Indicator: Change to Scheduled Dates | ||
| 183 | /MRSS/T_RM_CREA_APL | Application code, where the order/network was created | ||
| 184 | /MRSS/T_RM_CRM_PROB_NW | CRM Probability | ||
| 185 | /MRSS/T_RM_CR_OBJID | Object ID of the resource | ||
| 186 | /MRSS/T_RM_CR_OBJID | Object ID of the resource | ||
| 187 | /MRSS/T_RM_CR_OBJTY | Object types of the CIM resource | ||
| 188 | /MRSS/T_RM_CR_OBJTY | Object types of the CIM resource | ||
| 189 | /MRSS/T_RM_CR_OBJTY | Object types of the CIM resource | ||
| 190 | /MRSS/T_RM_CSPLIT | Apportionment Structure | ||
| 191 | /MRSS/T_RM_CUOBJ | Configuration (internal object number) | ||
| 192 | /MRSS/T_RM_CUST_CONTACT_NW | Customer Contact | ||
| 193 | /MRSS/T_RM_CUST_NAME2_NW | Customer name 2 | ||
| 194 | /MRSS/T_RM_CY_SEQNR | Seq. number order | ||
| 195 | /MRSS/T_RM_DATAN | Date of Technical Inspection | ||
| 196 | /MRSS/T_RM_DATUV | Valid-From Date | ||
| 197 | /MRSS/T_RM_DATUV | Valid-From Date | ||
| 198 | /MRSS/T_RM_DAUFN | Standing order number | ||
| 199 | /MRSS/T_RM_DEAL_VALUE_NUMC_NW | Deal Value | ||
| 200 | /MRSS/T_RM_DEVICEID | Additional Device Data | ||
| 201 | /MRSS/T_RM_DZKRIZ | Counter for additional criteria | ||
| 202 | /MRSS/T_RM_EQFNR | Sort field | ||
| 203 | /MRSS/T_RM_EQUNR | Equipment Number | ||
| 204 | /MRSS/T_RM_FEVOR | Production scheduler | ||
| 205 | /MRSS/T_RM_FHORI | Scheduling Margin Key for Floats | ||
| 206 | /MRSS/T_RM_FLAG_NW | Indicator | ||
| 207 | /MRSS/T_RM_FLAG_NW | Indicator | ||
| 208 | /MRSS/T_RM_FLGSER | Serial Number with Incomplete Equipment | ||
| 209 | /MRSS/T_RM_FLG_ADDR | Ind: Address update must be called up | ||
| 210 | /MRSS/T_RM_FLG_AOB | Indicator: relationships | ||
| 211 | /MRSS/T_RM_FLG_ARBEI | Indicator: Default value work is relevant | ||
| 212 | /MRSS/T_RM_FLG_CALC | Indicator: Order (network etc.) still to be calculated | ||
| 213 | /MRSS/T_RM_FLG_DIRECT | Indicator: Direct function call | ||
| 214 | /MRSS/T_RM_FLG_LFINF | Ind.: Book delivery information | ||
| 215 | /MRSS/T_RM_FLG_LVS | Indicator: WM relevant change made | ||
| 216 | /MRSS/T_RM_FLG_PARENT | Indicator: Order has dependent orders | ||
| 217 | /MRSS/T_RM_FLG_PRINT | Indicator: Order still to be printed (internal field) | ||
| 218 | /MRSS/T_RM_FLG_RUCK | Ind: Confirmation to be saved | ||
| 219 | /MRSS/T_RM_FLG_SERV | Ind: Services must be updated | ||
| 220 | /MRSS/T_RM_FLG_TERDIA | Indicator: Refill dialog table for scheduling | ||
| 221 | /MRSS/T_RM_FLG_TERM | Indicator: Scheduling must take data changes into account | ||
| 222 | /MRSS/T_RM_FLG_TRME | Indicator: Scheduling is carried out at least once | ||
| 223 | /MRSS/T_RM_FLG_TRMV | Indicator: Operation changes relevant to scheduling | ||
| 224 | /MRSS/T_RM_FLOWDOWN_TERMS_NW | Flow Down Terms | ||
