SAP ABAP Data Element /MRSS/T_RM_PLGKZ (Identifier for planning with line items)
Hierarchy
☛
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
⤷ PM-WOC-CP (Application Component) Capacity and Resource Planning
⤷ /MRSS/RMI_NW (Package) RM Integration Layer
⤷ PM-WOC-CP (Application Component) Capacity and Resource Planning
⤷ /MRSS/RMI_NW (Package) RM Integration Layer
Basic Data
Data Element | /MRSS/T_RM_PLGKZ |
Short Description | Identifier for planning with line items |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | CHAR1 | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | PLAN_WITH_LINE_ITEMS | |
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Plan LI |
Medium | 15 | Plan line items |
Long | 20 | Plan line items |
Heading | 3 | PLI |
Documentation
Definition
Specifies whether plan line items (that is, planning change documents) are written during order planning.
In general, line items (change documents) are not written during planning to avoid the volume of data growing unnecessarily. However, if you want to be able to track changes to planned values, you must select this indicator.
"X" = Write plan line items
" " = Do not write plan line items
History
Last changed by/on | SAP | 20141109 |
SAP Release Created in | 700 |