SAP ABAP Data Element /MRSS/T_RM_CO_PSTARTD (StartOutline start of collective network (date))
Hierarchy
☛
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
⤷
PM-WOC-CP (Application Component) Capacity and Resource Planning
⤷
/MRSS/RMI_NW (Package) RM Integration Layer

⤷

⤷

Basic Data
Data Element | /MRSS/T_RM_CO_PSTARTD |
Short Description | StartOutline start of collective network (date) |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | /MRSS/_DATUM | |
Data Type | DATS | Date field (YYYYMMDD) stored as char(8) |
Length | 8 | |
Decimal Places | 0 | |
Output Length | 10 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Start |
Medium | 15 | Start |
Long | 20 | Start |
Heading | 11 | Outl. start |
Documentation
Definition
Start date that the user specifies to schedule:
- A subtree within a collective order
- The entire collective order
Use
During the scheduling run, the system attempts to schedule all of the affected orders within the defined date range.
Dependencies
To adhere to the date range, the basic dates of the individual orders are adjusted automatically.
History
Last changed by/on | SAP | 20141109 |
SAP Release Created in | 700 |