| 225 | /MRSS/T_RM_FREIZ | Release period (in days) | ||
| 226 | /MRSS/T_RM_GAMNG | Total order quantity | ||
| 227 | /MRSS/T_RM_GASMG | Total scrap quantity in the order | ||
| 228 | /MRSS/T_RM_GAUZT | Planned downtime in hours | ||
| 229 | /MRSS/T_RM_GERNR | Serial number | ||
| 230 | /MRSS/T_RM_GEWRK | Main work center for maintenance tasks | ||
| 231 | /MRSS/T_RM_GSBER | Business Area | ||
| 232 | /MRSS/T_RM_HISDA | PM request: History date | ||
| 233 | /MRSS/T_RM_HISTU | LevelLevel (in multi-level BOM explo | ||
| 234 | /MRSS/T_RM_ILA | Maintenance activity type | ||
| 235 | /MRSS/T_RM_ILOAI | ILOA Individual | ||
| 236 | /MRSS/T_RM_ILOAN | Location and account assignment for technical object | ||
| 237 | /MRSS/T_RM_ILOM_OWNER | Object reference indicator | ||
| 238 | /MRSS/T_RM_IM_PROFIL | Investment measure profile | ||
| 239 | /MRSS/T_RM_IM_SIZECL | Scale of investment objects | ||
| 240 | /MRSS/T_RM_INGRP | Planner Group for Customer Service and Plant Maintenance | ||
| 241 | /MRSS/T_RM_INIT_DONE | Internal Initialization Carried Out Once | ||
| 242 | /MRSS/T_RM_INNAM | Name of the Maintenance Planner Group | ||
| 243 | /MRSS/T_RM_INSPK | Name of Person Responsible for Technical Inspection | ||
| 244 | /MRSS/T_RM_INV_PARTNER_NW | Involved Partner at project | ||
| 245 | /MRSS/T_RM_IWERK | Maintenance Planning Plant | ||
| 246 | /MRSS/T_RM_IZWEK | Reason for investment | ||
| 247 | /MRSS/T_RM_JV_JIBCL | JIB/JIBE Class | ||
| 248 | /MRSS/T_RM_JV_JIBSA | JIB/JIBE Subclass A | ||
| 249 | /MRSS/T_RM_JV_OR_CO | JV original cost object | ||
| 250 | /MRSS/T_RM_JV_OTYPE | Joint Venture Object Type | ||
| 251 | /MRSS/T_RM_J_OBJNR | Object number | ||
| 252 | /MRSS/T_RM_J_STSMA | Status Profile | ||
| 253 | /MRSS/T_RM_KALKVARIST | Costing variant for actual costs | ||
| 254 | /MRSS/T_RM_KALKVARPLN | Costing variant for planned costs | ||
| 255 | /MRSS/T_RM_KALSMA_CH | Search procedure for batch determination | ||
| 256 | /MRSS/T_RM_KAPPL | Application | ||
| 257 | /MRSS/T_RM_KAPVERSA | Version of Available Capacity | ||
| 258 | /MRSS/T_RM_KBED_D | Ind: do not create capacity requirements | ||
| 259 | /MRSS/T_RM_KDAUF | Sales Order Number | ||
| 260 | /MRSS/T_RM_KOKRS | Controlling Area | ||
| 261 | /MRSS/T_RM_KUNUM | Customer Number | ||
| 262 | /MRSS/T_RM_KVEWE | Usage of the condition table | ||
| 263 | /MRSS/T_RM_KZAVC | Indicator for type of availability check | ||
| 264 | /MRSS/T_RM_K_SALDO | Order balance in controlling-area currency | ||
| 265 | /MRSS/T_RM_LANGUAGE_NW | Language(s) | ||
| 266 | /MRSS/T_RM_LAUFN | Order number | ||
| 267 | /MRSS/T_RM_LD_LINE | Line hierarchy | ||
| 268 | /MRSS/T_RM_LGWID | Object ID of the Work Center | ||
| 269 | /MRSS/T_RM_LOCATION_NW | Project Location | ||
| 270 | /MRSS/T_RM_LOSBS | To Lot Size | ||
| 271 | /MRSS/T_RM_LOSDIV | Lot size divisor | ||
