SAP ABAP View V_OLR3_AFVX (Activity/Element for Consistency Check: AFVC, AFVV and AFVU)
Hierarchy
SAP_APPL (Software Component) Logistics and Accounting
   PS-ST (Application Component) Structures
     R3_OBJECTLINK_R3 (Package) Object Link cProjects and R/3
Basic Data
View Type D Database View 
Database View V_OLR3_AFVX  
Short Description Activity/Element for Consistency Check: AFVC, AFVV and AFVU    
Root table AFVC   Operation within an order 
Table
# Table Name Foreign Table Foreign Field Foreign DIR
1 AFVC AFVC
2 AFVV  
3 AFVU  
Join Conditions
# Table Name Field Name Negation Operator Constants Cont. line AND/OR Offset F Length Mco Field
1 AFVC MANDT JL EQ 0 0
2 AFVV MANDT JR EQ AND 0 0
3 AFVC AUFPL JL EQ 0 0
4 AFVV AUFPL JR EQ AND 0 0
5 AFVC APLZL JL EQ 0 0
6 AFVV APLZL JR EQ AND 0 0
7 AFVC MANDT JL EQ 0 0
8 AFVU MANDT JR EQ AND 0 0
9 AFVC AUFPL JL EQ 0 0
10 AFVU AUFPL JR EQ AND 0 0
11 AFVC APLZL JL EQ 0 0
12 AFVU APLZL JR EQ 0 0
                     
