SAP ABAP Data Element AUERU_VS (Partial/Final Confirmation)
Hierarchy
☛
SAP_ABA (Software Component) Cross-Application Component
⤷ CA-GTF-PS (Application Component) Cross-Application Objects in Project System
⤷ BC (Package) Cross-Application Objects PP/PS
⤷ CA-GTF-PS (Application Component) Cross-Application Objects in Project System
⤷ BC (Package) Cross-Application Objects PP/PS
Basic Data
Data Element | AUERU_VS |
Short Description | Partial/Final Confirmation |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | AUERU_VS | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | FIN_CONF | |
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | FinalConf |
Medium | 15 | Final Confirmtn |
Long | 20 | Final Confirmation |
Heading | 1 | F |
Documentation
Definition
Specifies what sort of confirmation is to be automatically proposed.
Use
For automatic final confirmation, the confirmed quantity of the operation or the order (yield qty + rework qty + scrap qty) determines whether the confirmation is saved as a partial or final confirmation:
- If the confirmed quantity is less than the quantity possible, the confirmation is saved as a partial confirmation.
- If the confirmed quantity is more than (that is, greater than or equal to) the quantity possible, the confirmation is saved as a final confirmation.
The quantity possible corresponds to the planned operation or order quantity, or to the confirmed yield of operations that have been finally confirmed, provided that finally confirmed operations exist.
Dependencies
- When confirmations are entered for individual capacities (capacity splits), the planned quantity of the relevant split is used.
- When confirmations are entered for sub-operations, automatic confirmation is not possible. The proposal 'Automatic final Confirmation' is changed to 'Partial confirmation' for sub-operations.
- This key is not evaluated when confirmations are entered for time events.
History
Last changed by/on | SAP | 19990629 |
SAP Release Created in |