Data Element list used by SAP ABAP Table MCCAUFV (Document Table Structure of Order Header with SUPKZ)
SAP ABAP Table MCCAUFV (Document Table Structure of Order Header with SUPKZ) is using
# | Object Type | Object Name | Object Description | Note |
---|---|---|---|---|
1 | Data Element | /CUM/AUEST | CU: Automatic Copy of Estimated Costs | |
2 | Data Element | /CUM/CMNUM | CU: Construction Measure Number | |
3 | Data Element | /CUM/DESGUID | CU: GUID of Design Document | |
4 | Data Element | /CUM/DESNUM | CU: Design Number | |
5 | Data Element | /CUM/INDCU | CU: Order is Used for Compatible Units | |
6 | Data Element | /CUM/INTCUNR | CU: Internal CU Number in a Work Order | |
7 | Data Element | /ISDFPS/MEQUI | Master Equipment | |
8 | Data Element | ABCKZ | ABC Indicator for Technical Object | |
9 | Data Element | ABGR_SCHL | Results Analysis Key | |
10 | Data Element | ABNUM | Maintenance Plan Call Number | |
11 | Data Element | ADDAT | PM Order: Reference Date | |
12 | Data Element | ADDCOMPARE_CORE | Reference Element PM/PS | |
13 | Data Element | ADUHR | Time of Reference Date | |
14 | Data Element | AD_ADDRNUM | Address number | |
15 | Data Element | AEKNZ | Change indicator | |
16 | Data Element | AEKNZ | Change indicator | |
17 | Data Element | AEKNZ | Change indicator | |
18 | Data Element | AEKNZ | Change indicator | |
19 | Data Element | AEKNZ | Change indicator | |
20 | Data Element | AEKNZ | Change indicator | |
21 | Data Element | AEKNZ | Change indicator | |
22 | Data Element | AEKNZ | Change indicator | |
23 | Data Element | AEKNZ | Change indicator | |
24 | Data Element | AEKNZ | Change indicator | |
25 | Data Element | AEKNZ | Change indicator | |
26 | Data Element | AEKNZ | Change indicator | |
27 | Data Element | AENNR | Change Number | |
28 | Data Element | AENNR | Change Number | |
29 | Data Element | AENNR | Change Number | |
30 | Data Element | AFAKT | Execution Factor | |
31 | Data Element | AKKNZ | Order Category Indicator Plant Maintenance | |
32 | Data Element | AM_UMWKZ | Reason for environmental investment | |
33 | Data Element | ANING | Name of Person Reponsible for System | |
34 | Data Element | ANLBD | Date until which the system is available | |
35 | Data Element | ANLBZ | Time until which the system is available | |
36 | Data Element | ANLN1 | Main Asset Number | |
37 | Data Element | ANLN2 | Asset Subnumber | |
38 | Data Element | ANLVD | Date from which the system is available | |
39 | Data Element | ANLVZ | Time from Which System is Available | |
40 | Data Element | ANLZU | Syst.Condition | |
41 | Data Element | AP_KTEXT | Short text for the work center | |
42 | Data Element | ARTPR | Priority Type | |
43 | Data Element | ATRKZ | Request ID | |
44 | Data Element | AUDISP_PLUS | Reservation Relevance/Generation of Purchase Requisition | |
45 | Data Element | AUFABKRS | Processing group | |
46 | Data Element | AUFAEDAT | Change date for Order Master | |
47 | Data Element | AUFAENAM | Last changed by | |
48 | Data Element | AUFART | Order Type | |
49 | Data Element | AUFERFDAT | Created on | |
50 | Data Element | AUFERFNAM | Entered by | |
51 | Data Element | AUFIDAT2 | Technical completion date | |
52 | Data Element | AUFKALSM | Costing Sheet | |
53 | Data Element | AUFKOSTV | Responsible cost center | |
54 | Data Element | AUFKSTAR | Settlement cost element | |
55 | Data Element | AUFLOEKZ | Deletion flag | |
56 | Data Element | AUFLTEXT | Long Text Exists | |
57 | Data Element | AUFNR | Order Number | |
58 | Data Element | AUFNR | Order Number | |
59 | Data Element | AUFNR | Order Number | |
60 | Data Element | AUFNR | Order Number | |
61 | Data Element | AUFREFNR | Reference order number | |
62 | Data Element | AUFSOWRK | Location plant | |