View Fields
# View field Table Field Maintenance Flag Key Data element Mod Short Description
1 MANDT AFVC MANDT   MANDT Client
2 AUFPL AFVC AUFPL   CO_AUFPL Routing number of operations in the order
3 APLZL AFVC APLZL   CO_APLZL General counter for order
4 PLNFL AFVC PLNFL   PLNFOLGE Sequence
5 PLNKN AFVC PLNKN   PLNKN Number of the task list node
6 PLNAL AFVC PLNAL   PLNAL Group Counter
7 PLNTY AFVC PLNTY   PLNTY Task List Type
8 VINTV AFVC VINTV   VINTV Increment between referenced operations
9 PLNNR AFVC PLNNR   PLNNR Key for Task List Group
10 ZAEHL AFVC ZAEHL   CIM_COUNT Internal counter
11 VORNR AFVC VORNR   VORNR Operation/Activity Number
12 STEUS AFVC STEUS   STEUS Control key
13 ARBID AFVC ARBID   CR_OBJID Object ID of the resource
14 PDEST AFVC PDEST   CR_PDEST Printer for shop papers
15 WERKS AFVC WERKS   WERKS_D Plant
16 KTSCH AFVC KTSCH   KTSCH Standard text key
17 LTXA1 AFVC LTXA1   LTXA1 Operation short text
18 LTXA2 AFVC LTXA2   LTXA2 Second line of the description
19 TXTSP AFVC TXTSP   SPRAS Language Key
20 VPLTY AFVC VPLTY   VPLNTY Type of the referenced task list
21 VPLNR AFVC VPLNR   VPLNNR Group of the referenced task list
22 VPLAL AFVC VPLAL   VPLNAL Group counter of the referenced task list
23 VPLFL AFVC VPLFL   VPLBFL Referenced sequence in routing
24 VGWTS AFVC VGWTS   VORGSCHL Standard value key
25 LAR01 AFVC LAR01   LSTAR Activity Type
26 LAR02 AFVC LAR02   LSTAR Activity Type
27 LAR03 AFVC LAR03   LSTAR Activity Type
28 LAR04 AFVC LAR04   LSTAR Activity Type
29 LAR05 AFVC LAR05   LSTAR Activity Type
30 LAR06 AFVC LAR06   LSTAR Activity Type
31 ZERMA AFVC ZERMA   DZERMA Type of standard value calculation
32 ZGDAT AFVC ZGDAT   DZGDAT Date when the standard value was calculated
33 ZCODE AFVC ZCODE   DZCODE Reference number for standard value code
34 ZULNR AFVC ZULNR   DZULNR Basis for standard value calculation
35 LOANZ AFVC LOANZ   LOHNANZ Number of Time Tickets
36 LOART AFVC LOART   LOHNART Wage type
37 RSANZ AFVC RSANZ   CR_RS_ANZ Number of confirmation slips
38 QUALF AFVC QUALF   QUALF Suitability
39 ANZMA AFVC ANZMA   ANZMS Number of employees
40 RFGRP AFVC RFGRP   RUEFAGRP Setup group category
41 RFSCH AFVC RFSCH   RUEFASCHLU Setup group key
42 RASCH AFVC RASCH   RUEARSCHLU Setup Type Key
43 AUFAK AFVC AUFAK   AUSCHUFAK Scrap factor
44 LOGRP AFVC LOGRP   LOHNGRP Wage group
45 UEMUS AFVC UEMUS   UEMUSKZ Required overlapping
46 UEKAN AFVC UEKAN   UEKANKZ Optional overlapping
47 FLIES AFVC FLIES   FLIESSKZ Indicator: continuous flow production
48 SPMUS AFVC SPMUS   SPLITTUNG Required splitting
49 SPLIM AFVC SPLIM   SPLITTANZ Maximum number of splits
50 ABLIPKZ AFVC ABLIPKZ   ABLIPKZ Indicator: simultaneous teardown and wait
51 RSTRA AFVC RSTRA   RSTRA Reduction strategy per operation/activity
52 SUMNR AFVC SUMNR   SUMKNTNR Node number of the superior operation
53 SORTL AFVC SORTL   SORTI Sort Term for Non-Stock Info Records
54 LIFNR AFVC LIFNR   LIFNR Account Number of Vendor or Creditor
55 PREIS AFVC PREIS   PREIS Price
56 PEINH AFVC PEINH   PEINH Price unit
57 SAKTO AFVC SAKTO   KSTAR Cost Element
58 WAERS AFVC WAERS   WAERS Currency Key
59 INFNR AFVC INFNR   INFNR Number of purchasing info record
60 ESOKZ AFVC ESOKZ   ESOKZ Purchasing info record category
61 EKORG AFVC EKORG   EKORG Purchasing organization
62 EKGRP AFVC EKGRP   VG_EKGRP Purchasing group for external processing
