SAP ABAP View V_COCF_MD_CNF (Order Confirmations)
Hierarchy
EA-APPL (Software Component) SAP Enterprise Extension PLM, SCM, Financials
   PP-SFC-IS (Application Component) Information System
     COCF_MANDASH (Package) Manufacturind dashboards for mid-market
Basic Data
View Type D Database View 
Database View V_COCF_MD_CNF  
Short Description Order Confirmations    
Root table AUFK   Order master data 
Table
# Table Name Foreign Table Foreign Field Foreign DIR
1 AUFK AUFK
2 AFKO  
3 AFRU  
Join Conditions
# Table Name Field Name Negation Operator Constants Cont. line AND/OR Offset F Length Mco Field
1 AUFK MANDT JL EQ 0 0
2 AFKO MANDT JR EQ AND 0 0
3 AUFK AUFNR JL EQ 0 0
4 AFKO AUFNR JR EQ AND 0 0
5 AFRU MANDT JL EQ 0 0
6 AFKO MANDT JR EQ AND 0 0
7 AFRU AUFNR JL EQ 0 0
8 AFKO AUFNR JR EQ 0 0
                     
View Fields
# View field Table Field Maintenance Flag Key Data element Mod Short Description
1 MANDT AUFK MANDT   MANDT Client
2 AUFNR AUFK AUFNR   AUFNR Order Number
3 AUART AUFK AUART   AUFART Order Type
4 AUTYP AUFK AUTYP   AUFTYP Order category
5 REFNR AUFK REFNR   AUFREFNR Reference order number
6 ERNAM_H AUFK ERNAM   AUFERFNAM Entered by
7 ERDAT AUFK ERDAT   AUFERFDAT Created on
8 AENAM_H AUFK AENAM   AUFAENAM Last changed by
9 AEDAT AUFK AEDAT   AUFAEDAT Change date for Order Master
10 KTEXT AUFK KTEXT   AUFTEXT Description
11 LTEXT AUFK LTEXT   AUFLTEXT Long Text Exists
12 BUKRS AUFK BUKRS   BUKRS Company Code
13 WERKS_H AUFK WERKS   WERKS_D Plant
14 GSBER AUFK GSBER   GSBER Business Area
15 KOKRS AUFK KOKRS   KOKRS Controlling Area
16 CCKEY AUFK CCKEY   CCKEY Cost collector key
17 KOSTV AUFK KOSTV   AUFKOSTV Responsible cost center
18 STORT AUFK STORT   AUFSTORT Location
19 SOWRK AUFK SOWRK   AUFSOWRK Location plant
20 ASTKZ AUFK ASTKZ   AUFSTKZ Identifier for statistical order
21 WAERS AUFK WAERS   AUFWAERS Order Currency
22 ASTNR AUFK ASTNR   AUFASTNR Order status
23 STDAT AUFK STDAT   AUFSTDAT Date of last status change
24 ESTNR AUFK ESTNR   AUFESTNR Status reached so far
25 PHAS0 AUFK PHAS0   AUFPHAS0 Phase "Order created"
26 PHAS1 AUFK PHAS1   AUFPHAS1 Phase "Order released"
27 PHAS2 AUFK PHAS2   AUFPHAS2 Phase "order completed"
28 PHAS3 AUFK PHAS3   AUFPHAS3 Phase "order closed"
29 PDAT1 AUFK PDAT1   AUFPDAT1 Planned release date
30 PDAT2 AUFK PDAT2   AUFPDAT2 Planned completion date
31 PDAT3 AUFK PDAT3   AUFPDAT3 Planned closing date
32 IDAT1 AUFK IDAT1   AUFIDAT1 Release date
33 IDAT2 AUFK IDAT2   AUFIDAT2 Technical completion date
34 IDAT3 AUFK IDAT3   AUFIDAT3 Close date
35 OBJID AUFK OBJID   CCOBJID Object ID
36 VOGRP AUFK VOGRP   AUFSPSET Group of disallowed transactions
37 LOEKZ AUFK LOEKZ   AUFLOEKZ Deletion flag
38 PLGKZ AUFK PLGKZ   PLGKZ Identifier for planning with line items
39 KVEWE AUFK KVEWE   KVEWE Usage of the Condition Table
40 KAPPL AUFK KAPPL   KAPPL Application
41 KALSM AUFK KALSM   AUFKALSM Costing Sheet
42 ZSCHL AUFK ZSCHL   AUFZSCHL Overhead key
43 ABKRS AUFK ABKRS   AUFABKRS Processing group
44 KSTAR AUFK KSTAR   AUFKSTAR Settlement cost element
45 KOSTL AUFK KOSTL   AUFKOSTL Cost center for basic settlement
46 SAKNR AUFK SAKNR   AUFSAKNR G/L account for basic settlement
47 SETNM AUFK SETNM   AUFSETNM Allocation set