63 | Data Element | AUFSTKZ | Identifier for statistical order | |
64 | Data Element | AUFTEXT | Description | |
65 | Data Element | AUFTYP | Order category | |
66 | Data Element | AUFUSER4 | Estimated total costs of order | |
67 | Data Element | AUFWAERS | Order Currency | |
68 | Data Element | AUFZSCHL | Overhead key | |
69 | Data Element | AUF_PLKNZ | Maintenance order planning indicator | |
70 | Data Element | AUKBED | Indicator: Calculate capacity requirements | |
71 | Data Element | AVOUEB | Indicator: Display operation overview | |
72 | Data Element | AWSLS | Variance Key | |
73 | Data Element | BASMN | Base quantity | |
74 | Data Element | BASMN | Base quantity | |
75 | Data Element | BASMN | Base quantity | |
76 | Data Element | BAUTL | Assembly | |
77 | Data Element | BEBER | Organizational Area | |
78 | Data Element | BEDID | ID of the capacity requirements record | |
79 | Data Element | BEDID | ID of the capacity requirements record | |
80 | Data Element | BEDID | ID of the capacity requirements record | |
81 | Data Element | BEMOT | Accounting Indicator | |
82 | Data Element | BREAKS | Indicator: Scheduling allowing for breaks | |
83 | Data Element | BUKRS | Company Code | |
84 | Data Element | BUKRS | Company Code | |
85 | Data Element | CADNR | Addresses: Address Number | |
86 | Data Element | CCKEY | Cost collector key | |
87 | Data Element | CCOBJID | Object ID | |
88 | Data Element | CC_CONF_KEY | Identical object | |
89 | Data Element | CFB_ADTDAYS | Additional Days | |
90 | Data Element | CFB_BBD_PPPI | Best-Before Date (BBD)/ Shelf Life Expiration Date (SLED) | |
91 | Data Element | CFB_DATOFM | Date of Manufacture | |
92 | Data Element | CIM_COUNT | Internal counter | |
93 | Data Element | CIM_COUNT | Internal counter | |
94 | Data Element | CIM_COUNT | Internal counter | |
95 | Data Element | CKML_F_PROCNR | Production Process | |
96 | Data Element | CKML_PROZESS_TYP | Process Category (Procurement/Consumption) | |
97 | Data Element | CK_LOSGR | Costing lot size | |
98 | Data Element | CN_AUTH | Ind.: Authorization exists | |
99 | Data Element | CN_AUTH | Ind.: Authorization exists | |
100 | Data Element | CN_AUTH | Ind.: Authorization exists | |
101 | Data Element | CN_AUTH | Ind.: Authorization exists | |
102 | Data Element | CN_AUTH | Ind.: Authorization exists | |
103 | Data Element | CN_AUTH | Ind.: Authorization exists | |
104 | Data Element | CN_AUTH | Ind.: Authorization exists | |
105 | Data Element | CN_COSTUPD | Costs are updated | |
106 | Data Element | COMP_CALC | Indicator: Components will not be costed | |
107 | Data Element | CO_ABARB | Confirmation: Degree of processing | |
108 | Data Element | CO_APLZL | General counter for order | |
109 | Data Element | CO_APRIO | Order priority | |
110 | Data Element | CO_APROZ | Scrap percentage | |
111 | Data Element | CO_APROZ | Scrap percentage | |
112 | Data Element | CO_ASTEX | User status active | |
113 | Data Element | CO_ASTTX | Field displaying user status | |
114 | Data Element | CO_AUCOST | Indicator: Cost automatically | |
115 | Data Element | CO_AUFLD | Date of BOM Explosion/Routing Transfer | |
116 | Data Element | CO_AUFPL | Routing number of operations in the order | |
117 | Data Element | CO_AUFPL | Routing number of operations in the order | |
118 | Data Element | CO_AUFPL | Routing number of operations in the order | |
119 | Data Element | CO_AUTERM | Indicator: Schedule automatically | |
120 | Data Element | CO_CHG_TIME | Changed at | |
121 | Data Element | CO_COLORDPRC | Collective order with/without automatic goods movement | |
122 | Data Element | CO_DISPO | MRP controller for the order | |
123 | Data Element | CO_FLGMD | FAUF: Reading of master data executed | |
124 | Data Element | CO_FREIKZ | Indicator: Release order immediately | |
