SAP ABAP Data Element /MRSS/T_RM_VORGZ_TRM (Scheduled float before production in days)
Hierarchy
☛
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
⤷
PM-WOC-CP (Application Component) Capacity and Resource Planning
⤷
/MRSS/RMI_NW (Package) RM Integration Layer
⤷
⤷
Basic Data
| Data Element | /MRSS/T_RM_VORGZ_TRM |
| Short Description | Scheduled float before production in days |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | DEC6 | |
| Data Type | DEC | Counter or amount field with comma and sign |
| Length | 6 | |
| Decimal Places | 0 | |
| Output Length | 7 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | ||
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | FltBfProd |
| Medium | 15 | Float bef. prod |
| Long | 20 | Schd.flt before prod |
| Heading | 10 | FltBfProd |
Documentation
Definition
Number of days actually calculated as the float before production during scheduling.
Dependencies
- If reduction measures have been taken, the scheduled float before production may be smaller than that specified by the user.
- If no reduction measures have been taken, the scheduled float before production is the same as that specified by the user.
History
| Last changed by/on | SAP | 20141109 |
| SAP Release Created in | 700 |