63 KZLGF AFVC KZLGF   KZLGF Indicator: fixed lot external processing
64 KZWRTF AFVC KZWRTF   KZWRTF Indicator: Fixed price for external processing
65 MATKL AFVC MATKL   MATKL Material Group
66 DDEHN AFVC DDEHN   DAUDEHN Indicator: flexible duration
67 ANZZL AFVC ANZZL   ANZKAP Number of capacities required
68 PRZNT AFVC PRZNT   APROZENT Work percentage
69 MLSTN AFVC MLSTN   MILESTONE Usage
70 PPRIO AFVC PPRIO   PRIORITAET Priority
71 BUKRS AFVC BUKRS   BUKRS Company Code
72 ANFKO AFVC ANFKO   ANFKO Requesting cost center
73 ANFKOKRS AFVC ANFKOKRS   ANFKOKRS Controlling area of the requesting cost center
74 INDET AFVC INDET   INDET Calculation key
75 LARNT AFVC LARNT   LSTAR Activity Type
76 PRKST AFVC PRKST   PRKST Costs in the activity
77 APLFL AFVC APLFL   PLNFOLGE Sequence
78 RUECK AFVC RUECK   CO_RUECK Completion confirmation number for the operation
79 RMZHL AFVC RMZHL   CO_RMZHL Confirmation counter
80 PROJN AFVC PROJN   PS_PSP_ELE Work breakdown structure element (WBS element)
81 OBJNR AFVC OBJNR   J_OBJNR Object number
82 SPANZ AFVC SPANZ   SPLITTERM Actual number of splits
83 BEDID AFVC BEDID   BEDID ID of the capacity requirements record
84 BEDZL AFVC BEDZL   CIM_COUNT Internal counter
85 BANFN AFVC BANFN   CO_BANFN Purchase requisition number
86 BNFPO AFVC BNFPO   CO_BNFPO Item number of the purchase requisition in the order
87 LEK01 AFVC LEK01   CO_LEIKZ Indicator: No remaining activity expected
88 LEK02 AFVC LEK02   CO_LEIKZ Indicator: No remaining activity expected
89 LEK03 AFVC LEK03   CO_LEIKZ Indicator: No remaining activity expected
90 LEK04 AFVC LEK04   CO_LEIKZ Indicator: No remaining activity expected
91 LEK05 AFVC LEK05   CO_LEIKZ Indicator: No remaining activity expected
92 LEK06 AFVC LEK06   CO_LEIKZ Indicator: No remaining activity expected
93 SELKZ AFVC SELKZ   CO_SELKZ Selection indicator for costing line items
94 KALID AFVC KALID   WFCID Factory Calendar
95 FRSP AFVC FRSP   FRSP Earliest possible activity / Latest possible activity
96 STDKN AFVC STDKN   STDKN Node of operation within reference operation set
97 ANLZU AFVC ANLZU   ANLZU Syst.Condition
98 ISTRU AFVC ISTRU   ISTRU Assembly
99 ISTTY AFVC ISTTY   STLTY BOM Category
100 ISTNR AFVC ISTNR   STNUM Bill of Material
101 ISTKN AFVC ISTKN   STLKN BOM Item Node Number
102 ISTPO AFVC ISTPO   CIM_COUNT Internal counter
103 IUPOZ AFVC IUPOZ   UPOSZ Subitem Number
104 EBORT AFVC EBORT   EBORT Installation Point for Subitem
105 VERTL AFVC VERTL   CR_VERTN Distr.cap.reqmts (plant maint.,process order, network)
106 LEKNW AFVC LEKNW   LEKNW Indicator: No Remaining Work Expected
107 NPRIO AFVC NPRIO   NW_PRIO Priority
108 PVZKN AFVC PVZKN   CO_APLZL General counter for order
109 PHFLG AFVC PHFLG   PHFLG Indicator: Phase
110 PHSEQ AFVC PHSEQ   PHSEQ Control Recipe Destination
111 KNOBJ AFVC KNOBJ   KNOBJ Number of Object with Assigned Dependencies
112 ERFSICHT AFVC ERFSICHT   QERFSICHT Recording View
113 QPPKTABS AFVC QPPKTABS   QPPKTABS Flow Variants for Inspection Point Completion
114 OTYPE AFVC OTYPE   OTYPE Object Type
115 OBJEKTID AFVC OBJEKTID   OBJEKTID Object ID
116 QLKAPAR AFVC QLKAPAR   QL_KAPART Capacity category
117 RSTUF AFVC RSTUF   RSTUF Reduction level which reduces operation lead time
118 NPTXTKY AFVC NPTXTKY   TXTKY Internal text number (12-character)
119 SUBSYS AFVC SUBSYS   QEIFSUBSYS Subsystem Identifier for QM Subsystem Interface
