Data Element list used by SAP ABAP Table PSHLP_TREX_NTWK_ST (Network structure for TREX)
SAP ABAP Table PSHLP_TREX_NTWK_ST (Network structure for TREX) is using
# Object Type Object Name Object Description Note
     
1 Data Element  ABGR_SCHL Results Analysis Key
2 Data Element  ACTCMB_DELE Status Combination
3 Data Element  ADCOMPARE PM/PS Reference Element
4 Data Element  AD_ADDRNUM Address number
5 Data Element  AEKNZ Change indicator
6 Data Element  AEKNZ Change indicator
7 Data Element  AEKNZ Change indicator
8 Data Element  AEKNZ Change indicator
9 Data Element  AEKNZ Change indicator
10 Data Element  AEKNZ Change indicator
11 Data Element  AEKNZ Change indicator
12 Data Element  AEKNZ Change indicator
13 Data Element  AENNR Change Number
14 Data Element  AENNR Change Number
15 Data Element  AENNR Change Number
16 Data Element  AFAKT Execution Factor
17 Data Element  AM_UMWKZ Reason for environmental investment
18 Data Element  ATRKZ Request ID
19 Data Element  AUDISP_PLUS Reservation Relevance/Generation of Purchase Requisition
20 Data Element  AUFABKRS Processing group
21 Data Element  AUFAEDAT Change date for Order Master
22 Data Element  AUFAENAM Last changed by
23 Data Element  AUFANFNR Requesting order
24 Data Element  AUFART Order Type
25 Data Element  AUFASTNR Order status
26 Data Element  AUFERFDAT Created on
27 Data Element  AUFERFNAM Entered by
28 Data Element  AUFESTNR Status reached so far
29 Data Element  AUFEX External order number
30 Data Element  AUFIDAT1 Release date
31 Data Element  AUFIDAT2 Technical completion date
32 Data Element  AUFIDAT3 Close date
33 Data Element  AUFKALSM Costing Sheet
34 Data Element  AUFKOSTL Cost center for basic settlement
35 Data Element  AUFKOSTV Responsible cost center
36 Data Element  AUFKSTAR Settlement cost element
37 Data Element  AUFLOEKZ Deletion flag
38 Data Element  AUFLTEXT Long Text Exists
39 Data Element  AUFNR Order Number
40 Data Element  AUFPDAT1 Planned release date
41 Data Element  AUFPDAT2 Planned completion date
42 Data Element  AUFPDAT3 Planned closing date
43 Data Element  AUFPHAS0 Phase "Order created"
44 Data Element  AUFPHAS1 Phase "Order released"
45 Data Element  AUFPHAS2 Phase "order completed"
46 Data Element  AUFPHAS3 Phase "order closed"
47 Data Element  AUFREFNR Reference order number
48 Data Element  AUFSAKNR G/L account for basic settlement
49 Data Element  AUFSEQNR Sequence number
50 Data Element  AUFSETNM Allocation set
51 Data Element  AUFSOWRK Location plant
52 Data Element  AUFSPSET Group of disallowed transactions
53 Data Element  AUFSTDAT Date of last status change
54 Data Element  AUFSTKZ Identifier for statistical order
55 Data Element  AUFSTORT Location
56 Data Element  AUFTEXT Description
57 Data Element  AUFTYP Order category
58 Data Element  AUFUSER0 Applicant
59 Data Element  AUFUSER1 Applicant's telephone number
60 Data Element  AUFUSER2 Person Responsible
61 Data Element  AUFUSER3 Telephone number of person in charge
62 Data Element  AUFUSER4 Estimated total costs of order
63 Data Element  AUFUSER5 Application date
64 Data Element  AUFUSER6 Department
65 Data Element  AUFUSER7 Work Start
66 Data Element  AUFUSER8 End of Work
67 Data Element  AUFUSER9 Identifier for work permit issued
68 Data Element  AUFWAERS Order Currency
69 Data Element  AUFZSCHL Overhead key
70 Data Element  AUKBED Indicator: Calculate capacity requirements
71 Data Element  AVOUEB Indicator: Display operation overview
72 Data Element  AWSLS Variance Key
73 Data Element  BASMN Base quantity
74 Data Element  BASMN Base quantity
75 Data Element  BASMN Base quantity
76 Data Element  BEDID ID of the capacity requirements record
77 Data Element  BEDID ID of the capacity requirements record
78 Data Element  BEDID ID of the capacity requirements record
79 Data Element  BEMOT Accounting Indicator
