Data Element | PLINT |
Short Description | Indicator for Integrated Planning |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | XFELD | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | PLANINTEGRATED | |
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Int.plan. |
Medium | 15 | Integ. planning |
Long | 20 | Integrated planning |
Heading | 3 | IPl |
Documentation
Definition
This indicator specifies whether an order/project participates in integrated planning or not. You define this per project profile for projects in Customizing:
For orders, you can store a default value in the order type, which you can change in the order master data when required.
Activity inputs planned in a plan-integrated order/project are updated directly on the sending cost center if 'Integrated planning with Cost Center Accounting' is activated in the version. You can then also settle plan-integrated orders/projects to cost centers.
Plan data is passed on to the profit center and the extended general ledger if both 'Integrated planning with Cost Center Accounting' and the "Integrated planning" indicator are activated in the version.
Changing the "Integrated Planning" indicator
You can change the "Integrated planning" indicator at a later date under the following conditions:
- Unit costing was never performed on the job affected. That is, no unit costing was carried out, even if it was later undone.
- Planning data was never entered on the job.
orif planning data was entered, then
- All plan values and -quantities from internal allocations must be zero. Data from primary cost planning is possible.
- The "Integrated planning" indicator may not be set in the fiscal year- dependent data from the plan version.
- No plan line items may exist.