120 PSPNR AFVC PSPNR   PS_SPS_ELE Standard WBS element
121 PACKNO AFVC PACKNO   PACKNO Package number
122 TXJCD AFVC TXJCD   TXJCD Tax Jurisdiction
123 SCOPE AFVC SCOPE   SCOPE_CV Object Class
124 GSBER AFVC GSBER   GSBER Business Area
125 PRCTR AFVC PRCTR   PRCTR Profit Center
126 NO_DISP AFVC NO_DISP   NO_DISP_PLUS Effective for Materials Planning
127 QKZPRZEIT AFVC QKZPRZEIT   QKZPRZEIT Interval = Time (Time-Related)
128 QKZZTMG1 AFVC QKZZTMG1   QKZZTMG1 Quantity Confirmation for Each Partial Lot
129 QKZPRMENG AFVC QKZPRMENG   QKZPRMENG Creation Cycle = Quantity (Quantity-Reference)
130 QKZPRFREI AFVC QKZPRFREI   QKZPRFREI Interval Without Reference to Time or Quantity
131 KZFEAT AFVC KZFEAT   QKZFEAT Indicator Is Not Used Currently
132 QKZTLSBEST AFVC QKZTLSBEST   QKZTLSBEST Operation with Stock-Related Partial Lot Assignment
133 AENNR AFVC AENNR   AENNR Change Number
134 CUOBJ_ARB AFVC CUOBJ_ARB   CUOBJ Configuration (internal object number)
135 EVGEW AFVC EVGEW   EV_WEIGHTD Aggregation weight for POC (PS progress)
136 ARBII AFVC ARBII   CR_OBJID_I Actual operating resources object identification
137 WERKI AFVC WERKI   WERKS_I Actual plant
138 CY_SEQNRV AFVC CY_SEQNRV   CY_SEQNRV Sequence number operation
139 KAPT_PUFFR AFVC KAPT_PUFFR   KAPT_PUFFR Operation floats after finite scheduling (in seconds)
140 EBELN AFVC EBELN   EBELN Purchasing Document Number
141 EBELP AFVC EBELP   EBELP Item Number of Purchasing Document
142 WEMPF AFVC WEMPF   WEMPF Goods recipient
143 ABLAD AFVC ABLAD   ABLAD Unloading Point
144 CLASF AFVC CLASF   CLASF Ind.: Take Activity Into Account for Project Summarization
145 FRUNV AFVC FRUNV   FRUNV Indicator: External procurement data incomplete
146 ZSCHL AFVC ZSCHL   AUFZSCHL Overhead key
147 KALSM AFVC KALSM   AUFKALSM Costing Sheet
148 SCHED_END AFVC SCHED_END   SCEND_ACT Ind.: Purchase requisition at activity finish date
149 NETZKONT AFVC NETZKONT   NETZKONT Indicator for the account assignment of a network(hdr/act.)
150 OWAER AFVC OWAER   OWAERS Object currency for network activity
151 AFNAM AFVC AFNAM   AFNAM Name of requisitioner/requester
152 BEDNR AFVC BEDNR   BEDNR Requirement Tracking Number
153 KZFIX AFVC KZFIX   CN_KZFIX Indicator: Purchasing info record data are fixed
154 PERNR AFVC PERNR   CO_PERNR Personnel number
155 FRDLB AFVC FRDLB   CO_FRDLB Indicator: Externally processed op. with subcontracting
156 QPART AFVC QPART   QPART Inspection Type
157 LOEKZ AFVC LOEKZ   AUFLOEKZ Deletion flag
158 WKURS AFVC WKURS   WKURS Exchange Rate
159 PROD_ACT AFVC PROD_ACT   PROD_ACT Indicator: Activity is a production activity
160 FPLNR AFVC FPLNR   FPLNR Billing plan number / invoicing plan number
161 OBJTYPE AFVC OBJTYPE   OCM_OBJ_TYPE Change indicator
162 CH_PROC AFVC CH_PROC   OCM_CH_PROC Process that has lead to the change of an object
163 KLVAR AFVC KLVAR   CK_KLVAR Costing Variant
164 KALNR AFVC KALNR   CK_KALNR Cost Estimate Number for Cost Est. w/o Qty Structure
165 FORDN AFVC FORDN   SFORDN Framework Order
166 FORDP AFVC FORDP   FORDP Item of framework order
167 MAT_PRKST AFVC MAT_PRKST   MAT_PRKST Material planning in networks: primary costs
168 PRZ01 AFVC PRZ01   CO_PRZNR Business Process
169 RFPNT AFVC RFPNT   CN_RFPNT Reference point for BOM transfer
170 FUNC_AREA AFVC FUNC_AREA   FKBER Functional Area
171 TECHS AFVC TECHS   TECHS Parameter Variant/Standard Variant