| 272 | /MRSS/T_RM_LOSGRBIS | To lot size | ||
| 273 | /MRSS/T_RM_LOSGRVON | From Lot Size | ||
| 274 | /MRSS/T_RM_LOSVN | From Lot Size | ||
| 275 | /MRSS/T_RM_MANAGER_TYPE | Assignment to resource planner or contact person | ||
| 276 | /MRSS/T_RM_MATNR | Material Number | ||
| 277 | /MRSS/T_RM_MATNR | Material Number | ||
| 278 | /MRSS/T_RM_MATSV | Service product | ||
| 279 | /MRSS/T_RM_MAUEH | Unit for Breakdown Duration | ||
| 280 | /MRSS/T_RM_MAUFNR | Number of superior order | ||
| 281 | /MRSS/T_RM_MEINS | Base Unit of Measure | ||
| 282 | /MRSS/T_RM_MNGSP | Service product quantity | ||
| 283 | /MRSS/T_RM_NEND_IST | Actual finish for collective order (date) | ||
| 284 | /MRSS/T_RM_NEND_TRM | Scheduled finish date of collective order (date) | ||
| 285 | /MRSS/T_RM_NENT_IST | Actual finish collective order (time) | ||
| 286 | /MRSS/T_RM_NENT_TRM | Scheduled finish collective order (time) | ||
| 287 | /MRSS/T_RM_NETZKONT | Indicator for the account assignment of a network(hdr/act.) | ||
| 288 | /MRSS/T_RM_NO_DISP_PLUS | Effective for Materials Planning | ||
| 289 | /MRSS/T_RM_NPLDA | Next planned date | ||
| 290 | /MRSS/T_RM_NSTART_IST | Actual start collective order (date) | ||
| 291 | /MRSS/T_RM_NSTART_TRM | Scheduled start date of collective order (date) | ||
| 292 | /MRSS/T_RM_NSTT_IST | Actual start collective order (time) | ||
| 293 | /MRSS/T_RM_NSTT_TRM | Scheduled start collective order (time) | ||
| 294 | /MRSS/T_RM_NWART | Type of network | ||
| 295 | /MRSS/T_RM_NW_BOOKED | Network Set to "Booked" | ||
| 296 | /MRSS/T_RM_OBJKNR | Object list number | ||
| 297 | /MRSS/T_RM_OCM_CH_PROC | Process that has lead to the change of an object | ||
| 298 | /MRSS/T_RM_OCM_COMP_RES | OCM: Result of comparison of two order objects | ||
| 299 | /MRSS/T_RM_OCM_OBJ_TYPE | Change indicator | ||
| 300 | /MRSS/T_RM_ORDER_PROB | Order Probability ID | ||
| 301 | /MRSS/T_RM_ORDER_PROB_NW | Order Probability | ||
| 302 | /MRSS/T_RM_ORIGIN_NW | Request Origin | ||
| 303 | /MRSS/T_RM_O_SALDO | Order balance in order currency | ||
| 304 | /MRSS/T_RM_PKNUM | Control cycle number | ||
| 305 | /MRSS/T_RM_PKOSA_D | Cost collector for production process PROCNR | ||
| 306 | /MRSS/T_RM_PKPOS | Kanban item number / control cycle item | ||
| 307 | /MRSS/T_RM_PLAN_STRUCT_ID | Resource planning nodes | ||
| 308 | /MRSS/T_RM_PLART_TX | Description of the basis for scheduling | ||
| 309 | /MRSS/T_RM_PLGKZ | Identifier for planning with line items | ||
| 310 | /MRSS/T_RM_PLNAL | Group Counter | ||
| 311 | /MRSS/T_RM_PLNAW | Application of the task list | ||
| 312 | /MRSS/T_RM_PLNME | Task list unit of measure | ||
| 313 | /MRSS/T_RM_PLNNR | Key for Task List Group | ||
| 314 | /MRSS/T_RM_PLNNR_REF | Number of standard networks to be copied | ||
