SAP ABAP Table BIW_AFVV_V (Generated Table for View)
Basic Data
Table Category VIEW    General view structure 
General view structure BIW_AFVV_V   Table Relationship Diagram
Short Description Generated Table for View    
Delivery and Maintenance
Pool/cluster      
Delivery Class      
Data Browser/Table View Maintenance     Display/Maintenance Allowed with Restrictions 
Components
     
Field Key Data Element Domain Data
Type
Length Decimal
Places
Short Description Check
table
1 MANDT MANDT MANDT CLNT 3   0   Client T000
2 PSPNR PS_INTNR PS_PSPNR NUMC 8   0   Current number for project or project item  
3 AUFNR AUFNR AUFNR CHAR 12   0   Order Number AUFK
4 AUFPL CO_AUFPL AUFPL NUMC 10   0   Routing number of operations in the order  
5 APLZL CO_APLZL CO_APLZL NUMC 8   0   General counter for order  
6 VORNR VORNR VORNR CHAR 4   0   Operation/Activity Number  
7 SUMNR SUMKNTNR KNTNR NUMC 8   0   Node number of the superior operation  
8 PSPID PS_PSPID PS_PSPID CHAR 24   0   Project definition  
9 POSID PS_POSID PS_POSID CHAR 24   0   Work Breakdown Structure Element (WBS Element)  
10 ERDAT AUFERFDAT DATUM DATS 8   0   Created on  
11 AEDAT AUFAEDAT DATUM DATS 8   0   Change date for Order Master  
12 PLIFZ PLIFZ DEC3 DEC 3   0   Planned delivery time in days  
13 DAUNO DAUNOR DAUER_4_1 QUAN 5   1   Normal duration of the activity  
14 DAUNE DAUNORE MEINS UNIT 3   0   Normal duration/unit T006
15 DAUMI DAUMIN DAUER_4_1 QUAN 5   1   Minimum activity duration  
16 DAUME DAUMINE MEINS UNIT 3   0   Unit for the minimum duration T006
17 EINSA EINSCHRA RESTRIKSTR CHAR 1   0   Constraint on the basic start date for the activity  
18 EINSE EINSCHRE RESTRIKEND CHAR 1   0   Constraint on the finish date of the activity  
19 FSAVD FSAVD DATUM DATS 8   0   Earliest scheduled start: Execution (date)  
20 FSAVZ FSAVZ ATIME TIMS 6   0   Earliest scheduled start: Execution (time)  
21 FSSBD FSSBD DATUM DATS 8   0   Earliest scheduled start: Processing (date)  
22 FSSBZ FSSBZ ATIME TIMS 6   0   Earliest scheduled start: Processing (time)  
23 FSSAD FSSAD DATUM DATS 8   0   Earliest scheduled start: Teardown (date)  
24 FSSAZ FSSAZ ATIME TIMS 6   0   Earliest scheduled start: Teardown (time)  
25 FSEDD FSEDD DATUM DATS 8   0   Earliest scheduled finish: Execution (date)  
26 FSEDZ FSEDZ ATIME TIMS 6   0   Earliest scheduled finish: Execution (time)  
27 FSSLD FSSLD DATUM DATS 8   0   Earliest scheduled start: Wait (date)  
28 FSSLZ FSSLZ ATIME TIMS 6   0   Earliest scheduled start: Wait (time)  
29 FSELD FSELD DATUM DATS 8   0   Earliest scheduled finish: Wait (date)  
30 FSELZ FSELZ ATIME TIMS 6   0   Earliest scheduled finish: Wait (time)  
31 SSAVD SSAVD DATUM DATS 8   0   Latest scheduled start: Execution (date)  
32 SSAVZ SSAVZ ATIME TIMS 6   0   Latest scheduled start: Execution (time)  
33 SSSBD SSSBD DATUM DATS 8   0   Latest scheduled start: Processing (date)  
34 SSSBZ SSSBZ ATIME TIMS 6   0   Latest scheduled start: Processing (time)  
35 SSSAD SSSAD DATUM DATS 8   0   Latest scheduled start: Teardown (date)  
36 SSSAZ SSSAZ ATIME TIMS 6   0   Latest scheduled start: Teardown (time)  
37 SSEDD SSEDD DATUM DATS 8   0   Latest scheduled finish: Execution (date)  
38 SSEDZ SSEDZ ATIME TIMS 6   0   Latest scheduled finish: Execution (time)  
39 SSSLD SSSLD DATUM DATS 8   0   Latest scheduled start: Wait time (date)  
40 SSSLZ SSSLZ ATIME TIMS 6   0   Latest scheduled start: Wait time  
41 SSELD SSELD DATUM DATS 8   0   Latest scheduled finish: Wait time (date)  
42 SSELZ SSELZ ATIME TIMS 6   0   Latest scheduled finish: Wait time  
43 ISAVD ISAVD DATUM DATS 8   0   Actual operation start (date)  
44 IEAVD IEAVD DATUM DATS 8   0   Actual finish of operation (date)  
45 ISDD ISDD DATUM DATS 8   0   Actual start: Execution (date)  
46 ISDZ ISDZ ATIME TIMS 6   0   Actual start: Execution/setup (time)  
