Data Element list used by SAP ABAP Table MCCAUFV (Document Table Structure of Order Header with SUPKZ)
SAP ABAP Table
MCCAUFV (Document Table Structure of Order Header with SUPKZ) is using
# | Object Type | Object Name | Object Description | Note |
---|---|---|---|---|
![]() |
![]() |
|||
1 | ![]() |
/CUM/AUEST | CU: Automatic Copy of Estimated Costs | |
2 | ![]() |
/CUM/CMNUM | CU: Construction Measure Number | |
3 | ![]() |
/CUM/DESGUID | CU: GUID of Design Document | |
4 | ![]() |
/CUM/DESNUM | CU: Design Number | |
5 | ![]() |
/CUM/INDCU | CU: Order is Used for Compatible Units | |
6 | ![]() |
/CUM/INTCUNR | CU: Internal CU Number in a Work Order | |
7 | ![]() |
/ISDFPS/MEQUI | Master Equipment | |
8 | ![]() |
ABCKZ | ABC Indicator for Technical Object | |
9 | ![]() |
ABGR_SCHL | Results Analysis Key | |
10 | ![]() |
ABNUM | Maintenance Plan Call Number | |
11 | ![]() |
ADDAT | PM Order: Reference Date | |
12 | ![]() |
ADDCOMPARE_CORE | Reference Element PM/PS | |
13 | ![]() |
ADUHR | Time of Reference Date | |
14 | ![]() |
AD_ADDRNUM | Address number | |
15 | ![]() |
AEKNZ | Change indicator | |
16 | ![]() |
AEKNZ | Change indicator | |
17 | ![]() |
AEKNZ | Change indicator | |
18 | ![]() |
AEKNZ | Change indicator | |
19 | ![]() |
AEKNZ | Change indicator | |
20 | ![]() |
AEKNZ | Change indicator | |
21 | ![]() |
AEKNZ | Change indicator | |
22 | ![]() |
AEKNZ | Change indicator | |
23 | ![]() |
AEKNZ | Change indicator | |
24 | ![]() |
AEKNZ | Change indicator | |
25 | ![]() |
AEKNZ | Change indicator | |
26 | ![]() |
AEKNZ | Change indicator | |
27 | ![]() |
AENNR | Change Number | |
28 | ![]() |
AENNR | Change Number | |
29 | ![]() |
AENNR | Change Number | |
30 | ![]() |
AFAKT | Execution Factor | |
31 | ![]() |
AKKNZ | Order Category Indicator Plant Maintenance | |
32 | ![]() |
AM_UMWKZ | Reason for environmental investment | |
33 | ![]() |
ANING | Name of Person Reponsible for System | |
34 | ![]() |
ANLBD | Date until which the system is available | |
35 | ![]() |
ANLBZ | Time until which the system is available | |
36 | ![]() |
ANLN1 | Main Asset Number | |
37 | ![]() |
ANLN2 | Asset Subnumber | |
38 | ![]() |
ANLVD | Date from which the system is available | |
39 | ![]() |
ANLVZ | Time from Which System is Available | |
40 | ![]() |
ANLZU | Syst.Condition | |
41 | ![]() |
AP_KTEXT | Short text for the work center | |
42 | ![]() |
ARTPR | Priority Type | |
43 | ![]() |
ATRKZ | Request ID | |
44 | ![]() |
AUDISP_PLUS | Reservation Relevance/Generation of Purchase Requisition | |
45 | ![]() |
AUFABKRS | Processing group | |
46 | ![]() |
AUFAEDAT | Change date for Order Master | |
47 | ![]() |
AUFAENAM | Last changed by | |
48 | ![]() |
AUFART | Order Type | |
49 | ![]() |
AUFERFDAT | Created on | |
50 | ![]() |
AUFERFNAM | Entered by | |
51 | ![]() |
AUFIDAT2 | Technical completion date | |
52 | ![]() |
AUFKALSM | Costing Sheet | |
53 | ![]() |
AUFKOSTV | Responsible cost center | |
54 | ![]() |
AUFKSTAR | Settlement cost element | |
55 | ![]() |
AUFLOEKZ | Deletion flag | |
56 | ![]() |
AUFLTEXT | Long Text Exists | |
57 | ![]() |
AUFNR | Order Number | |
58 | ![]() |
AUFNR | Order Number | |
59 | ![]() |
AUFNR | Order Number | |
60 | ![]() |
AUFNR | Order Number | |
61 | ![]() |
AUFREFNR | Reference order number | |
62 | ![]() |
AUFSOWRK | Location plant | |
63 | ![]() |
AUFSTKZ | Identifier for statistical order | |
64 | ![]() |
AUFTEXT | Description | |
65 | ![]() |
AUFTYP | Order category | |
66 | ![]() |
AUFUSER4 | Estimated total costs of order | |
67 | ![]() |
AUFWAERS | Order Currency | |
68 | ![]() |
AUFZSCHL | Overhead key | |
69 | ![]() |
AUF_PLKNZ | Maintenance order planning indicator | |
70 | ![]() |
AUKBED | Indicator: Calculate capacity requirements | |
71 | ![]() |
AVOUEB | Indicator: Display operation overview | |
72 | ![]() |
AWSLS | Variance Key | |
73 | ![]() |
BASMN | Base quantity | |
74 | ![]() |
BASMN | Base quantity | |
75 | ![]() |
BASMN | Base quantity | |
76 | ![]() |
BAUTL | Assembly | |
77 | ![]() |
BEBER | Organizational Area | |
78 | ![]() |
BEDID | ID of the capacity requirements record | |
79 | ![]() |