125 | Data Element | CO_FTRMI | Actual release date | |
126 | Data Element | CO_FTRMP | Planned release date | |
127 | Data Element | CO_FTRMS | Scheduled release date | |
128 | Data Element | CO_FTRPS | Scheduled release date (forecast) | |
129 | Data Element | CO_GETRI | Confirmed Order Finish Date | |
130 | Data Element | CO_GEUZI | Confirmed order finish (time) | |
131 | Data Element | CO_GIAMG | Expected variance from planned qty to be delivered to stock | |
132 | Data Element | CO_GLTPP | Finish date (forecast) | |
133 | Data Element | CO_GLTPS | Scheduled forecast finish | |
134 | Data Element | CO_GLTRI | Actual finish date | |
135 | Data Element | CO_GLTRP | Basic finish date | |
136 | Data Element | CO_GLTRS | Scheduled finish | |
137 | Data Element | CO_GLUPP | Forecast finish (time) | |
138 | Data Element | CO_GLUPS | Scheduled forecast finish time | |
139 | Data Element | CO_GLUZP | Basic finish (time) | |
140 | Data Element | CO_GLUZS | Scheduled finish time | |
141 | Data Element | CO_GMEIN | Common unit of measure for all order items | |
142 | Data Element | CO_GSTPP | Forecast start date | |
143 | Data Element | CO_GSTPS | Scheduled forecast start | |
144 | Data Element | CO_GSTRI | Actual start date | |
145 | Data Element | CO_GSTRP | Basic start date | |
146 | Data Element | CO_GSTRS | Scheduled start | |
147 | Data Element | CO_GSUPP | Forecast start (time) | |
148 | Data Element | CO_GSUPS | Scheduled start time (Forecast) | |
149 | Data Element | CO_GSUZI | Actual start time | |
150 | Data Element | CO_GSUZP | Basic start time | |
151 | Data Element | CO_GSUZS | Scheduled Start (Time) | |
152 | Data Element | CO_GWEMG | Delivered quantity | |
153 | Data Element | CO_IASMG | Scrap confirmed for order | |
154 | Data Element | CO_IGMNG | Yield confirmed from order confirmation | |
155 | Data Element | CO_KDAUF | Sales order number | |
156 | Data Element | CO_KDPOS | Sales order item | |
157 | Data Element | CO_KONSI | Selection: Consignment stock | |
158 | Data Element | CO_KONTI | Account assignment | |
159 | Data Element | CO_KORRK | Order conversion with the possibility of making corrections | |
160 | Data Element | CO_KSTEMPF | Indicator: Direct cost collector | |
161 | Data Element | CO_LAUFNR | Leading order in current processing | |
162 | Data Element | CO_LEIHG | Selection: Returnable packaging | |
163 | Data Element | CO_LKNOT | Left node in collective order | |
164 | Data Element | CO_LTEXT | Long text exists | |
165 | Data Element | CO_MATNR | Material Number for Order | |
166 | Data Element | CO_MATXT | Material description | |
167 | Data Element | CO_MBAUGR | Superior assembly | |
168 | Data Element | CO_MES_INT_ROUTINGID | Key of a Routing from an ME System | |
169 | Data Element | CO_MES_MAX_GAMNG | Maximum Value of Total Order Quantity After Distribution | |
170 | Data Element | CO_MIMEZ | Expected yield variance | |
171 | Data Element | CO_MLTPS | Order with multiple items | |
172 | Data Element | CO_NAUCOST | Indicator: Do not cost automatically | |
173 | Data Element | CO_NAUTERM | Indicator: Do not schedule automatically | |
174 | Data Element | CO_NOPCOST | Do not calculate planned costs for order | |
175 | Data Element | CO_PENDD | Outline finish of collective order (date) | |
176 | Data Element | CO_PENDT | Outline finish time | |
177 | Data Element | CO_PLAFKZ | Indicator: Convert planned order with RSNUM | |
178 | Data Element | CO_PLAUF | Date for routing transfer | |
179 | Data Element | CO_POSNR | Order item number | |
180 | Data Element | CO_POSNR | Order item number | |
181 | Data Element | CO_PRMBD | Check with requirements | |
182 | Data Element | CO_PRODNET | Indicator: Order is part of collective order | |