172 MEINH AFVV MEINH   VORME Unit of measure for activity
173 UMREN AFVV UMREN   CP_UMREN Denominator for converting rtg and op units of measure
174 UMREZ AFVV UMREZ   CP_UMREZ Numerator for converting task list and oper. un. of measure
175 BMSCH AFVV BMSCH   BMSCH Base Quantity
176 ZMERH AFVV ZMERH   DZMERH Break
177 ZEIER AFVV ZEIER   DZEIER Unit for the break time
178 VGE01 AFVV VGE01   VGWRTEH Unit of measure for the standard value
179 VGW01 AFVV VGW01   VGWRT Standard Value
180 VGE02 AFVV VGE02   VGWRTEH Unit of measure for the standard value
181 VGW02 AFVV VGW02   VGWRT Standard Value
182 VGE03 AFVV VGE03   VGWRTEH Unit of measure for the standard value
183 VGW03 AFVV VGW03   VGWRT Standard Value
184 VGE04 AFVV VGE04   VGWRTEH Unit of measure for the standard value
185 VGW04 AFVV VGW04   VGWRT Standard Value
186 VGE05 AFVV VGE05   VGWRTEH Unit of measure for the standard value
187 VGW05 AFVV VGW05   VGWRT Standard Value
188 VGE06 AFVV VGE06   VGWRTEH Unit of measure for the standard value
189 VGW06 AFVV VGW06   VGWRT Standard Value
190 ZEIMU AFVV ZEIMU   DZEIMU Unit for the minimum overlap time
191 ZMINU AFVV ZMINU   DZMINU Minimum overlap time
192 MINWE AFVV MINWE   MINWEI Minimum Send-Ahead Quantity
193 ZEIMB AFVV ZEIMB   DZEIMB Unit for the minimum processing time
194 ZMINB AFVV ZMINB   DZMINB Minimum processing time
195 ZEILM AFVV ZEILM   DZEILM Unit for the maximum wait time
196 ZLMAX AFVV ZLMAX   DZLMAX Maximum wait time
197 ZEILP AFVV ZEILP   DZEILP Unit for the required wait time
198 ZLPRO AFVV ZLPRO   DZLPRO Minimum wait time
199 ZEIWN AFVV ZEIWN   DZEIWN Unit for the standard queue time
200 ZWNOR AFVV ZWNOR   DZWNOR Standard queue time
201 ZEIWM AFVV ZEIWM   DZEIWM Unit for the minumum queue time
202 ZWMIN AFVV ZWMIN   DZWMIN Minimum queue time
203 ZEITN AFVV ZEITN   DZEITN Unit for the standard move time
204 ZTNOR AFVV ZTNOR   DZTNOR Standard move time
205 ZEITM AFVV ZEITM   DZEITM Unit for the minimum move time
206 ZTMIN AFVV ZTMIN   DZTMIN Minimum move time
207 PLIFZ AFVV PLIFZ   PLIFZ Planned delivery time in days
208 DAUNO AFVV DAUNO   DAUNOR Normal duration of the activity
209 DAUNE AFVV DAUNE   DAUNORE Normal duration/unit
210 DAUMI AFVV DAUMI   DAUMIN Minimum activity duration
211 DAUME AFVV DAUME   DAUMINE Unit for the minimum duration
212 EINSA AFVV EINSA   EINSCHRA Constraint on the basic start date for the activity
213 EINSE AFVV EINSE   EINSCHRE Constraint on the finish date of the activity
214 ARBEI AFVV ARBEI   ARBEIT Work involved in the activity
215 ARBEH AFVV ARBEH   ARBEITE Unit for work
216 MGVRG AFVV MGVRG   MGVRG Operation Quantity
217 ASVRG AFVV ASVRG   ASVRG Operation scrap
218 LMNGA AFVV LMNGA   LMNGA Total Yield Confirmed
219 XMNGA AFVV XMNGA   XMNGA Total scrap quantity confirmed
220 GMNGA AFVV GMNGA   GMNGA Confirmed yield in order unit of measure
221 ISM01 AFVV ISM01   CO_RUMNG Previously confirmed activity
222 ISM02 AFVV ISM02   CO_RUMNG Previously confirmed activity
223 ISM03 AFVV ISM03   CO_RUMNG Previously confirmed activity
224 ISM04 AFVV ISM04   CO_RUMNG Previously confirmed activity
225 ISM05 AFVV ISM05   CO_RUMNG Previously confirmed activity
226 ISM06 AFVV ISM06   CO_RUMNG Previously confirmed activity
227 ISMNW AFVV ISMNW   CO_ISMNW Actual work
228 FSAVD AFVV FSAVD   FSAVD Earliest scheduled start: Execution (date)
229 FSAVZ AFVV FSAVZ   FSAVZ Earliest scheduled start: Execution (time)