| 315 | /MRSS/T_RM_PLNTY | Task List Type | ||
| 316 | /MRSS/T_RM_PLN_VERWE | Task list usage | ||
| 317 | /MRSS/T_RM_PM_ABR_FLG | Flag: Maintenance plan call | ||
| 318 | /MRSS/T_RM_PM_OBJTY | Object Type of CIM Resources for Work Center | ||
| 319 | /MRSS/T_RM_PM_PHASE | Maintenance processing stage | ||
| 320 | /MRSS/T_RM_PM_PRT_FLG | Indicator: Order Printing Requested | ||
| 321 | /MRSS/T_RM_PM_WO_FLG | Indicator: Order Creation from PM Notification | ||
| 322 | /MRSS/T_RM_PPSID | Object ID of PP work center | ||
| 323 | /MRSS/T_RM_PRCTR | Profitcenter | ||
| 324 | /MRSS/T_RM_PRIOK | Priority | ||
| 325 | /MRSS/T_RM_PROFIDNZPL | Network profile | ||
| 326 | /MRSS/T_RM_PROJ_COUNTRY_NW | Project Country | ||
| 327 | /MRSS/T_RM_PROJ_PRIME_NW | Project Primed By | ||
| 328 | /MRSS/T_RM_PROJ_SERVICE_NW | Project Service | ||
| 329 | /MRSS/T_RM_PRQ_SUREG_NW | Super region per country | ||
| 330 | /MRSS/T_RM_PRTRV | Indicator: Project date definition | ||
| 331 | /MRSS/T_RM_PS_KZERB | Indicator: Project summarization via master data charact. | ||
| 332 | /MRSS/T_RM_PS_PLART | Basis for scheduling | ||
| 333 | /MRSS/T_RM_PS_PSP_PNR | Work Breakdown Structure Element (WBS Element) | ||
| 334 | /MRSS/T_RM_PS_PSP_PNR | Work Breakdown Structure Element (WBS Element) | ||
| 335 | /MRSS/T_RM_PS_PSP_PRO | Project definition | ||
| 336 | /MRSS/T_RM_PS_SPS_ELE | Standard WBS element | ||
| 337 | /MRSS/T_RM_PS_TERMBAS | Set of dates for network | ||
| 338 | /MRSS/T_RM_QMNUM | Notification No | ||
| 339 | /MRSS/T_RM_QPLOS | Inspection Lot Number | ||
| 340 | /MRSS/T_RM_RAUMNR | Room | ||
| 341 | /MRSS/T_RM_REDKZ | Reduction indicator for scheduling | ||
| 342 | /MRSS/T_RM_REDKZP | Reduction indicator for scheduling (forecast) | ||
| 343 | /MRSS/T_RM_REDKZ_TX | Description of reduction indicator | ||
| 344 | /MRSS/T_RM_REQUEST_LOB_R3_NW | Requester Line of Business | ||
| 345 | /MRSS/T_RM_REQUEST_TYPE_NW | Request Type | ||
| 346 | /MRSS/T_RM_REQ_CATEGORY | Request Category | ||
| 347 | /MRSS/T_RM_REQ_ESCALATIONID_NW | Escalation Header | ||
| 348 | /MRSS/T_RM_REQ_PARTNER_NW | Requested Partner | ||
| 349 | /MRSS/T_RM_RESP_RM_ORG_NW | Responsible RM Org | ||
| 350 | /MRSS/T_RM_REVLV | Revision level | ||
| 351 | /MRSS/T_RM_REVNI | Revision for Plant Maintenance and Customer Service | ||
| 352 | /MRSS/T_RM_RGEKZ | Indicator: Backflush | ||
| 353 | /MRSS/T_RM_RMNGA | Total confirmed rework quantity | ||
| 354 | /MRSS/T_RM_RSNUM | Number of Reservation/Dependent Requirement | ||
| 355 | /MRSS/T_RM_RSNUM | Number of Reservation/Dependent Requirement | ||
| 356 | /MRSS/T_RM_RSORD | Refurbishment order indicator (PM) | ||
| 357 | /MRSS/T_RM_SALES_PC_NW | Sales Profit Center | ||
| 358 | /MRSS/T_RM_SCOPE_CV | Object Class | ||
| 359 | /MRSS/T_RM_SCRTP | Scenario or Subscreen Category | ||
