SAP ABAP Data Element /MRSS/T_RM_PS_KZERB (Indicator: Project summarization via master data charact.)
Hierarchy
☛
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
⤷ PM-WOC-CP (Application Component) Capacity and Resource Planning
⤷ /MRSS/RMI_NW (Package) RM Integration Layer
⤷ PM-WOC-CP (Application Component) Capacity and Resource Planning
⤷ /MRSS/RMI_NW (Package) RM Integration Layer
Basic Data
Data Element | /MRSS/T_RM_PS_KZERB |
Short Description | Indicator: Project summarization via master data charact. |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | XFELD | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | ProjS MsD |
Medium | 18 | Proj. summ. MastDa |
Long | 20 | Proj. summ. MastData |
Heading | 35 | Proj. summ. master data character. |
Documentation
Definition
If this indicator is selected, the project is summarized using the master data characteristics.
If the indicator is not selected, the project is summarized by means of classification.
We recommend that you use summarization by master data characteristics. In the medium-term, summarization by classification will no longer be supported.
History
Last changed by/on | SAP | 20141109 |
SAP Release Created in | 700 |