SAP ABAP Data Element SPLITTUNG (Required splitting)
Hierarchy
BBPCRM (Software Component) BBPCRM
   CRM (Application Component) Customer Relationship Management
     CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
       CP (Package) R/3 Application development: PP Task Lists
Basic Data
Data Element SPLITTUNG
Short Description Required splitting  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type XFELD    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Req.spltng 
Medium 15 Req. splitting 
Long 20 Required splitting 
Heading ReqSplt 
Documentation

Definition

You use this indicator to specify that the operation must be split for scheduling.

If you do not set it, the operation is split in reduction, if you entered splitting in the reduction strategey.

Use

The following options exist for splitting operations:

  • You can enter a maximum number of splits.

    The system distributes the lot procssing or operation processing into partial lots or amongst the individual capacities.

  • You can enter a minimum processing time

    In this economical splitting the system determines the number of splits by dividing the processing time of the operation by the minimum processing time.

In both cases the system uses at the most the number of individual capacties that are assigned to the capacity that is used for scheduling.

If you have set the required splitting indicator and have not entered either a minimum processing time or a maximum number of splits, the system distributes the lot processing or operation processing amongst the individual capacities used for scheduling.

Dependencies

An operation is only split, if you have specified via its control key that it is to be scheduled.

History
Last changed by/on SAP  19981210 
SAP Release Created in