| 360 | /MRSS/T_RM_SERV_PHASE_NW | Resource Management Service Phase | ||
| 361 | /MRSS/T_RM_SICHZ | Float after production (in days) | ||
| 362 | /MRSS/T_RM_SICHZ_TRM | Scheduled float after production in days | ||
| 363 | /MRSS/T_RM_SPLIT_STAT | Status of an order in a split hierarchy | ||
| 364 | /MRSS/T_RM_STALT | Alternative BOM | ||
| 365 | /MRSS/T_RM_STATE_NW | State | ||
| 366 | /MRSS/T_RM_STATUS_IND_NW | STATUS Indicator | ||
| 367 | /MRSS/T_RM_STLAN | BOM Usage | ||
| 368 | /MRSS/T_RM_STLST | BOM status | ||
| 369 | /MRSS/T_RM_STLTY | BOM category | ||
| 370 | /MRSS/T_RM_STNUM | Bill of material | ||
| 371 | /MRSS/T_RM_STORT | Asset location | ||
| 372 | /MRSS/T_RM_SWERK | Maintenance plant | ||
| 373 | /MRSS/T_RM_SYSTEM_INFO_NW | System Info | ||
| 374 | /MRSS/T_RM_TABIX_D | Field defined as in SY-TABIX | ||
| 375 | /MRSS/T_RM_TERHW | Scheduling note from order scheduling | ||
| 376 | /MRSS/T_RM_TERMKZ | Scheduling type | ||
| 377 | /MRSS/T_RM_TERMKZP | Scheduling type (forecast) | ||
| 378 | /MRSS/T_RM_TERMKZ_TXT | Schd.typeDescription of scheduling type | ||
| 379 | /MRSS/T_RM_TERMKZ_TXT | Schd.typeDescription of scheduling type | ||
| 380 | /MRSS/T_RM_TMBAS_TX | Description of the planning type | ||
| 381 | /MRSS/T_RM_TPLNR | Functional Location | ||
| 382 | /MRSS/T_RM_TRMDT | Date of the last scheduling | ||
| 383 | /MRSS/T_RM_TXCHG | Indicator: long text changed | ||
| 384 | /MRSS/T_RM_TXJCD | Tax Jurisdiction | ||
| 385 | /MRSS/T_RM_TYPKZ | Category of object causing the load (order category) | ||
| 386 | /MRSS/T_RM_USCREENCTL_DATACHGD | Data Was Changed in the Controls on the User Screen | ||
| 387 | /MRSS/T_RM_VAGRP | Responsible planner group/department | ||
| 388 | /MRSS/T_RM_VAGRP | Responsible planner group/department | ||
| 389 | /MRSS/T_RM_VANTW | Person/Group responsible for the network | ||
| 390 | /MRSS/T_RM_VERSION_NW | Version | ||
| 391 | /MRSS/T_RM_VKORG | Sales Organization | ||
| 392 | /MRSS/T_RM_VORAB_SM | Advance Shipment Indicator | ||
| 393 | /MRSS/T_RM_VORGZ | Float before production (in days) | ||
| 394 | /MRSS/T_RM_VORGZ_TRM | Scheduled float before production in days | ||
| 395 | /MRSS/T_RM_VSINACT | Version inactive indicator | ||
| 396 | /MRSS/T_RM_VSNMR_V | Sales document version number | ||
| 397 | /MRSS/T_RM_WAPOS | Maintenance item | ||
| 398 | /MRSS/T_RM_WARPL | Maintenance Plan | ||
| 399 | /MRSS/T_RM_WEGXX | Path (for multi-level BOM explosions) | ||
| 400 | /MRSS/T_RM_WEGXX | Path (for multi-level BOM explosions) | ||
| 401 | /MRSS/T_RM_WERGW | Plant associated with main work center | ||
| 402 | /MRSS/T_RM_WERKS_D | plant | ||
| 403 | AD_ADDRNUM | Address number | ||
| 404 | AENNR | Change Number | ||
| 405 | ANLN1 | Main Asset Number | ||
| 406 | ANLN2 | Asset Subnumber | ||
| 407 | AUFEX | External order number | ||