230 FSSBD AFVV FSSBD   FSSBD Earliest scheduled start: Processing (date)
231 FSSBZ AFVV FSSBZ   FSSBZ Earliest scheduled start: Processing (time)
232 FSSAD AFVV FSSAD   FSSAD Earliest scheduled start: Teardown (date)
233 FSSAZ AFVV FSSAZ   FSSAZ Earliest scheduled start: Teardown (time)
234 FSEDD AFVV FSEDD   FSEDD Earliest scheduled finish: Execution (date)
235 FSEDZ AFVV FSEDZ   FSEDZ Earliest scheduled finish: Execution (time)
236 FSSLD AFVV FSSLD   FSSLD Earliest scheduled start: Wait (date)
237 FSSLZ AFVV FSSLZ   FSSLZ Earliest scheduled start: Wait (time)
238 FSELD AFVV FSELD   FSELD Earliest scheduled finish: Wait (date)
239 FSELZ AFVV FSELZ   FSELZ Earliest scheduled finish: Wait (time)
240 SSAVD AFVV SSAVD   SSAVD Latest scheduled start: Execution (date)
241 SSAVZ AFVV SSAVZ   SSAVZ Latest scheduled start: Execution (time)
242 SSSBD AFVV SSSBD   SSSBD Latest scheduled start: Processing (date)
243 SSSBZ AFVV SSSBZ   SSSBZ Latest scheduled start: Processing (time)
244 SSSAD AFVV SSSAD   SSSAD Latest scheduled start: Teardown (date)
245 SSSAZ AFVV SSSAZ   SSSAZ Latest scheduled start: Teardown (time)
246 SSEDD AFVV SSEDD   SSEDD Latest scheduled finish: Execution (date)
247 SSEDZ AFVV SSEDZ   SSEDZ Latest scheduled finish: Execution (time)
248 SSSLD AFVV SSSLD   SSSLD Latest scheduled start: Wait time (date)
249 SSSLZ AFVV SSSLZ   SSSLZ Latest scheduled start: Wait time
250 SSELD AFVV SSELD   SSELD Latest scheduled finish: Wait time (date)
251 SSELZ AFVV SSELZ   SSELZ Latest scheduled finish: Wait time
252 ISAVD AFVV ISAVD   ISAVD Actual operation start (date)
253 IEAVD AFVV IEAVD   IEAVD Actual finish of operation (date)
254 ISDD AFVV ISDD   ISDD Actual start: Execution (date)
255 ISDZ AFVV ISDZ   ISDZ Actual start: Execution/setup (time)
256 IERD AFVV IERD   IERD Actual finish: Setup (date)
257 IERZ AFVV IERZ   IERZ Actual finish: Setup (time)
258 ISBD AFVV ISBD   ISBD Actual start: Processing (date)
259 ISBZ AFVV ISBZ   ISBZ Actual start: Processing (time)
260 IEBD AFVV IEBD   IEBD Actual finish: Processing (date)
261 IEBZ AFVV IEBZ   IEBZ Actual processing finish (time)
262 ISAD AFVV ISAD   ISAD Actual start: Teardown (date)
263 ISAZ AFVV ISAZ   ISAZ Actual start: Teardown (time)
264 IEDD AFVV IEDD   IEDD Actual finish: Execution (date)
265 IEDZ AFVV IEDZ   IEDZ Actual finish: Execution (time)
266 PEDD AFVV PEDD   CO_PEDD Forecast finish date of operation from confirmation
267 PEDZ AFVV PEDZ   CO_PEDZ Forecast finish time of operation from confirmation
268 PUFFR AFVV PUFFR   PUFFR_FREI Free float
269 PUFGS AFVV PUFGS   PUFFR_GESM Total float
270 NTANF AFVV NTANF   VORGABESTD Constraint for activity start (Basic)
271 NTANZ AFVV NTANZ   VORGABESTZ Constraint for activity start time (Basic)
272 NTEND AFVV NTEND   VORGABEEND2 Constraint for Finish of Activity (Basic)
273 NTENZ AFVV NTENZ   VORGABEENZ Basic finish time of the activity
274 EWSTD AFVV EWSTD   EWSTARTD Forecasted start date for the activity
275 EWSTZ AFVV EWSTZ   EWSTARTZ Forecast start time of the activity
276 EWEND AFVV EWEND   EWENDED Forecast finish date
277 EWENZ AFVV EWENZ   EWENDEZ Forecast finish time for the activity
278 EWDAN AFVV EWDAN   EWDAN Normal duration (from forecast) of activity
279 EWDNE AFVV EWDNE   EWDNE Unit for forecast normal duration
280 EWDAM AFVV EWDAM   EWDAM Minimum duration (from forecast) for activity
