SAP ABAP Data Element /MRSS/T_RM_AUFIDAT2 (Technical completion date)
Hierarchy
☛
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
⤷ PM-WOC-CP (Application Component) Capacity and Resource Planning
⤷ /MRSS/RMI_NW (Package) RM Integration Layer
⤷ PM-WOC-CP (Application Component) Capacity and Resource Planning
⤷ /MRSS/RMI_NW (Package) RM Integration Layer
Basic Data
Data Element | /MRSS/T_RM_AUFIDAT2 |
Short Description | Technical completion date |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | /MRSS/_DATUM | |
Data Type | DATS | Date field (YYYYMMDD) stored as char(8) |
Length | 8 | |
Decimal Places | 0 | |
Output Length | 10 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | TechCompl. |
Medium | 15 | Tech.completion |
Long | 20 | Technical completion |
Heading | 10 | TechCompl. |
Documentation
Definition
Date on which the order was indicated as technically completed
Use
- If the order is an investment measure:
- Settlement to the completed asset(s) is carried out only when the order is technically completed and the date of technical completion is within the settlement period or earlier.
- The technical completion date is proposed as the reference date if no other reference date is defined in the settlement rule in the settlement parameters, and if no reference date was specified during settlement.
- If the order has a results analysis key but no revenue indicator:
- The actual costs are settled only if the "Technically Completed" status is set and the date of technical completion is in the settlement period or earlier.
Dependencies
History
Last changed by/on | SAP | 20141109 |
SAP Release Created in | 700 |