SAP ABAP Data Element /MRSS/T_RM_SICHZ_TRM (Scheduled float after production in days)
Hierarchy
☛
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
⤷
PM-WOC-CP (Application Component) Capacity and Resource Planning
⤷
/MRSS/RMI_NW (Package) RM Integration Layer

⤷

⤷

Basic Data
Data Element | /MRSS/T_RM_SICHZ_TRM |
Short Description | Scheduled float after production in days |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | DEC6 | |
Data Type | DEC | Counter or amount field with comma and sign |
Length | 6 | |
Decimal Places | 0 | |
Output Length | 7 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Float a. p |
Medium | 15 | Flt after prod. |
Long | 20 | Sched.flt after prod |
Heading | 10 | Float a. p |
Documentation
Definition
Number of days actually calculated as the float after production during scheduling.
Dependencies
- When reduction measures are implemented, the scheduled float after production may be smaller than that specified by the user.
- If no reduction measures have been implemented, the scheduled float after production is the same as that specified by the user.
History
Last changed by/on | SAP | 20141109 |
SAP Release Created in | 700 |