281 EWDME AFVV EWDME   EWDME Unit for forecast minimum duration
282 EWSTE AFVV EWSTE   PS_RESTE Forecast date constraint on activity finish
283 EWSTA AFVV EWSTA   PS_RESTA Forecast date constraint on activity start
284 WARTZ AFVV WARTZ   WARTEZEIT Queue time used for scheduling
285 WRTZE AFVV WRTZE   WTRZE Unit of measure for queue time
286 RUEST AFVV RUEST   RUEST Setup time
287 RSTZE AFVV RSTZE   RSTZE Unit of measure for setup time
288 BEARZ AFVV BEARZ   BEARZEIT Processing time
289 BEAZE AFVV BEAZE   BEAZE Unit of measure for processing time
290 ABRUE AFVV ABRUE   ABRUE Teardown
291 ARUZE AFVV ARUZE   ARUZE Unit of measure for teardown
292 LIEGZ AFVV LIEGZ   LIEGEZEIT Wait time used for scheduling
293 LIGZE AFVV LIGZE   LIGZE Unit of measure for wait time
294 TRANZ AFVV TRANZ   TRANSZEIT Move time used for scheduling
295 TRAZE AFVV TRAZE   TRAZE Unit of measure for move time
296 ISERH AFVV ISERH   ISERH Confirmed break time
297 OFM01 AFVV OFM01   CO_SCHAETZ Forecast value used to update the standard value
298 OFM02 AFVV OFM02   CO_SCHAETZ Forecast value used to update the standard value
299 OFM03 AFVV OFM03   CO_SCHAETZ Forecast value used to update the standard value
300 OFM04 AFVV OFM04   CO_SCHAETZ Forecast value used to update the standard value
301 OFM05 AFVV OFM05   CO_SCHAETZ Forecast value used to update the standard value
302 OFM06 AFVV OFM06   CO_SCHAETZ Forecast value used to update the standard value
303 OFMNW AFVV OFMNW   OFMNW Forecasted work (actual + remaining)
304 BZOFFB AFVV BZOFFB   CP_OBZOFFB Reference date for start of sub-operation
305 EHOFFB AFVV EHOFFB   CP_OEHOFFB Unit for offset to start
306 OFFSTB AFVV OFFSTB   CP_OOFFSTB Offset to sub-operation start
307 OFFSTE AFVV OFFSTE   CP_OOFFSTE Offset to sub-operation finish
308 BZOFFE AFVV BZOFFE   CP_OBZOFFE Reference date for finish of sub-operation
309 EHOFFE AFVV EHOFFE   CP_OEHOFFE Unit for offset to finish
310 FPAVD AFVV FPAVD   FPAVD Earliest scheduled start date (forecast)
311 FPAVZ AFVV FPAVZ   FPAVZ Earliest scheduled start time (forecast)
312 FPEDD AFVV FPEDD   FPEDD Earliest scheduled finish date (forecast)
313 FPEDZ AFVV FPEDZ   FPEDZ Earliest scheduled finish time (forecast)
314 SPAVD AFVV SPAVD   SPAVD Latest scheduled start date (forecast)
315 SPAVZ AFVV SPAVZ   SPAVZ Latest scheduled start time (forecast)
316 SPEDD AFVV SPEDD   SPEDD Latest scheduled finish date (forecast)
317 SPEDZ AFVV SPEDZ   SPEDZ Latest scheduled finish time (forecast)
318 BEAZP AFVV BEAZP   BEAZEP Unit of processing time (Forecast)
319 PUFGP AFVV PUFGP   PPUFF_GESM Total float (from forecast)
320 PUFFP AFVV PUFFP   PPUFF_FREI Free float (from forecast)
321 BEARP AFVV BEARP   PBEARZEIT Processing time (forecast)
322 EPANF AFVV EPANF   EPANF Dispatched start date for operation
323 EPANZ AFVV EPANZ   EPANZ Dispatched start time for operation
324 EPEND AFVV EPEND   EPEND Dispatched finish date
325 EPENZ AFVV EPENZ   EPENZ Dispatched finish time
326 PDAU AFVV PDAU   PDAU Forecasted duration of activity from confirmation
327 PDAE AFVV PDAE   PDAE Unit of the forecasted duration from the confirmation
328 KNOTE AFVV KNOTE   KNOTE Transportation Connection Points
329 VSTZW AFVV VSTZW   VSTZW Deadline function
330 VSTGA AFVV VSTGA   VSTGA Deadline deviation reason
331 QRASTZEHT AFVV QRASTZEHT   QRASTZEHT Time Unit
332 QRASTZFAK AFVV QRASTZFAK   QRASTZFAK Time Factor