80 Data Element  BOOLE_D Data element for domain BOOLE: TRUE (='X') and FALSE (=' ')
81 Data Element  BOOLE_D Data element for domain BOOLE: TRUE (='X') and FALSE (=' ')
82 Data Element  BREAKS Indicator: Scheduling allowing for breaks
83 Data Element  BUKRS Company Code
84 Data Element  CCKEY Cost collector key
85 Data Element  CCOBJID Object ID
86 Data Element  CC_CONF_KEY Identical object
87 Data Element  CHAR25 User field for cluster PC (national)
88 Data Element  CHAR25 User field for cluster PC (national)
89 Data Element  CHAR30 30 Characters
90 Data Element  CHAR30 30 Characters
91 Data Element  CHAR40 Character field of length 40
92 Data Element  CHAR40 Character field of length 40
93 Data Element  CIM_COUNT Internal counter
94 Data Element  CIM_COUNT Internal counter
95 Data Element  CIM_COUNT Internal counter
96 Data Element  CKML_F_PROCNR Production Process
97 Data Element  CKML_PROZESS_TYP Process Category (Procurement/Consumption)
98 Data Element  CK_KALNR Cost Estimate Number for Cost Est. w/o Qty Structure
99 Data Element  CK_KLVAR Costing Variant
100 Data Element  CK_LOSGR Costing lot size
101 Data Element  CN_COSTUPD Costs are updated
102 Data Element  COMP_CALC Indicator: Components will not be costed
103 Data Element  CO_ABARB Confirmation: Degree of processing
104 Data Element  CO_APLZL General counter for order
105 Data Element  CO_APRIO Order priority
106 Data Element  CO_APROZ Scrap percentage
107 Data Element  CO_APROZ Scrap percentage
108 Data Element  CO_ASTEX User status active
109 Data Element  CO_ASTTX Field displaying user status
110 Data Element  CO_AUCOST Indicator: Cost automatically
111 Data Element  CO_AUFLD Date of BOM Explosion/Routing Transfer
112 Data Element  CO_AUFPL Routing number of operations in the order
113 Data Element  CO_AUFPL Routing number of operations in the order
114 Data Element  CO_AUTERM Indicator: Schedule automatically
115 Data Element  CO_CHG_TIME Changed at
116 Data Element  CO_COLORDPRC Collective order with/without automatic goods movement
117 Data Element  CO_DISPO MRP controller for the order
118 Data Element  CO_FLGMD FAUF: Reading of master data executed
119 Data Element  CO_FREIKZ Indicator: Release order immediately
120 Data Element  CO_FTRMI Actual release date
121 Data Element  CO_FTRMP Planned release date
122 Data Element  CO_FTRMS Scheduled release date
123 Data Element  CO_FTRPS Scheduled release date (forecast)
124 Data Element  CO_GETRI Confirmed Order Finish Date
125 Data Element  CO_GEUZI Confirmed order finish (time)
126 Data Element  CO_GIAMG Expected variance from planned qty to be delivered to stock
127 Data Element  CO_GLTPP Finish date (forecast)
128 Data Element  CO_GLTPS Scheduled forecast finish
129 Data Element  CO_GLTRI Actual finish date
130 Data Element  CO_GLTRP Basic finish date
131 Data Element  CO_GLTRS Scheduled finish
132 Data Element  CO_GLUPP Forecast finish (time)
133 Data Element  CO_GLUPS Scheduled forecast finish time
134 Data Element  CO_GLUZP Basic finish (time)
135 Data Element  CO_GLUZS Scheduled finish time
136 Data Element  CO_GSBTR Overall commitment date
137 Data Element  CO_GSTPP Forecast start date
138 Data Element  CO_GSTPS Scheduled forecast start
139 Data Element  CO_GSTRI Actual start date
140 Data Element  CO_GSTRS Scheduled start
141 Data Element  CO_GSUPP Forecast start (time)
142 Data Element  CO_GSUPS Scheduled start time (Forecast)
143 Data Element  CO_GSUZI Actual start time
144 Data Element  CO_GSUZP Basic start time
145 Data Element  CO_GSUZS Scheduled Start (Time)
146 Data Element  CO_GWEMG Delivered quantity
147 Data Element  CO_IASMG Scrap confirmed for order
148 Data Element  CO_IGMNG Yield confirmed from order confirmation
149 Data Element  CO_INS_TIME Time created
150 Data Element  CO_KDAUF Sales order number
151 Data Element  CO_KDPOS Sales order item
152 Data Element  CO_KONSI Selection: Consignment stock