48 CYCLE AUFK CYCLE   ST_KOSTL Cost center to which costs are actually posted
49 SDATE AUFK SDATE   SDATE Start Date
50 SEQNR AUFK SEQNR   AUFSEQNR Sequence number
51 USER0 AUFK USER0   AUFUSER0 Applicant
52 USER1 AUFK USER1   AUFUSER1 Applicant's telephone number
53 USER2 AUFK USER2   AUFUSER2 Person Responsible
54 USER3 AUFK USER3   AUFUSER3 Telephone number of person in charge
55 USER4 AUFK USER4   AUFUSER4 Estimated total costs of order
56 USER5 AUFK USER5   AUFUSER5 Application date
57 USER6 AUFK USER6   AUFUSER6 Department
58 USER7 AUFK USER7   AUFUSER7 Work Start
59 USER8 AUFK USER8   AUFUSER8 End of Work
60 USER9 AUFK USER9   AUFUSER9 Identifier for work permit issued
61 OBJNR AUFK OBJNR   J_OBJNR Object number
62 PRCTR AUFK PRCTR   PRCTR Profit Center
63 PSPEL AUFK PSPEL   PS_PSP_ELE Work breakdown structure element (WBS element)
64 AWSLS AUFK AWSLS   AWSLS Variance Key
65 ABGSL AUFK ABGSL   ABGR_SCHL Results Analysis Key
66 TXJCD AUFK TXJCD   TXJCD Tax Jurisdiction
67 FUNC_AREA AUFK FUNC_AREA   FKBER Functional Area
68 SCOPE AUFK SCOPE   SCOPE_CV Object Class
69 PLINT AUFK PLINT   PLINT Indicator for Integrated Planning
70 KDAUF AUFK KDAUF   KDAUF Sales Order Number
71 KDPOS AUFK KDPOS   KDPOS Item number in Sales Order
72 AUFEX AUFK AUFEX   AUFEX External order number
73 IVPRO AUFK IVPRO   IM_PROFIL Investment measure profile
74 LOGSYSTEM AUFK LOGSYSTEM   LOGSYSTEM Logical System
75 FLG_MLTPS AUFK FLG_MLTPS   CO_MLTPS Order with multiple items
76 ABUKR AUFK ABUKR   IM_ABUKRS Requesting company code
77 AKSTL AUFK AKSTL   PS_AKSTL Requesting cost center
78 SIZECL AUFK SIZECL   IM_SIZECL Scale of investment objects
79 IZWEK AUFK IZWEK   IZWEK Reason for investment
80 UMWKZ AUFK UMWKZ   AM_UMWKZ Reason for environmental investment
81 KSTEMPF AUFK KSTEMPF   CO_KSTEMPF Indicator: Direct cost collector
82 ZSCHM AUFK ZSCHM   PS_ZSCHM Interest Profile for Project/Order Interest Calculation
83 PKOSA AUFK PKOSA   PKOSA_D Cost collector for production process PROCNR
84 ANFAUFNR AUFK ANFAUFNR   AUFANFNR Requesting order
85 PROCNR AUFK PROCNR   CKML_F_PROCNR Production Process
86 PROTY AUFK PROTY   CKML_PROZESS_TYP Process Category (Procurement/Consumption)
87 RSORD AUFK RSORD   RSORD Refurbishment order indicator (PM)
88 BEMOT_H AUFK BEMOT   BEMOT Accounting Indicator
89 ADRNRA AUFK ADRNRA   AD_ADDRNUM Address number
90 ERFZEIT AUFK ERFZEIT   CO_INS_TIME Time created
91 AEZEIT AUFK AEZEIT   CO_CHG_TIME Changed at
92 CSTG_VRNT AUFK CSTG_VRNT   CK_KLVAR Costing Variant
93 COSTESTNR AUFK COSTESTNR   CK_KALNR Cost Estimate Number for Cost Est. w/o Qty Structure
94 VERAA_USER AUFK VERAA_USER   VERAA_USER Person Responsible for CO Internal Order
95 VNAME AUFK VNAME   JV_NAME Joint venture
96 RECID AUFK RECID   JV_RECIND Recovery Indicator
97 ETYPE AUFK ETYPE   JV_ETYPE Equity type
98 OTYPE AUFK OTYPE   JV_OTYPE Joint Venture Object Type
99 JV_JIBCL AUFK JV_JIBCL   JV_JIBCL JIB/JIBE Class
100 JV_JIBSA AUFK JV_JIBSA   JV_JIBSA JIB/JIBE Subclass A
101 JV_OCO AUFK JV_OCO   JV_OR_CO JV original cost object
102 /CUM/INDCU AUFK /CUM/INDCU   /CUM/INDCU CU: Order is Used for Compatible Units
103 /CUM/CMNUM AUFK /CUM/CMNUM   /CUM/CMNUM CU: Construction Measure Number
104 /CUM/AUEST AUFK /CUM/AUEST   /CUM/AUEST CU: Automatic Copy of Estimated Costs