183 | Data Element | CO_PRODPRF | Production Scheduling Profile | |
184 | Data Element | CO_PSTARTD | Outline start of collective network (date) | |
185 | Data Element | CO_PSTARTT | Start time of a collective order | |
186 | Data Element | CO_RKNOT | Right node of a collective order | |
187 | Data Element | CO_RUECK | Completion confirmation number for the operation | |
188 | Data Element | CO_SDATB | To selection date | |
189 | Data Element | CO_SDATV | From selection date | |
190 | Data Element | CO_STTXT | System Status | |
191 | Data Element | CO_TEILNET | Number of superior network | |
192 | Data Element | CO_TM_FREI | Indicator: Order is (partially) released | |
193 | Data Element | CO_TM_TABG | Indicator: Order is technically completed | |
194 | Data Element | CO_UMSKZ | Indicator: Collective conversion of planned orders | |
195 | Data Element | CO_UPTER | Indicator: Change to Scheduled Dates | |
196 | Data Element | CREA_APL | Application code, where the order/network was created | |
197 | Data Element | CR_OBJID | Object ID of the resource | |
198 | Data Element | CR_OBJID | Object ID of the resource | |
199 | Data Element | CR_OBJTY | Object types of the CIM resource | |
200 | Data Element | CR_OBJTY | Object types of the CIM resource | |
201 | Data Element | CR_OBJTY | Object types of the CIM resource | |
202 | Data Element | CSPLIT | Apportionment structure | |
203 | Data Element | CUOBJ | Configuration (internal object number) | |
204 | Data Element | CY_SEQNR | Seq. number order | |
205 | Data Element | C_TIME | Time created | |
206 | Data Element | DATAN | Date of Technical Inspection | |
207 | Data Element | DATUV | Valid-From Date | |
208 | Data Element | DATUV | Valid-From Date | |
209 | Data Element | DAUFN | Standing order number | |
210 | Data Element | DEVICEID | Additional Device Data | |
211 | Data Element | DZKRIZ | Counter for additional criteria | |
212 | Data Element | EQFNR | Sort Field | |
213 | Data Element | EQUNR | Equipment Number | |
214 | Data Element | FEVOR | Production Supervisor | |
215 | Data Element | FHORI | Scheduling Margin Key for Floats | |
216 | Data Element | FKBER | Functional Area | |
217 | Data Element | FLAG | General Flag | |
218 | Data Element | FLAG | General Flag | |
219 | Data Element | FLGSER | Serial Number with Incomplete Equipment | |
220 | Data Element | FLG_ADDR | Ind: Address update must be called up | |
221 | Data Element | FLG_AOB | Indicator: relationships | |
222 | Data Element | FLG_ARBEI | Indicator: Default value work is relevant | |
223 | Data Element | FLG_CALC | Indicator: Order (network etc.) still to be calculated | |
224 | Data Element | FLG_DIRECT | Indicator: Direct function call | |
225 | Data Element | FLG_ENQ | Indicator: Order is locked | |
226 | Data Element | FLG_LFINF | Ind.: Book delivery information | |
227 | Data Element | FLG_LVS | Indicator: WM relevant change made | |
228 | Data Element | FLG_PARENT | Indicator: Order has dependent orders | |
229 | Data Element | FLG_PRINT | Indicator: Order still to be printed (internal field) | |
230 | Data Element | FLG_RUCK | Ind: Confirmation to be saved | |
231 | Data Element | FLG_SERV | Ind: Services must be updated | |
232 | Data Element | FLG_TERDIA | Indicator: Refill dialog table for scheduling | |
233 | Data Element | FLG_TERM | Indicator: Scheduling must take data changes into account | |
234 | Data Element | FLG_TRME | Indicator: Scheduling is carried out at least once | |
235 | Data Element | FLG_TRMV | Indicator: Operation changes relevant to scheduling | |
236 | Data Element | FREIZ | Release period (in days) | |
237 | Data Element | GAMNG | Total order quantity | |
238 | Data Element | GASMG | Total scrap quantity in the order | |
239 | Data Element | GAUZT | Planned downtime in hours | |