47 IERD IERD DATUM DATS 8   0   Actual finish: Setup (date)  
48 IERZ IERZ ATIME TIMS 6   0   Actual finish: Setup (time)  
49 ISBD ISBD DATUM DATS 8   0   Actual start: Processing (date)  
50 ISBZ ISBZ ATIME TIMS 6   0   Actual start: Processing (time)  
51 IEBD IEBD DATUM DATS 8   0   Actual finish: Processing (date)  
52 IEBZ IEBZ ATIME TIMS 6   0   Actual processing finish (time)  
53 ISAD ISAD DATUM DATS 8   0   Actual start: Teardown (date)  
54 ISAZ ISAZ ATIME TIMS 6   0   Actual start: Teardown (time)  
55 IEDD IEDD DATUM DATS 8   0   Actual finish: Execution (date)  
56 IEDZ IEDZ ATIME TIMS 6   0   Actual finish: Execution (time)  
57 PEDD CO_PEDD DATUM DATS 8   0   Forecast finish date of operation from confirmation  
58 PEDZ CO_PEDZ ATIME TIMS 6   0   Forecast finish time of operation from confirmation  
59 PUFFR PUFFR_FREI PUFFER DEC 3   0   Free float  
60 PUFGS PUFFR_GESM PUFFER DEC 3   0   Total float  
61 NTANF VORGABESTD VORGABESTR DATS 8   0   Constraint for activity start (Basic)  
62 NTANZ VORGABESTZ ATIME TIMS 6   0   Constraint for activity start time (Basic)  
63 NTEND VORGABEEND2 VORGABEEND DATS 8   0   Constraint for Finish of Activity (Basic)  
64 NTENZ VORGABEENZ ATIME TIMS 6   0   Basic finish time of the activity  
65 EWSTD EWSTARTD DATUM DATS 8   0   Forecasted start date for the activity  
66 EWSTZ EWSTARTZ ATIME TIMS 6   0   Forecast start time of the activity  
67 EWEND EWENDED DATUM DATS 8   0   Forecast finish date  
68 EWENZ EWENDEZ ATIME TIMS 6   0   Forecast finish time for the activity  
69 EWDAN EWDAN DAUER_4_1 QUAN 5   1   Normal duration (from forecast) of activity  
70 EWDNE EWDNE MEINS UNIT 3   0   Unit for forecast normal duration T006
71 EWDAM EWDAM DAUER_4_1 QUAN 5   1   Minimum duration (from forecast) for activity  
72 EWDME EWDME MEINS UNIT 3   0   Unit for forecast minimum duration T006
73 EWSTE PS_RESTE RESTRIKEND CHAR 1   0   Forecast date constraint on activity finish  
74 EWSTA PS_RESTA RESTRIKSTR CHAR 1   0   Forecast date constraint on activity start  
75 FPAVD FPAVD DATUM DATS 8   0   Earliest scheduled start date (forecast)  
76 FPAVZ FPAVZ ATIME TIMS 6   0   Earliest scheduled start time (forecast)  
77 FPEDD FPEDD DATUM DATS 8   0   Earliest scheduled finish date (forecast)  
78 FPEDZ FPEDZ ATIME TIMS 6   0   Earliest scheduled finish time (forecast)  
79 SPAVD SPAVD DATUM DATS 8   0   Latest scheduled start date (forecast)  
80 SPAVZ SPAVZ ATIME TIMS 6   0   Latest scheduled start time (forecast)  
81 SPEDD SPEDD DATUM DATS 8   0   Latest scheduled finish date (forecast)  
82 SPEDZ SPEDZ ATIME TIMS 6   0   Latest scheduled finish time (forecast)  
83 BEAZP BEAZEP EINHEIT UNIT 3   0   Unit of processing time (Forecast)  
84 PUFGP PPUFF_GESM PUFFER DEC 3   0   Total float (from forecast)  
85 PUFFP PPUFF_FREI PUFFER DEC 3   0   Free float (from forecast)  
86 BEARP PBEARZEIT CX_ZEIT FLTP 16   16   Processing time (forecast)  
87 EPANF EPANF DATUM DATS 8   0   Dispatched start date for operation  
88 EPANZ EPANZ ATIME TIMS 6   0   Dispatched start time for operation  
89 EPEND EPEND DATUM DATS 8   0   Dispatched finish date  
90 EPENZ EPENZ ATIME TIMS 6   0   Dispatched finish time  
91 PDAU PDAU DAUER_4_1 QUAN 5   1   Forecasted duration of activity from confirmation  
92 PDAE PDAE MEINS UNIT 3   0   Unit of the forecasted duration from the confirmation T006
Foreign Keys
Source Table Source Column Foreign Table Foreign Column Dependency Factor Cardinality left Cardinality right
1 BIW_AFVV_V AUFNR AUFK AUFNR KEY 1 1
2 BIW_AFVV_V DAUME T006 MSEHI    
3 BIW_AFVV_V DAUNE T006 MSEHI    
4 BIW_AFVV_V EWDME T006 MSEHI    
5 BIW_AFVV_V EWDNE T006 MSEHI    
6 BIW_AFVV_V MANDT T000 MANDT KEY 1 CN
7 BIW_AFVV_V PDAE T006 MSEHI    
History
Last changed by/on SAP  20130529 
SAP Release Created in