153 Data Element  CO_KONTI Account assignment
154 Data Element  CO_KORRK Order conversion with the possibility of making corrections
155 Data Element  CO_KSTEMPF Indicator: Direct cost collector
156 Data Element  CO_LAUFNR Leading order in current processing
157 Data Element  CO_LEIHG Selection: Returnable packaging
158 Data Element  CO_LKNOT Left node in collective order
159 Data Element  CO_LTEXT Long text exists
160 Data Element  CO_MATNR Material Number for Order
161 Data Element  CO_MATXT Material description
162 Data Element  CO_MBAUGR Superior assembly
163 Data Element  CO_MES_INT_ROUTINGID Key of a Routing from an ME System
164 Data Element  CO_MES_MAX_GAMNG Maximum Value of Total Order Quantity After Distribution
165 Data Element  CO_MIMEZ Expected yield variance
166 Data Element  CO_MLTPS Order with multiple items
167 Data Element  CO_NAUCOST Indicator: Do not cost automatically
168 Data Element  CO_NAUTERM Indicator: Do not schedule automatically
169 Data Element  CO_NOPCOST Do not calculate planned costs for order
170 Data Element  CO_PENDD Outline finish of collective order (date)
171 Data Element  CO_PENDT Outline finish time
172 Data Element  CO_PLAFKZ Indicator: Convert planned order with RSNUM
173 Data Element  CO_PLAUF Date for routing transfer
174 Data Element  CO_POSNR Order item number
175 Data Element  CO_POSNR Order item number
176 Data Element  CO_PRMBD Check with requirements
177 Data Element  CO_PRODNET Indicator: Order is part of collective order
178 Data Element  CO_PRODPRF Production Scheduling Profile
179 Data Element  CO_PSTARTD Outline start of collective network (date)
180 Data Element  CO_PSTARTT Start time of a collective order
181 Data Element  CO_RGEKZ Indicator: Backflushing for order
182 Data Element  CO_RKNOT Right node of a collective order
183 Data Element  CO_RUECK Completion confirmation number for the operation
184 Data Element  CO_SDATB To selection date
185 Data Element  CO_SDATV From selection date
186 Data Element  CO_STTXT System Status
187 Data Element  CO_TEILNET Number of superior network
188 Data Element  CO_TM_FREI Indicator: Order is (partially) released
189 Data Element  CO_TM_TABG Indicator: Order is technically completed
190 Data Element  CO_UMSKZ Indicator: Collective conversion of planned orders
191 Data Element  CO_UPTER Indicator: Change to Scheduled Dates
192 Data Element  CO_VFMNG Committed quantity for order acc. to ATP check components
193 Data Element  CREA_APL Application code, where the order/network was created
194 Data Element  CR_OBJID Object ID of the resource
195 Data Element  CR_OBJID Object ID of the resource
196 Data Element  CR_OBJTY Object types of the CIM resource
197 Data Element  CR_OBJTY Object types of the CIM resource
198 Data Element  CSPLIT Apportionment structure
199 Data Element  CUOBJ Configuration (internal object number)
200 Data Element  CY_SEQNR Seq. number order
201 Data Element  DATUV Valid-From Date
202 Data Element  DATUV Valid-From Date
203 Data Element  DZKRIZ Counter for additional criteria
204 Data Element  FEVOR Production Supervisor
205 Data Element  FHORI Scheduling Margin Key for Floats
206 Data Element  FKBER Functional Area
207 Data Element  FLAG General Flag
208 Data Element  FLAG General Flag
209 Data Element  FLGSER Serial Number with Incomplete Equipment
210 Data Element  FLG_ADDR Ind: Address update must be called up
211 Data Element  FLG_AOB Indicator: relationships
212 Data Element  FLG_ARBEI Indicator: Default value work is relevant
213 Data Element  FLG_CALC Indicator: Order (network etc.) still to be calculated
214 Data Element  FLG_DIRECT Indicator: Direct function call
215 Data Element  FLG_LFINF Ind.: Book delivery information
216 Data Element  FLG_LVS Indicator: WM relevant change made
217 Data Element  FLG_PARENT Indicator: Order has dependent orders
