SAP ABAP Data Element FSSAD (Earliest scheduled start: Teardown (date))
Hierarchy
BBPCRM (Software Component) BBPCRM
   CRM-CIC (Application Component) Interaction Center WinClient
     CO (Package) R/3 Application development: PP Production orders
Basic Data
Data Element FSSAD
Short Description Earliest scheduled start: Teardown (date)  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type DATUM    
Data Type DATS   Date field (YYYYMMDD) stored as char(8) 
Length 8    
Decimal Places 0    
Output Length 10    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 EarlSchDte 
Medium 15 Earl.start date 
Long 20 Earliest start date 
Heading 15 Earl.start date 
Documentation

Definition

Earliest date when processing is finished and teardown can begin.

Supplementary Documentation - FSSAD 0001

Use

The execution time of the operation is made up of a setup time, a processing time and a teardown time.

If the execution of the operation is carried out immediately (that is without making use of the queue time), then all operation segments are carried out on the earliest possible date.

Dependencies

This date is determined via lead time scheduling.

Supplementary Documentation - FSSAD 0005

Use

Date when the planning operation should be finished. The planning operation is the operation in the routing in which the scheduling work center is used.

If teardown follows then this is also the earliest date when teardown can begin.

Dependencies

The processing time contains no setup time. It forms the basis for calculating the quantity distribution.

History
Last changed by/on SAP  19981210 
SAP Release Created in