105 /CUM/DESNUM AUFK /CUM/DESNUM   /CUM/DESNUM CU: Design Number
106 VAPLZ AUFK VAPLZ   GEWRK Main work center for maintenance tasks
107 WAWRK AUFK WAWRK   WERGW Plant associated with main work center
108 FERC_IND AUFK FERC_IND   FE_IND Regulatory indicator
109 GLTRP AFKO GLTRP   CO_GLTRP Basic finish date
110 GSTRP AFKO GSTRP   PM_ORDGSTRP Basic Start Date
111 FTRMS AFKO FTRMS   CO_FTRMS Scheduled release date
112 GLTRS AFKO GLTRS   CO_GLTRS Scheduled finish
113 GSTRS AFKO GSTRS   CO_GSTRS Scheduled start
114 GSTRI AFKO GSTRI   CO_GSTRI Actual start date
115 GETRI AFKO GETRI   CO_GETRI Confirmed Order Finish Date
116 GLTRI AFKO GLTRI   CO_GLTRI Actual finish date
117 FTRMI AFKO FTRMI   CO_FTRMI Actual release date
118 FTRMP AFKO FTRMP   CO_FTRMP Planned release date
119 RSNUM AFKO RSNUM   RSNUM Number of reservation/dependent requirements
120 GASMG AFKO GASMG   GASMG Total scrap quantity in the order
121 GAMNG AFKO GAMNG   GAMNG Total order quantity
122 GMEIN_H AFKO GMEIN   MEINS Base Unit of Measure
123 PLNBEZ AFKO PLNBEZ   MATNR Material Number
124 PLNTY AFKO PLNTY   PLNTY Task List Type
125 PLNNR AFKO PLNNR   PLNNR Key for Task List Group
126 PLNAW AFKO PLNAW   PLNAW Application of the task list
127 PLNAL AFKO PLNAL   PLNAL Group Counter
128 PVERW AFKO PVERW   PLN_VERWE Task list usage
129 PLAUF AFKO PLAUF   CO_PLAUF Date for routing transfer
130 PLSVB AFKO PLSVB   LOSGRBIS To lot size
131 PLNME AFKO PLNME   PLNME Task list unit of measure
132 PLSVN AFKO PLSVN   LOSGRVON From Lot Size
133 PDATV AFKO PDATV   DATUV Valid-From Date
134 PAENR AFKO PAENR   AENNR Change Number
135 PLGRP AFKO PLGRP   VAGRP Responsible planner group/department
136 LODIV AFKO LODIV   LOSDIV Lot size divisor
137 STLTY AFKO STLTY   STLTY BOM Category
138 STLBEZ AFKO STLBEZ   MATNR Material Number
139 STLST AFKO STLST   STLST BOM Statuses
140 STLNR AFKO STLNR   STNUM Bill of Material
141 SDATV AFKO SDATV   DATUV Valid-From Date
142 SBMNG AFKO SBMNG   BASMN Base quantity
143 SBMEH AFKO SBMEH   MEINS Base Unit of Measure
144 SAENR AFKO SAENR   AENNR Change Number
145 STLAL AFKO STLAL   STALT Alternative BOM
146 STLAN AFKO STLAN   STLAN BOM Usage
147 SLSVN AFKO SLSVN   LOSVN From Lot Size
148 SLSBS AFKO SLSBS   LOSBS To Lot Size
149 AUFLD AFKO AUFLD   CO_AUFLD Date of BOM Explosion/Routing Transfer
150 DISPO AFKO DISPO   CO_DISPO MRP controller for the order
151 AUFPL_H AFKO AUFPL   CO_AUFPL Routing number of operations in the order
152 FEVOR AFKO FEVOR   FEVOR Production Supervisor
153 FHORI AFKO FHORI   FHORI Scheduling Margin Key for Floats
154 TERKZ AFKO TERKZ   TERMKZ Scheduling type
155 REDKZ AFKO REDKZ   REDKZ Reduction indicator for scheduling
156 APRIO AFKO APRIO   CO_APRIO Order priority
157 NTZUE AFKO NTZUE   NETZ_UEBER Superior network number
158 VORUE AFKO VORUE   VORG_UEBER Superior activity
159 PROFID AFKO PROFID   PROFIDNZPL Network profile
160 VORGZ AFKO VORGZ   VORGZ Float before production (in days)
161 SICHZ AFKO SICHZ   SICHZ Float after production (in days)
162 FREIZ AFKO FREIZ   FREIZ Release period (in days)
163 UPTER AFKO UPTER   CO_UPTER Indicator: Change to Scheduled Dates