240 | Data Element | GERNR | Serial Number | |
241 | Data Element | GEWRK | Main work center for maintenance tasks | |
242 | Data Element | GSBER | Business Area | |
243 | Data Element | GSBER | Business Area | |
244 | Data Element | HISDA | PM request: History date | |
245 | Data Element | HISTU | Level (in Multi-Level BOM Explosions) | |
246 | Data Element | ILA | Maintenance activity type | |
247 | Data Element | ILOAI | ILOA Individual | |
248 | Data Element | ILOAN | Location and account assignment for technical object | |
249 | Data Element | ILOM_OWNER | Object reference indicator | |
250 | Data Element | IM_ABUKRS | Requesting company code | |
251 | Data Element | IM_PROFIL | Investment measure profile | |
252 | Data Element | IM_SIZECL | Scale of investment objects | |
253 | Data Element | INGRP | Planner Group for Customer Service and Plant Maintenance | |
254 | Data Element | INNAM | Name of the Maintenance Planner Group | |
255 | Data Element | INSPK | Name of Person Responsible for Technical Inspection | |
256 | Data Element | IWERK | Maintenance Planning Plant | |
257 | Data Element | IWERK | Maintenance Planning Plant | |
258 | Data Element | IZWEK | Reason for investment | |
259 | Data Element | JV_ETYPE | Equity type | |
260 | Data Element | JV_JIBCL | JIB/JIBE Class | |
261 | Data Element | JV_JIBSA | JIB/JIBE Subclass A | |
262 | Data Element | JV_NAME | Joint venture | |
263 | Data Element | JV_OR_CO | JV original cost object | |
264 | Data Element | JV_OTYPE | Joint Venture Object Type | |
265 | Data Element | JV_RECIND | Recovery Indicator | |
266 | Data Element | J_OBJNR | Object number | |
267 | Data Element | J_OBJNR | Object number | |
268 | Data Element | J_STSMA | Status Profile | |
269 | Data Element | KALKVARIST | Costing variant for actual costs | |
270 | Data Element | KALKVARPLN | Costing variant for planned costs | |
271 | Data Element | KALSMA_CH | Search procedure for batch determination | |
272 | Data Element | KALSN | Calendar Selection for Order | |
273 | Data Element | KAPPL | Application | |
274 | Data Element | KAPVERSA | Version of Available Capacity | |
275 | Data Element | KBED_D | Ind: do not create capacity requirements | |
276 | Data Element | KDAUF | Sales Order Number | |
277 | Data Element | KDPOS | Item number in Sales Order | |
278 | Data Element | KOKRS | Controlling Area | |
279 | Data Element | KOKRS | Controlling Area | |
280 | Data Element | KOSTL | Cost Center | |
281 | Data Element | KUNUM | Customer Number | |
282 | Data Element | KVEWE | Usage of the Condition Table | |
283 | Data Element | KZAVC | Indicator for type of availability check | |
284 | Data Element | K_SALDO | Order balance in controlling-area currency | |
285 | Data Element | LAUFN | Order number | |
286 | Data Element | LD_LINE | Line hierarchy | |
287 | Data Element | LGWID | Object ID of the Work Center | |
288 | Data Element | LOSBS | To Lot Size | |
289 | Data Element | LOSDIV | Lot size divisor | |
290 | Data Element | LOSGRBIS | To lot size | |
291 | Data Element | LOSGRVON | From Lot Size | |
292 | Data Element | LOSVN | From Lot Size | |
293 | Data Element | LZEIH | Unit for maximum storage period | |
294 | Data Element | MANDT | Client | |
295 | Data Element | MATNR | Material Number | |
296 | Data Element | MATNR | Material Number | |
297 | Data Element | MATNR | Material Number | |
298 | Data Element | MAUEH | Unit for Breakdown Duration | |
299 | Data Element | MAUFNR | Number of superior order | |
300 | Data Element | MAXLZ | Maximum storage period | |
301 | Data Element | MEINS | Base Unit of Measure | |
302 | Data Element | MEINS | Base Unit of Measure | |
303 | Data Element | NEND_IST | Actual finish for collective order (date) | |
