SAP ABAP Data Element /MRSS/T_RM_NPLDA (Next planned date)
Hierarchy
☛
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
⤷ PM-WOC-CP (Application Component) Capacity and Resource Planning
⤷ /MRSS/RMI_NW (Package) RM Integration Layer
⤷ PM-WOC-CP (Application Component) Capacity and Resource Planning
⤷ /MRSS/RMI_NW (Package) RM Integration Layer
Basic Data
Data Element | /MRSS/T_RM_NPLDA |
Short Description | Next planned date |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | /MRSS/_DATUM | |
Data Type | DATS | Date field (YYYYMMDD) stored as char(8) |
Length | 8 | |
Decimal Places | 0 | |
Output Length | 10 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | PlanDate |
Medium | 15 | Planned Date |
Long | 20 | Planned Date |
Heading | 10 | PlanDate |
Documentation
Definition
The next planned date describes the time at which a maintenance task, such as a maintenance order, is to be carried out
Hinweis
If, during key-date scheduling, a date for which no factory calendar is maintained is identified, the system calculates a planned date according to the gregorian calendar.
The planned date is affected by the buffer.
History
Last changed by/on | SAP | 20141109 |
SAP Release Created in | 700 |