SAP ABAP Data Element /MRSS/T_RM_AUFKALSM (Costing Sheet)
Hierarchy
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
   PM-WOC-CP (Application Component) Capacity and Resource Planning
     /MRSS/RMI_NW (Package) RM Integration Layer
Basic Data
Data Element /MRSS/T_RM_AUFKALSM
Short Description Costing Sheet  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type CHAR6    
Data Type CHAR   Character String 
Length 6    
Decimal Places 0    
Output Length 6    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Cstg Sheet 
Medium 15 Costing Sheet 
Long 20 Costing Sheet 
Heading CostSh 
Documentation

Definition

Controls how the overhead rates are calculated

Use

You have to enter a costing sheet for each object for which the system is to calculate overhead rates.

Dependencies

  • For projects, enter the costing sheet in the project profile.

  • For materials, the system selects the costing sheet by means of the valuation variant.

  • For base object costing, enter the costing sheet in the master data of the base planning object.

  • For cost object IDs, the costing sheet is proposed by means of the cost object profile.

  • For sales document items with costs and revenues, the costing sheet is proposed by means of the demand class.

History
Last changed by/on SAP  20141109 
SAP Release Created in 700