164 BEDID AFKO BEDID   BEDID ID of the capacity requirements record
165 PRONR AFKO PRONR   PS_PSP_PRO Project definition
166 ZAEHL AFKO ZAEHL   CIM_COUNT Internal counter
167 MZAEHL AFKO MZAEHL   CIM_COUNT Internal counter
168 ZKRIZ AFKO ZKRIZ   DZKRIZ Counter for additional criteria
169 PRUEFLOS AFKO PRUEFLOS   QPLOS Inspection Lot Number
170 KLVARP AFKO KLVARP   KALKVARPLN Costing variant for planned costs
171 KLVARI AFKO KLVARI   KALKVARIST Costing variant for actual costs
172 RGEKZ AFKO RGEKZ   CO_RGEKZ Indicator: Backflushing for order
173 PLART AFKO PLART   PS_PLART Basis for scheduling
174 FLG_AOB AFKO FLG_AOB   FLG_AOB Indicator: relationships
175 FLG_ARBEI AFKO FLG_ARBEI   FLG_ARBEI Indicator: Default value work is relevant
176 GLTPP AFKO GLTPP   CO_GLTPP Finish date (forecast)
177 GSTPP AFKO GSTPP   CO_GSTPP Forecast start date
178 GLTPS AFKO GLTPS   CO_GLTPS Scheduled forecast finish
179 GSTPS AFKO GSTPS   CO_GSTPS Scheduled forecast start
180 FTRPS AFKO FTRPS   CO_FTRPS Scheduled release date (forecast)
181 RDKZP AFKO RDKZP   REDKZP Reduction indicator for scheduling (forecast)
182 TRKZP AFKO TRKZP   TERMKZP Scheduling type (forecast)
183 RUECK_H AFKO RUECK   CO_RUECK Completion confirmation number for the operation
184 RMZHL_H AFKO RMZHL   CIM_COUNT Internal counter
185 IGMNG AFKO IGMNG   CO_IGMNG Yield confirmed from order confirmation
186 RATID AFKO RATID   BEDID ID of the capacity requirements record
187 GROID AFKO GROID   BEDID ID of the capacity requirements record
188 CUOBJ AFKO CUOBJ   CUOBJ Configuration (internal object number)
189 GLUZS AFKO GLUZS   CO_GLUZS Scheduled finish time
190 GSUZS AFKO GSUZS   CO_GSUZS Scheduled Start (Time)
191 REVLV AFKO REVLV   REVLV Revision level
192 RSHTY AFKO RSHTY   CR_OBJTY Object types of the CIM resource
193 RSHID AFKO RSHID   CR_OBJID Object ID of the resource
194 RSNTY AFKO RSNTY   CR_OBJTY Object types of the CIM resource
195 RSNID AFKO RSNID   CR_OBJID Object ID of the resource
196 NAUTERM AFKO NAUTERM   CO_NAUTERM Indicator: Do not schedule automatically
197 NAUCOST AFKO NAUCOST   CO_NAUCOST Indicator: Do not cost automatically
198 STUFE AFKO STUFE   HISTU Level (in Multi-Level BOM Explosions)
199 WEGXX AFKO WEGXX   WEGXX Path (for Multi-Level BOM Explosions)
200 VWEGX AFKO VWEGX   WEGXX Path (for Multi-Level BOM Explosions)
201 ARSNR AFKO ARSNR   RSNUM Number of reservation/dependent requirements
202 ARSPS AFKO ARSPS   CO_POSNR Order item number
203 MAUFNR AFKO MAUFNR   MAUFNR Number of superior order
204 LKNOT AFKO LKNOT   CO_LKNOT Left node in collective order
205 RKNOT AFKO RKNOT   CO_RKNOT Right node of a collective order
206 PRODNET AFKO PRODNET   CO_PRODNET Indicator: Order is part of collective order
207 IASMG AFKO IASMG   CO_IASMG Scrap confirmed for order
208 ABARB_H AFKO ABARB   CO_ABARB Confirmation: Degree of processing
209 AUFNT AFKO AUFNT   CO_TEILNET Number of superior network
210 AUFPT AFKO AUFPT   CO_AUFPL Routing number of operations in the order
211 APLZT AFKO APLZT   CO_APLZL General counter for order
212 NO_DISP AFKO NO_DISP   NO_DISP_PLUS Effective for Materials Planning
