Hierarchy
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ CP (Package) R/3 Application development: PP Task Lists
Basic Data
Data Element | FLIESSKZ |
Short Description | Indicator: continuous flow production |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | XFELD | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Cont. flow |
Medium | 15 | Cont. flow prod |
Long | 20 | Continuous flow prod |
Heading | 10 | ContFlow |
Documentation
Definition
You use this indicator to stipulate that the operations always (irrespective of the reduction startegy for the operation) overlap, if the conditions for an overlap are fulfilled.
The system extends the execution time of all the overlapping operations, for which the indicator has been set, so that it is as long as the execution time of the longest operation.
Dependencies
- Conditions for Overlaps/>
During scheduling the system determines from the minimum send-ahead quantity and the minimum overlap time.
- Whether the operations can overlap
- An overlap is only permissible, if the time the operations overlap is larger than the minimum overlap time.
- When is the start date of the following operation
- If operations overlap, the next operation can start when the minimum send-ahead quantity has been produced. If a move is necessary, this is taken into account with the minimum move time.
- The following operation is scheduled so that no interruptions occur.
- Additional Condition for Overlaps in Collective Orders
If you specify overlps for the last operation of an order, which is part of a collective order this operation can overlap with its successor in the superior order. The prerequisite for this is that there is no difference between the requirements date of the directly produced component and the basic finish date of the subordinate order.
History
Last changed by/on | SAP | 19981210 |
SAP Release Created in |