SAP ABAP Data Element /MRSS/T_RM_AUFKALSM (Costing Sheet)
Hierarchy
☛
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
⤷ PM-WOC-CP (Application Component) Capacity and Resource Planning
⤷ /MRSS/RMI_NW (Package) RM Integration Layer
⤷ PM-WOC-CP (Application Component) Capacity and Resource Planning
⤷ /MRSS/RMI_NW (Package) RM Integration Layer
Basic Data
Data Element | /MRSS/T_RM_AUFKALSM |
Short Description | Costing Sheet |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | CHAR6 | |
Data Type | CHAR | Character String |
Length | 6 | |
Decimal Places | 0 | |
Output Length | 6 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Cstg Sheet |
Medium | 15 | Costing Sheet |
Long | 20 | Costing Sheet |
Heading | 6 | CostSh |
Documentation
Definition
Controls how the overhead rates are calculated
Use
You have to enter a costing sheet for each object for which the system is to calculate overhead rates.
Dependencies
- For orders, enter the costing sheet in the order master data.
- For overhead cost orders, the costing sheet can be proposed by means of a model order.
- For production orders without a quantity structure, the costing sheet can be proposed by means of a planning profile.
- For production orders, process orders, product cost collectors, maintenance orders, maintenance plan orders, and service orders, the costing sheet is proposed by means of a valuation variant.
- You define the valuation variant in the costing variant, which you specify as the default value for each order type and plant.
- For cost centers, enter the costing sheet in the master data.
- For business processes, enter the costing sheet in the master data.
- For projects, enter the costing sheet in the project profile.
- For materials, the system selects the costing sheet by means of the valuation variant.
- For base object costing, enter the costing sheet in the master data of the base planning object.
- For cost object IDs, the costing sheet is proposed by means of the cost object profile.
- For sales document items with costs and revenues, the costing sheet is proposed by means of the demand class.
History
Last changed by/on | SAP | 20141109 |
SAP Release Created in | 700 |