304 | Data Element | NEND_TRM | Scheduled finish date of collective order (date) | |
305 | Data Element | NENT_IST | Actual finish collective order (time) | |
306 | Data Element | NENT_TRM | Scheduled finish collective order (time) | |
307 | Data Element | NETZKONT | Indicator for the account assignment of a network(hdr/act.) | |
308 | Data Element | NO_DISP_PLUS | Effective for Materials Planning | |
309 | Data Element | NPLDA | Next planned date | |
310 | Data Element | NSTART_IST | Actual start collective order (date) | |
311 | Data Element | NSTART_TRM | Scheduled start date of collective order (date) | |
312 | Data Element | NSTT_IST | Actual start collective order (time) | |
313 | Data Element | NSTT_TRM | Scheduled start collective order (time) | |
314 | Data Element | NWART | Type of network | |
315 | Data Element | OBJEKTID | Object ID | |
316 | Data Element | OBJKNR | Object list number | |
317 | Data Element | OCM_CH_PROC | Process that has lead to the change of an object | |
318 | Data Element | OCM_COMP_RES | OCM: Result of comparison of two order objects | |
319 | Data Element | OCM_OBJ_TYPE | Change indicator | |
320 | Data Element | O_SALDO | Order balance in order currency | |
321 | Data Element | PKNUM | Control cycle number | |
322 | Data Element | PKOSA_D | Cost collector for production process PROCNR | |
323 | Data Element | PKPOS | Kanban item number / control cycle item | |
324 | Data Element | PLART_TX | Description of the basis for scheduling | |
325 | Data Element | PLGKZ | Identifier for planning with line items | |
326 | Data Element | PLNAL | Group Counter | |
327 | Data Element | PLNAW | Application of the task list | |
328 | Data Element | PLNME | Task list unit of measure | |
329 | Data Element | PLNNR | Key for Task List Group | |
330 | Data Element | PLNNR_REF | Number of standard networks to be copied | |
331 | Data Element | PLNTY | Task List Type | |
332 | Data Element | PLN_VERWE | Task list usage | |
333 | Data Element | PLVAR | Plan Version | |
334 | Data Element | PM_ABR_FLG | Flag: Maintenance plan call | |
335 | Data Element | PM_OBJTY | Object Type of CIM Resources for Work Center | |
336 | Data Element | PM_PHASE | Maintenance Processing Phase | |
337 | Data Element | PM_PRT_FLG | Indicator: Order Printing Requested | |
338 | Data Element | PM_WO_FLG | Indicator: Order Creation from PM Notification | |
339 | Data Element | POSNR | Item number of the SD document | |
340 | Data Element | POSNR | Item number of the SD document | |
341 | Data Element | PPSID | Object ID of PP work center | |
342 | Data Element | PRCTR | Profit Center | |
343 | Data Element | PRIOK | Priority | |
344 | Data Element | PROFIDNZPL | Network profile | |
345 | Data Element | PRREG | Checking rule for the availability check | |
346 | Data Element | PRTRV | Indicator: Project date definition | |
347 | Data Element | PS_AKSTL | Requesting cost center | |
348 | Data Element | PS_KZERB | Indicator: Project summarization | |
349 | Data Element | PS_PLART | Basis for scheduling | |
350 | Data Element | PS_PSP_PNR | Work Breakdown Structure Element (WBS Element) | |
351 | Data Element | PS_PSP_PNR | Work Breakdown Structure Element (WBS Element) | |
352 | Data Element | PS_PSP_PNR | Work Breakdown Structure Element (WBS Element) | |
353 | Data Element | PS_PSP_PRO | Project definition | |
354 | Data Element | PS_SPS_ELE | Standard WBS element | |
355 | Data Element | PS_TERMBAS | Set of dates for network | |
356 | Data Element | QMNUM | Message Number | |
357 | Data Element | QPLOS | Inspection Lot Number | |
358 | Data Element | RAUMNR | Room | |
359 | Data Element | REDKZ | Reduction indicator for scheduling | |
360 | Data Element | REDKZP | Reduction indicator for scheduling (forecast) | |
