SAP ABAP Data Element /MRSS/T_RM_AWSLS (Variance Key)
Hierarchy
☛
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
⤷ PM-WOC-CP (Application Component) Capacity and Resource Planning
⤷ /MRSS/RMI_NW (Package) RM Integration Layer
⤷ PM-WOC-CP (Application Component) Capacity and Resource Planning
⤷ /MRSS/RMI_NW (Package) RM Integration Layer
Basic Data
Data Element | /MRSS/T_RM_AWSLS |
Short Description | Variance Key |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | CHAR6 | |
Data Type | CHAR | Character String |
Length | 6 | |
Decimal Places | 0 | |
Output Length | 6 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Var. key |
Medium | 15 | Variance key |
Long | 20 | Variance Key |
Heading | 6 | VarKey |
Documentation
Definition
Key that controls the variance calculation
Use
Variances can be calculated only for orders for which a variance key has been specified. This key is proposed from the costing view in the material master record.
If you have activated the scrap calculation in the variance key, the scrap value at target costs is calculated and deducted from the actual costs before the variances are calculated.
Procedure
If you work with cost object hierarchies, the cost object category determines how the variances are calculated.
- If the costs entered at the hierarchy level are distributed to the allocated orders (product cost collector or production orders), you must enter a variance key in each order so that the system can calculate variances for the assigned orders.
- If the costs entered at the hierarchy level are settled as price differences, you must enter a variance key in each cost object node and calculate total variances for the cost object hierarchy.
Examples
Dependencies
The control parameters for calculating variances are selected by means of the variance key in the order or cost object hierarchy, and a target cost version.
History
Last changed by/on | SAP | 20141109 |
SAP Release Created in | 700 |