333 QRASTMENG AFVV QRASTMENG   QRASTMENG Quantity Between Two Inspections
334 QRASTEREH AFVV QRASTEREH   QRASTEREH Grid Unit of Measure
335 AUFKT AFVV AUFKT   AFAKT Execution Factor
336 RMNGA AFVV RMNGA   RMNGA Total confirmed rework quantity
337 ILE01 AFVV ILE01   CO_ISMNGEH Unit of measure for the activity to be confirmed
338 ILE02 AFVV ILE02   CO_ISMNGEH Unit of measure for the activity to be confirmed
339 ILE03 AFVV ILE03   CO_ISMNGEH Unit of measure for the activity to be confirmed
340 ILE04 AFVV ILE04   CO_ISMNGEH Unit of measure for the activity to be confirmed
341 ILE05 AFVV ILE05   CO_ISMNGEH Unit of measure for the activity to be confirmed
342 ILE06 AFVV ILE06   CO_ISMNGEH Unit of measure for the activity to be confirmed
343 RWFAK AFVV RWFAK   RWFAK Rework factor (is not used yet)
344 IPRZ1 AFVV IPRZ1   CO_IPRZS Confirmed quantity/work for business process
345 IPRE1 AFVV IPRE1   RU_IPRZE Unit of measurement for conf. quantity for business process
346 IPRK1 AFVV IPRK1   RU_IPRZK No remaining quantity expected for business process
347 TAKT AFVV TAKT   LD_TAKT takt within a line segment
348 OPRZ1 AFVV OPRZ1   OPRZ1 Remaining quantity for business process
349 OPRE1 AFVV OPRE1   OPRE1 Unit for remaining quantity of business process
350 SLWID AFVU SLWID   SLWID Key word ID for user-defined fields
351 USR00 AFVU USR00   USRCHAR20 User field with 20 characters
352 USR01 AFVU USR01   USRCHAR20 User field with 20 characters
353 USR02 AFVU USR02   USRCHAR10 User field with 10 characters
354 USR03 AFVU USR03   USRCHAR10 User field with 10 characters
355 USR04 AFVU USR04   USRQUAN13 User field for quantity (length 10.3)
356 USE04 AFVU USE04   USRUNIT User field: Unit for quantity fields
357 USR05 AFVU USR05   USRQUAN13 User field for quantity (length 10.3)
358 USE05 AFVU USE05   USRUNIT User field: Unit for quantity fields
359 USR06 AFVU USR06   USRCURR13 User-defined field for values (length 10,3)
360 USE06 AFVU USE06   USRCUKY User field: Unit for value fields
361 USR07 AFVU USR07   USRCURR13 User-defined field for values (length 10,3)
362 USE07 AFVU USE07   USRCUKY User field: Unit for value fields
363 USR08 AFVU USR08   USRDATE User field for date
364 USR09 AFVU USR09   USRDATE User field for date
365 USR10 AFVU USR10   USRFLAG User-defined field: Indicator for reports
366 USR11 AFVU USR11   USRFLAG User-defined field: Indicator for reports
367 VNAME AFVU VNAME   JV_NAME Joint venture
368 RECID AFVU RECID   JV_RECIND Recovery Indicator
369 ETYPE AFVU ETYPE   JV_ETYPE Equity type
370 JV_OTYPE AFVU JV_OTYPE   JV_OTYPE Joint Venture Object Type
371 JV_JIBCL AFVU JV_JIBCL   JV_JIBCL JIB/JIBE Class
372 JV_JIBSA AFVU JV_JIBSA   JV_JIBSA JIB/JIBE Subclass A
373 JV_OCO AFVU JV_OCO   JV_OR_CO JV original cost object
374 SPARAMETER1 AFVU SPARAMETER1   SPARAMETER Scheduling Parameters for External Scheduling
375 SPARAMETER2 AFVU SPARAMETER2   SPARAMETER Scheduling Parameters for External Scheduling
376 SPARAMETER3 AFVU SPARAMETER3   SPARAMETER Scheduling Parameters for External Scheduling
                 
Maintenance Status
Access
  read only
  read and change
  Time-dependent views: like U, validity data like ' '
  read, change, delete and insert
Delivery Class      
Data Browser/Table View Maintenance    Display/Maintenance Allowed with Restrictions  
History
Last changed by/on SAP  20130529 
SAP Release Created in 2002_1_46C