213 CSPLIT AFKO CSPLIT   CSPLIT Apportionment structure
214 AENNR AFKO AENNR   AENNR Change Number
215 CY_SEQNR AFKO CY_SEQNR   CY_SEQNR Seq. number order
216 BREAKS AFKO BREAKS   BREAKS Indicator: Scheduling allowing for breaks
217 VORGZ_TRM AFKO VORGZ_TRM   VORGZ_TRM Scheduled float before production in days
218 SICHZ_TRM AFKO SICHZ_TRM   SICHZ_TRM Scheduled float after production in days
219 TRMDT AFKO TRMDT   TRMDT Date of the last scheduling
220 GLUZP AFKO GLUZP   CO_GLUZP Basic finish (time)
221 GSUZP AFKO GSUZP   CO_GSUZP Basic start time
222 GSUZI AFKO GSUZI   CO_GSUZI Actual start time
223 GEUZI AFKO GEUZI   CO_GEUZI Confirmed order finish (time)
224 GLUPP AFKO GLUPP   CO_GLUPP Forecast finish (time)
225 GSUPP AFKO GSUPP   CO_GSUPP Forecast start (time)
226 GLUPS AFKO GLUPS   CO_GLUPS Scheduled forecast finish time
227 GSUPS AFKO GSUPS   CO_GSUPS Scheduled start time (Forecast)
228 CHSCH AFKO CHSCH   KALSMA_CH Search procedure for batch determination
229 KAPT_VORGZ AFKO KAPT_VORGZ   KAPT_VORGZ Float (bef. production) remaining after finite scheduling
230 KAPT_SICHZ AFKO KAPT_SICHZ   KAPT_SICHZ Remaining float after finite scheduling
231 LEAD_AUFNR AFKO LEAD_AUFNR   CO_LAUFNR Leading order in current processing
232 PNETSTARTD AFKO PNETSTARTD   CO_PSTARTD Outline start of collective network (date)
233 PNETSTARTT AFKO PNETSTARTT   CO_PSTARTT Start time of a collective order
234 PNETENDD AFKO PNETENDD   CO_PENDD Outline finish of collective order (date)
235 PNETENDT AFKO PNETENDT   CO_PENDT Outline finish time
236 KBED AFKO KBED   KBED_D Ind: do not create capacity requirements
237 KKALKR AFKO KKALKR   COMP_CALC Indicator: Components will not be costed
238 SFCPF AFKO SFCPF   CO_PRODPRF Production Scheduling Profile
239 RMNGA_H AFKO RMNGA   RMNGA Total confirmed rework quantity
240 GSBTR AFKO GSBTR   CO_GSBTR Overall commitment date
241 VFMNG AFKO VFMNG   CO_VFMNG Committed quantity for order acc. to ATP check components
242 NOPCOST AFKO NOPCOST   CO_NOPCOST Do not calculate planned costs for order
243 NETZKONT AFKO NETZKONT   NETZKONT Indicator for the account assignment of a network(hdr/act.)
244 ATRKZ AFKO ATRKZ   ATRKZ Request ID
245 OBJTYPE AFKO OBJTYPE   OCM_OBJ_TYPE Change indicator
246 CH_PROC AFKO CH_PROC   OCM_CH_PROC Process that has lead to the change of an object
247 KAPVERSA AFKO KAPVERSA   KAPVERSA Version of Available Capacity
248 COLORDPROC AFKO COLORDPROC   CO_COLORDPRC Collective order with/without automatic goods movement
249 KZERB AFKO KZERB   PS_KZERB Indicator: Project summarization
250 CONF_KEY AFKO CONF_KEY   CC_CONF_KEY Identical object
251 ST_ARBID AFKO ST_ARBID   OBJEKTID Object ID
252 VSNMR_V AFKO VSNMR_V   VSNMR_V Sales document version number
253 TERHW AFKO TERHW   TERHW Scheduling note from order scheduling
254 SPLSTAT AFKO SPLSTAT   SPLIT_STAT Status of an order in a split hierarchy
255 COSTUPD AFKO COSTUPD   CN_COSTUPD Costs are updated
256 ADPSP AFKO ADPSP   ADCOMPARE PM/PS Reference Element
257 RMANR AFKO RMANR   VBELN Sales and Distribution Document Number
258 POSNR_RMA AFKO POSNR_RMA   POSNR Item number of the SD document