218 Data Element  FLG_PRINT Indicator: Order still to be printed (internal field)
219 Data Element  FLG_RUCK Ind: Confirmation to be saved
220 Data Element  FLG_SERV Ind: Services must be updated
221 Data Element  FLG_TERDIA Indicator: Refill dialog table for scheduling
222 Data Element  FLG_TERM Indicator: Scheduling must take data changes into account
223 Data Element  FLG_TRME Indicator: Scheduling is carried out at least once
224 Data Element  FLG_TRMV Indicator: Operation changes relevant to scheduling
225 Data Element  FREIZ Release period (in days)
226 Data Element  GAMNG Total order quantity
227 Data Element  GASMG Total scrap quantity in the order
228 Data Element  GSBER Business Area
229 Data Element  HISTU Level (in Multi-Level BOM Explosions)
230 Data Element  IM_ABUKRS Requesting company code
231 Data Element  IM_PROFIL Investment measure profile
232 Data Element  IM_SIZECL Scale of investment objects
233 Data Element  IZWEK Reason for investment
234 Data Element  J_OBJNR Object number
235 Data Element  KALKVARIST Costing variant for actual costs
236 Data Element  KALKVARPLN Costing variant for planned costs
237 Data Element  KALSMA_CH Search procedure for batch determination
238 Data Element  KAPPL Application
239 Data Element  KAPT_SICHZ Remaining float after finite scheduling
240 Data Element  KAPT_VORGZ Float (bef. production) remaining after finite scheduling
241 Data Element  KAPVERSA Version of Available Capacity
242 Data Element  KBED_D Ind: do not create capacity requirements
243 Data Element  KDAUF Sales Order Number
244 Data Element  KDPOS Item number in Sales Order
245 Data Element  KOKRS Controlling Area
246 Data Element  KVEWE Usage of the Condition Table
247 Data Element  KZAVC Indicator for type of availability check
248 Data Element  K_SALDO Order balance in controlling-area currency
249 Data Element  LD_LINE Line hierarchy
250 Data Element  LOAD_DATE Date on Which Data Was Cached in TREX-Based Cache
251 Data Element  LOAD_UNAME User Who Loaded Data in TREX-Based Cache
252 Data Element  LOGSYSTEM Logical System
253 Data Element  LOSBS To Lot Size
254 Data Element  LOSDIV Lot size divisor
255 Data Element  LOSGRBIS To lot size
256 Data Element  LOSGRVON From Lot Size
257 Data Element  LOSVN From Lot Size
258 Data Element  MATNR Material Number
259 Data Element  MATNR Material Number
260 Data Element  MAUFNR Number of superior order
261 Data Element  MEINS Base Unit of Measure
262 Data Element  MEINS Base Unit of Measure
263 Data Element  MEINS Base Unit of Measure
264 Data Element  NEND_IST Actual finish for collective order (date)
265 Data Element  NEND_TRM Scheduled finish date of collective order (date)
266 Data Element  NENT_IST Actual finish collective order (time)
267 Data Element  NENT_TRM Scheduled finish collective order (time)
268 Data Element  NETZKONT Indicator for the account assignment of a network(hdr/act.)
269 Data Element  NETZ_UEBER Superior network number
270 Data Element  NO_DISP_PLUS Effective for Materials Planning
271 Data Element  NPLDA Next planned date
272 Data Element  NSTART_IST Actual start collective order (date)
273 Data Element  NSTART_TRM Scheduled start date of collective order (date)
274 Data Element  NSTT_IST Actual start collective order (time)
275 Data Element  NSTT_TRM Scheduled start collective order (time)
276 Data Element  NWART Type of network
277 Data Element  OBJEKTID Object ID
278 Data Element  OCM_CH_PROC Process that has lead to the change of an object
279 Data Element  OCM_OBJ_TYPE Change indicator
280 Data Element  O_SALDO Order balance in order currency
281 Data Element  PKNUM Control cycle number
282 Data Element  PKOSA_D Cost collector for production process PROCNR
283 Data Element  PKPOS Kanban item number / control cycle item
284 Data Element  PLART_TX Description of the basis for scheduling