| 408 | AUFKOSTV | Responsible cost center | ||
| 409 | AUFNR | Order Number | ||
| 410 | AUFNR | Order Number | ||
| 411 | AUFNR | Order Number | ||
| 412 | AUFUSER0 | Applicant | ||
| 413 | AUFUSER1 | Applicant's telephone number | ||
| 414 | AUFUSER2 | Person Responsible | ||
| 415 | AUFUSER3 | Telephone number of person in charge | ||
| 416 | AUFUSER4 | Estimated total costs of order | ||
| 417 | AUFUSER5 | Application date | ||
| 418 | AUFUSER6 | Department | ||
| 419 | AUFUSER7 | Work Start | ||
| 420 | AUFUSER8 | End of Work | ||
| 421 | AUFUSER9 | Identifier for work permit issued | ||
| 422 | BASMN | Base quantity | ||
| 423 | BASMN | Base quantity | ||
| 424 | BEMOT | Accounting Indicator | ||
| 425 | BUKRS | Company Code | ||
| 426 | CADNR | Addresses: Address Number | ||
| 427 | CC_CONF_KEY | Identical object | ||
| 428 | CHAR1 | Single-Character Flag | ||
| 429 | CHAR24 | Character field length 24 | ||
| 430 | CO_POSNR | Order item number | ||
| 431 | C_TIME | Time created | ||
| 432 | FKBER | Functional Area | ||
| 433 | FLAG | General Flag | ||
| 434 | FLAG | General Flag | ||
| 435 | GSBER | Business Area | ||
| 436 | IM_ABUKRS | Requesting company code | ||
| 437 | JV_ETYPE | Equity type | ||
| 438 | JV_NAME | Joint venture | ||
| 439 | JV_RECIND | Recovery Indicator | ||
| 440 | KDPOS | Item number in Sales Order | ||
| 441 | KOKRS | Controlling Area | ||
| 442 | KOSTL | Cost Center | ||
| 443 | KUNNR | Customer Number | ||
| 444 | MANDT | Client | ||
| 445 | MATNR | Material Number | ||
| 446 | MEINS | Base Unit of Measure | ||
| 447 | MEINS | Base Unit of Measure | ||
| 448 | OBJEKTID | Object ID | ||
| 449 | PERNR_D | Personnel Number | ||
| 450 | PERNR_D | Personnel Number | ||
| 451 | PERNR_D | Personnel Number | ||
| 452 | PERNR_D | Personnel Number | ||
| 453 | PERNR_D | Personnel Number | ||
| 454 | PERNR_D | Personnel Number | ||
| 455 | PLVAR | Plan Version | ||
| 456 | POSNR | Item number of the SD document | ||
| 457 | POSNR | Item number of the SD document | ||
| 458 | PRCTR | Profit Center | ||
| 459 | PRREG | Checking rule for the availability check | ||
| 460 | PS_AKSTL | Requesting cost center | ||
| 461 | PS_PSP_PNR | Work Breakdown Structure Element (WBS Element) | ||
| 462 | SPART | Division | ||
| 463 | TEXT40 | Text, 40 Characters Long | ||
| 464 | TIMESTAMPL | UTC Time Stamp in Long Form (YYYYMMDDhhmmssmmmuuun) | ||
| 465 | TZNTSTMPLL | Time Stamp - Long Format | ||
| 466 | TZNTSTMPLL | Time Stamp - Long Format | ||
| 467 | VBELN | Sales and Distribution Document Number | ||
| 468 | VKORG | Sales Organization | ||
| 469 | VSNMR | Number or description of a version | ||
| 470 | VTWEG | Distribution Channel | ||
| 471 | XFELD | Checkbox | ||
| 472 | XFELD | Checkbox | ||
| 473 | XFELD | Checkbox |