259 POSNV_RMA AFKO POSNV_RMA   POSNR Item number of the SD document
260 OIHANTYP AFKO OIHANTYP   OIH_HANTYP Excise Duty Handling Type
261 RUECK_C AFRU RUECK   CO_RUECK Completion confirmation number for the operation
262 RMZHL_C AFRU RMZHL   CO_RMZHL Confirmation counter
263 ERSDA AFRU ERSDA   RU_ERSDA Confirmation entry date
264 ERNAM_C AFRU ERNAM   RU_ERNAM Name of the person who entered the confirmation
265 LAEDA AFRU LAEDA   LAEDA Date of Last Change
266 AENAM_C AFRU AENAM   AENAM Name of Person Who Changed Object
267 BUDAT AFRU BUDAT   BUCHDATUM Posting date
268 ARBID AFRU ARBID   OBJEKTID Object ID
269 WERKS AFRU WERKS   WERKS_D Plant
270 LTXA1 AFRU LTXA1   CO_RTEXT Confirmation text
271 TXTSP AFRU TXTSP   SPRAS Language Key
272 ISERH AFRU ISERH   ISERH Confirmed break time
273 ZEIER AFRU ZEIER   DZEIER Unit for the break time
274 ILE01 AFRU ILE01   CO_ISMNGEH Unit of measure for the activity to be confirmed
275 ISM01 AFRU ISM01   RU_ISMNG Activity currently to be confirmed
276 ILE02 AFRU ILE02   CO_ISMNGEH Unit of measure for the activity to be confirmed
277 ISM02 AFRU ISM02   RU_ISMNG Activity currently to be confirmed
278 ILE03 AFRU ILE03   CO_ISMNGEH Unit of measure for the activity to be confirmed
279 ISM03 AFRU ISM03   RU_ISMNG Activity currently to be confirmed
280 ILE04 AFRU ILE04   CO_ISMNGEH Unit of measure for the activity to be confirmed
281 ISM04 AFRU ISM04   RU_ISMNG Activity currently to be confirmed
282 ILE05 AFRU ILE05   CO_ISMNGEH Unit of measure for the activity to be confirmed
283 ISM05 AFRU ISM05   RU_ISMNG Activity currently to be confirmed
284 ILE06 AFRU ILE06   CO_ISMNGEH Unit of measure for the activity to be confirmed
285 ISM06 AFRU ISM06   RU_ISMNG Activity currently to be confirmed
286 ABARB_C AFRU ABARB   CO_ABARB Confirmation: Degree of processing
287 ISMNW AFRU ISMNW   ISMNW Actual work
288 ISMNE AFRU ISMNE   ARBEITE Unit for work
289 LEARR AFRU LEARR   LEARR Activity type for confirmation
290 IDAUR AFRU IDAUR   IDAUR Actual duration for confirmation
291 IDAUE AFRU IDAUE   IDAURE Unit for actual duration
292 ZCODE AFRU ZCODE   DZCODE Reference number for standard value code
293 LOART AFRU LOART   LOHNART Wage type
294 QUALF AFRU QUALF   QUALF Suitability
295 ANZMA AFRU ANZMA   ANZMS Number of employees
296 LOGRP AFRU LOGRP   LOHNGRP Wage group
297 GMNGA AFRU GMNGA   RU_GMNGA Previously confirmed yield in order unit of measure
298 LMNGA AFRU LMNGA   RU_LMNGA Yield currently to be confirmed
299 XMNGA AFRU XMNGA   RU_XMNGA Scrap currently to be confirmed
300 GMEIN_C AFRU GMEIN   MEINS Base Unit of Measure
301 MEINH AFRU MEINH   RU_VORME Confirmation unit of measure
302 GRUND AFRU GRUND   CO_AGRND Reason for Variance
303 PERNR AFRU PERNR   CO_PERNR Personnel number
304 ISDD AFRU ISDD   RU_ISDD Confirmed date for start of execution
305 ISDZ AFRU ISDZ   RU_ISDZ Confirmed time for 'Execution start'
306 IERD AFRU IERD   RU_IERD Confirmed date for 'Setup finish'
307 IERZ AFRU IERZ   RU_IERZ Confirmed time for 'Setup finish'
308 ISBD AFRU ISBD   RU_ISBD Confirmed date for 'Processing start'
309 ISBZ AFRU ISBZ   RU_ISBZ Confirmed time for 'Processing start'
