SAP ABAP Data Element /MRSS/T_RM_PS_TERMBAS (Set of dates for network)
Hierarchy
☛
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
⤷
PM-WOC-CP (Application Component) Capacity and Resource Planning
⤷
/MRSS/RMI_NW (Package) RM Integration Layer
⤷
⤷
Basic Data
| Data Element | /MRSS/T_RM_PS_TERMBAS |
| Short Description | Set of dates for network |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | CHAR1 | |
| Data Type | CHAR | Character String |
| Length | 1 | |
| Decimal Places | 0 | |
| Output Length | 1 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | ||
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | Plang.type |
| Medium | 15 | Planning type |
| Long | 20 | Planning type |
| Heading | 5 | PlTyp |
Documentation
Definition
Set of dates for planning in the network
Use
You can maintain different dates for the operations in the network:
During processing, you can change the set of dates using the function in the Edit menu and maintain the relevant dates for the operations.
Dependencies
Scheduling always uses the dates that you specified.
History
| Last changed by/on | SAP | 20141109 |
| SAP Release Created in | 700 |