285 Data Element  PLGKZ Identifier for planning with line items
286 Data Element  PLINT Indicator for Integrated Planning
287 Data Element  PLNAL Group Counter
288 Data Element  PLNAW Application of the task list
289 Data Element  PLNME Task list unit of measure
290 Data Element  PLNNR Key for Task List Group
291 Data Element  PLNNR_REF Number of standard networks to be copied
292 Data Element  PLNTY Task List Type
293 Data Element  PLN_VERWE Task list usage
294 Data Element  PM_ORDGSTRP Basic Start Date
295 Data Element  PRCTR Profit Center
296 Data Element  PROFIDNZPL Network profile
297 Data Element  PROFI_TXT Text for Profile
298 Data Element  PRREG Checking rule for the availability check
299 Data Element  PRTRV Indicator: Project date definition
300 Data Element  PS_AKSTL Requesting cost center
301 Data Element  PS_EXPIRY_DATE Date from Which Cached Data Is Invalid
302 Data Element  PS_KZERB Indicator: Project summarization
303 Data Element  PS_PLART Basis for scheduling
304 Data Element  PS_PSP_ELE Work breakdown structure element (WBS element)
305 Data Element  PS_PSP_PNR Work Breakdown Structure Element (WBS Element)
306 Data Element  PS_PSP_PRO Project definition
307 Data Element  PS_SPS_ELE Standard WBS element
308 Data Element  PS_TERMBAS Set of dates for network
309 Data Element  PS_ZSCHM Interest Profile for Project/Order Interest Calculation
310 Data Element  QPLOS Inspection Lot Number
311 Data Element  REDKZ Reduction indicator for scheduling
312 Data Element  REDKZP Reduction indicator for scheduling (forecast)
313 Data Element  REDKZ_TX Description of reduction indicator
314 Data Element  REVLV Revision level
315 Data Element  RMNGA Total confirmed rework quantity
316 Data Element  RSNUM Number of reservation/dependent requirements
317 Data Element  RSNUM Number of reservation/dependent requirements
318 Data Element  RSORD Refurbishment order indicator (PM)
319 Data Element  SCOPE_CV Object Class
320 Data Element  SDATE Start Date
321 Data Element  SICHZ Float after production (in days)
322 Data Element  SICHZ_TRM Scheduled float after production in days
323 Data Element  SPLIT_STAT Status of an order in a split hierarchy
324 Data Element  STALT Alternative BOM
325 Data Element  STLAN BOM Usage
326 Data Element  STLST BOM Statuses
327 Data Element  STLTY BOM Category
328 Data Element  STNUM Bill of Material
329 Data Element  ST_KOSTL Cost center to which costs are actually posted
330 Data Element  TABIX_D Field defined as in SY-TABIX
331 Data Element  TERHW Scheduling note from order scheduling
332 Data Element  TERMKZ Scheduling type
333 Data Element  TERMKZP Scheduling type (forecast)
334 Data Element  TERMKZ_TXT Description of scheduling type
335 Data Element  TERMKZ_TXT Description of scheduling type
336 Data Element  TEXT40 Text, 40 Characters Long
337 Data Element  TIMESTAMPL UTC Time Stamp in Long Form (YYYYMMDDhhmmssmmmuuun)
338 Data Element  TMBAS_TX Description of the planning type
339 Data Element  TRMDT Date of the last scheduling
340 Data Element  TXCHG Indicator: long text changed
341 Data Element  TXJCD Tax Jurisdiction
342 Data Element  TYPKZ Type of object causing the load (order category)
343 Data Element  VAGRP Responsible planner group/department
344 Data Element  VANTW Person/Group responsible for the network
345 Data Element  VERAA_USER Person Responsible for CO Internal Order
346 Data Element  VORGZ Float before production (in days)
347 Data Element  VORGZ_TRM Scheduled float before production in days
348 Data Element  VORG_UEBER Superior activity
349 Data Element  VSNMR_V Sales document version number
350 Data Element  WEGXX Path (for Multi-Level BOM Explosions)
351 Data Element  WEGXX Path (for Multi-Level BOM Explosions)
352 Data Element  WERKS_D Plant
353 Data Element  XFELD Checkbox
354 Data Element  XFELD Checkbox
355 Data Element  XFELD Checkbox