310 IEBD AFRU IEBD   RU_IEBD Confirmed date for 'processing finish'
311 IEBZ AFRU IEBZ   RU_IEBZ Confirmed time for 'processing finish'
312 ISAD AFRU ISAD   RU_ISAD Confirmed date for 'teardown start'
313 ISAZ AFRU ISAZ   RU_ISAZ Confirmed time for 'teardown start'
314 IEDD AFRU IEDD   RU_IEDD Confirmed date for execution finish
315 IEDZ AFRU IEDZ   RU_IEDZ Confirmed time for 'Execution finish'
316 PEDD AFRU PEDD   CO_PEDD Forecast finish date of operation from confirmation
317 PEDZ AFRU PEDZ   CO_PEDZ Forecast finish time of operation from confirmation
318 WABLNR AFRU WABLNR   MBLNR Number of Material Document
319 WEBLNR AFRU WEBLNR   WEBLNR Number of a document from a goods movement with errors
320 AUERU AFRU AUERU   AUERU_VS Partial/Final Confirmation
321 AUSOR AFRU AUSOR   AUSBU Clear Open Reservations
322 STNDR AFRU STNDR   STNDR Indicator: Standard confirmation
323 MANUR AFRU MANUR   MANUR Indicator for type of confirmation
324 MEILR AFRU MEILR   MEILR Indicator: Milestone confirmation carried out
325 AUFPL_C AFRU AUFPL   CO_AUFPL Routing number of operations in the order
326 APLZL AFRU APLZL   CO_APLZL General counter for order
327 APLFL AFRU APLFL   PLNFOLGE Sequence
328 VORNR AFRU VORNR   VORNR Operation/Activity Number
329 SUMNR AFRU SUMNR   SUMKNTNR Node number of the superior operation
330 OFM01 AFRU OFM01   CO_SCHAETZ Forecast value used to update the standard value
331 OFE01 AFRU OFE01   RU_PROGVGE Unit of measurement for the forecast standard value
332 LEK01 AFRU LEK01   CO_LEIKZ Indicator: No remaining activity expected
333 OFM02 AFRU OFM02   CO_SCHAETZ Forecast value used to update the standard value
334 OFE02 AFRU OFE02   RU_PROGVGE Unit of measurement for the forecast standard value
335 LEK02 AFRU LEK02   CO_LEIKZ Indicator: No remaining activity expected
336 OFM03 AFRU OFM03   CO_SCHAETZ Forecast value used to update the standard value
337 OFE03 AFRU OFE03   RU_PROGVGE Unit of measurement for the forecast standard value
338 LEK03 AFRU LEK03   CO_LEIKZ Indicator: No remaining activity expected
339 OFM04 AFRU OFM04   CO_SCHAETZ Forecast value used to update the standard value
340 OFE04 AFRU OFE04   RU_PROGVGE Unit of measurement for the forecast standard value
341 LEK04 AFRU LEK04   CO_LEIKZ Indicator: No remaining activity expected
342 OFM05 AFRU OFM05   CO_SCHAETZ Forecast value used to update the standard value
343 OFE05 AFRU OFE05   RU_PROGVGE Unit of measurement for the forecast standard value
344 LEK05 AFRU LEK05   CO_LEIKZ Indicator: No remaining activity expected
345 OFM06 AFRU OFM06   CO_SCHAETZ Forecast value used to update the standard value
346 OFE06 AFRU OFE06   RU_PROGVGE Unit of measurement for the forecast standard value
347 LEK06 AFRU LEK06   CO_LEIKZ Indicator: No remaining activity expected
348 OFMNW AFRU OFMNW   REMNW Remaining work
349 OFMNE AFRU OFMNE   OFMNE Unit of measure for remaining work
350 LEKNW AFRU LEKNW   LEKNW Indicator: No Remaining Work Expected
351 ODAUR AFRU ODAUR   ODAUR Remaining duration of activity
352 ODAUE AFRU ODAUE   ODAUE Unit for remaining duration
353 STOKZ AFRU STOKZ   CO_STOKZ Indicator: Document Has Been Reversed