361 | Data Element | REDKZ_TX | Description of reduction indicator | |
362 | Data Element | REVLV | Revision level | |
363 | Data Element | REVNI | Revision of Plant Maintenance and Customer Service | |
364 | Data Element | RGEKZ | Indicator: Backflush | |
365 | Data Element | RMNGA | Total confirmed rework quantity | |
366 | Data Element | RSNUM | Number of reservation/dependent requirements | |
367 | Data Element | RSNUM | Number of reservation/dependent requirements | |
368 | Data Element | RSORD | Refurbishment order indicator (PM) | |
369 | Data Element | RSUPG | Upgrade Order Indicator | |
370 | Data Element | SCOPE_CV | Object Class | |
371 | Data Element | SCRTP | Scenario or Subscreen Category | |
372 | Data Element | SELKZ | Selection flag | |
373 | Data Element | SICHZ | Float after production (in days) | |
374 | Data Element | SICHZ_TRM | Scheduled float after production in days | |
375 | Data Element | SPART | Division | |
376 | Data Element | SPLIT_STAT | Status of an order in a split hierarchy | |
377 | Data Element | STALT | Alternative BOM | |
378 | Data Element | STLAN | BOM Usage | |
379 | Data Element | STLST | BOM Statuses | |
380 | Data Element | STLTY | BOM Category | |
381 | Data Element | STNUM | Bill of Material | |
382 | Data Element | STORT | Asset location | |
383 | Data Element | SUPKZ | Statistics update indicator (post in/post out) | |
384 | Data Element | SWERK | Maintenance Plant | |
385 | Data Element | SYSUUID_X | UUID in X form (binary) | |
386 | Data Element | TABIX_D | Field defined as in SY-TABIX | |
387 | Data Element | TERHW | Scheduling note from order scheduling | |
388 | Data Element | TERMKZ | Scheduling type | |
389 | Data Element | TERMKZP | Scheduling type (forecast) | |
390 | Data Element | TERMKZ_TXT | Description of scheduling type | |
391 | Data Element | TERMKZ_TXT | Description of scheduling type | |
392 | Data Element | TEXT40 | Text, 40 Characters Long | |
393 | Data Element | TIMESTAMPL | UTC Time Stamp in Long Form (YYYYMMDDhhmmssmmmuuun) | |
394 | Data Element | TMBAS_TX | Description of the planning type | |
395 | Data Element | TPLNR | Functional Location | |
396 | Data Element | TRMDT | Date of the last scheduling | |
397 | Data Element | TXCHG | Indicator: long text changed | |
398 | Data Element | TXJCD | Tax Jurisdiction | |
399 | Data Element | TYPKZ | Type of object causing the load (order category) | |
400 | Data Element | UII_CHAR72 | Unique Item Identifier | |
401 | Data Element | VAGRP | Responsible planner group/department | |
402 | Data Element | VAGRP | Responsible planner group/department | |
403 | Data Element | VANTW | Person/Group responsible for the network | |
404 | Data Element | VBELN | Sales and Distribution Document Number | |
405 | Data Element | VBKZ | Update indicator | |
406 | Data Element | VKORG | Sales Organization | |
407 | Data Element | VORGZ | Float before production (in days) | |
408 | Data Element | VORGZ_TRM | Scheduled float before production in days | |
409 | Data Element | VSINACT | Version inactive indicator | |
410 | Data Element | VSNMR | Number or description of a version | |
411 | Data Element | VSNMR_V | Sales document version number | |
412 | Data Element | VTWEG | Distribution Channel | |
413 | Data Element | WAPOS | Maintenance item | |
414 | Data Element | WARPL | Maintenance Plan | |
415 | Data Element | WEGXX | Path (for Multi-Level BOM Explosions) | |
416 | Data Element | WEGXX | Path (for Multi-Level BOM Explosions) | |
417 | Data Element | WERGW | Plant associated with main work center | |
418 | Data Element | WERKS_D | Plant | |
419 | Data Element | WFCID | Factory Calendar | |
420 | Data Element | XFELD | Checkbox | |
421 | Data Element | XFELD | Checkbox | |
422 | Data Element | XFELD | Checkbox |