SAP ABAP Data Element /MRSS/T_RM_NEND_TRM (Scheduled finish date of collective order (date))
Hierarchy
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
   PM-WOC-CP (Application Component) Capacity and Resource Planning
     /MRSS/RMI_NW (Package) RM Integration Layer
Basic Data
Data Element /MRSS/T_RM_NEND_TRM
Short Description Scheduled finish date of collective order (date)  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type /MRSS/_DATUM    
Data Type DATS   Date field (YYYYMMDD) stored as char(8) 
Length 8    
Decimal Places 0    
Output Length 10    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Finish 
Medium 15 Scheduled fin. 
Long 20 Scheduled finish 
Heading 10 Sched.fin 
Documentation

Definition

Date on which processing of the latest order within the order network is to be completed

Dependencies

This date is the latest of all basic end dates in the order network (or in the subtree of the order network). It is calculated by the system.

History
Last changed by/on SAP  20141109 
SAP Release Created in 700