354 STZHL AFRU STZHL   CO_STZHL Confirmation counter of cancelled confirmation
355 SMENG AFRU SMENG   MGVRG Operation Quantity
356 RUECK_MST AFRU RUECK_MST   CO_RUECK Completion confirmation number for the operation
357 RMZHL_MST AFRU RMZHL_MST   CO_RMZHL Confirmation counter
358 PDSNR AFRU PDSNR   PDSNR_D Sequential number for PDC messages
359 KAPID AFRU KAPID   KAPID Capacity ID
360 SPLIT AFRU SPLIT   CY_SPLIT Split number
361 ZAUSW AFRU ZAUSW   DZAUSW Time Recording ID Number
362 ORIND AFRU ORIND   ORIND Origin Indicator of PDC Message (Application)
363 ORIGF AFRU ORIGF   ORIGF Origin Indicator of PDC Message
364 CANUM AFRU CANUM   CY_COUNT Counters for cap. rqmts. records (various caps. + indiv.caps
365 BELNR_IST AFRU BELNR_IST   CO_BELNR Document Number
366 BELNR_UMB AFRU BELNR_UMB   CO_BELNR Document Number
367 RMNGA_C AFRU RMNGA   RU_RMNGA Current rework quantity to be confirmed
368 CATSBELNR AFRU CATSBELNR   CATSBELNR Document number
369 SATZA AFRU SATZA   CO_SATZA Record type for confirmation
370 ERZET AFRU ERZET   RU_ERZET Confirmation entry time
371 CATSPRICE AFRU CATSPRICE   CATSPRICE Price in Transaction Currency
372 CATSTCURR AFRU CATSTCURR   TWAER Transaction Currency
373 CATSPEINH AFRU CATSPEINH   PEINH Price unit
374 BEMOT_C AFRU BEMOT   BEMOT Accounting Indicator
375 IPRZ1 AFRU IPRZ1   RU_IPRZS Current quantity to be confirmed for the business process
376 IPRE1 AFRU IPRE1   RU_IPRZE Unit of measurement for conf. quantity for business process
377 IPRK1 AFRU IPRK1   RU_IPRZK No remaining quantity expected for business process
378 EXNAM AFRU EXNAM   RU_EXNAM External creator of confirmation
379 EXERD AFRU EXERD   RU_EXERD External date of entry for confirmation
380 EXERZ AFRU EXERZ   RU_EXERZ External time of entry for confirmation
381 PRZ01 AFRU PRZ01   CO_PRZNR Business Process
382 OPRZ1 AFRU OPRZ1   OPRZ1 Remaining quantity for business process
383 OPRE1 AFRU OPRE1   OPRE1 Unit for remaining quantity of business process
384 SKOKRS AFRU SKOKRS   KOKRS Controlling Area
385 SKOSTL AFRU SKOSTL   SKOSTL Sender Cost Center
386 NODAT AFRU NODAT   NODAT Do not update actual date in the operation
387 ISMNU AFRU ISMNU   ARBEITE Unit for work
388 OFMNU AFRU OFMNU   ARBEITE Unit for work
389 PACKNO AFRU PACKNO   PACKNO Package number
390 EXTID AFRU EXTID   RU_EXTID External Key for Confirmation (for example, from PDC System)
391 SCHGRUP AFRU SCHGRUP   SCHGRUP Grouping for Shift Definitions and Shift Sequences
392 KAPTPROG AFRU KAPTPROG   KAPTPROG Shift definition
393 OBMAT AFRU OBMAT   UCMAT Material from Original Batch
394 OBCHA AFRU OBCHA   UCCHA Original Batch
395 LICHA AFRU LICHA   LICHN Vendor Batch Number
396 MYEAR AFRU MYEAR   MJAHR Year of material document
397 ROLE_ID AFRU ROLE_ID   RMAN_PRSP_ROLEID Role ID for Confirmation in Portal
                 
Maintenance Status
Access
  read only
  read and change
  Time-dependent views: like U, validity data like ' '
  read, change, delete and insert
Delivery Class      
Data Browser/Table View Maintenance    Display/Maintenance Allowed with Restrictions  
History
Last changed by/on SAP  20140122 
SAP Release Created in 605