BEDID | ID of the capacity requirements record | |
80 | ![]() |
BEDID | ID of the capacity requirements record | |
81 | ![]() |
BEMOT | Accounting Indicator | |
82 | ![]() |
BREAKS | Indicator: Scheduling allowing for breaks | |
83 | ![]() |
BUKRS | Company Code | |
84 | ![]() |
BUKRS | Company Code | |
85 | ![]() |
CADNR | Addresses: Address Number | |
86 | ![]() |
CCKEY | Cost collector key | |
87 | ![]() |
CCOBJID | Object ID | |
88 | ![]() |
CC_CONF_KEY | Identical object | |
89 | ![]() |
CFB_ADTDAYS | Additional Days | |
90 | ![]() |
CFB_BBD_PPPI | Best-Before Date (BBD)/ Shelf Life Expiration Date (SLED) | |
91 | ![]() |
CFB_DATOFM | Date of Manufacture | |
92 | ![]() |
CIM_COUNT | Internal counter | |
93 | ![]() |
CIM_COUNT | Internal counter | |
94 | ![]() |
CIM_COUNT | Internal counter | |
95 | ![]() |
CKML_F_PROCNR | Production Process | |
96 | ![]() |
CKML_PROZESS_TYP | Process Category (Procurement/Consumption) | |
97 | ![]() |
CK_LOSGR | Costing lot size | |
98 | ![]() |
CN_AUTH | Ind.: Authorization exists | |
99 | ![]() |
CN_AUTH | Ind.: Authorization exists | |
100 | ![]() |
CN_AUTH | Ind.: Authorization exists | |
101 | ![]() |
CN_AUTH | Ind.: Authorization exists | |
102 | ![]() |
CN_AUTH | Ind.: Authorization exists | |
103 | ![]() |
CN_AUTH | Ind.: Authorization exists | |
104 | ![]() |
CN_AUTH | Ind.: Authorization exists | |
105 | ![]() |
CN_COSTUPD | Costs are updated | |
106 | ![]() |
COMP_CALC | Indicator: Components will not be costed | |
107 | ![]() |
CO_ABARB | Confirmation: Degree of processing | |
108 | ![]() |
CO_APLZL | General counter for order | |
109 | ![]() |
CO_APRIO | Order priority | |
110 | ![]() |
CO_APROZ | Scrap percentage | |
111 | ![]() |
CO_APROZ | Scrap percentage | |
112 | ![]() |
CO_ASTEX | User status active | |
113 | ![]() |
CO_ASTTX | Field displaying user status | |
114 | ![]() |
CO_AUCOST | Indicator: Cost automatically | |
115 | ![]() |
CO_AUFLD | Date of BOM Explosion/Routing Transfer | |
116 | ![]() |
CO_AUFPL | Routing number of operations in the order | |
117 | ![]() |
CO_AUFPL | Routing number of operations in the order | |
118 | ![]() |
CO_AUFPL | Routing number of operations in the order | |
119 | ![]() |
CO_AUTERM | Indicator: Schedule automatically | |
120 | ![]() |
CO_CHG_TIME | Changed at | |
121 | ![]() |
CO_COLORDPRC | Collective order with/without automatic goods movement | |
122 | ![]() |
CO_DISPO | MRP controller for the order | |
123 | ![]() |
CO_FLGMD | FAUF: Reading of master data executed | |
124 | ![]() |
CO_FREIKZ | Indicator: Release order immediately | |
125 | ![]() |
CO_FTRMI | Actual release date | |
126 | ![]() |
CO_FTRMP | Planned release date | |
127 | ![]() |
CO_FTRMS | Scheduled release date | |
128 | ![]() |
CO_FTRPS | Scheduled release date (forecast) | |
129 | ![]() |
CO_GETRI | Confirmed Order Finish Date | |
130 | ![]() |
CO_GEUZI | Confirmed order finish (time) | |
131 | ![]() |
CO_GIAMG | Expected variance from planned qty to be delivered to stock | |
132 | ![]() |
CO_GLTPP | Finish date (forecast) | |
133 | ![]() |
CO_GLTPS | Scheduled forecast finish | |
134 | ![]() |
CO_GLTRI | Actual finish date | |
135 | ![]() |
CO_GLTRP | Basic finish date | |
136 | ![]() |
CO_GLTRS | Scheduled finish | |
137 | ![]() |
CO_GLUPP | Forecast finish (time) | |
138 | ![]() |
CO_GLUPS | Scheduled forecast finish time | |
139 | ![]() |
CO_GLUZP | Basic finish (time) | |
140 | ![]() |
CO_GLUZS | Scheduled finish time | |
141 | ![]() |
CO_GMEIN | Common unit of measure for all order items | |
142 | ![]() |
CO_GSTPP | Forecast start date | |
143 | ![]() |
CO_GSTPS | Scheduled forecast start | |
144 | ![]() |
CO_GSTRI | Actual start date | |
145 | ![]() |
CO_GSTRP | Basic start date | |
146 | ![]() |
CO_GSTRS | Scheduled start | |
147 | ![]() |
CO_GSUPP | Forecast start (time) | |
148 | ![]() |
CO_GSUPS | Scheduled start time (Forecast) | |
149 | ![]() |
CO_GSUZI | Actual start time | |
150 | ![]() |
CO_GSUZP | Basic start time | |
151 | ![]() |
CO_GSUZS | Scheduled Start (Time) | |
152 | ![]() |
CO_GWEMG | Delivered quantity | |
153 | ![]() |
CO_IASMG | Scrap confirmed for order | |
154 | ![]() |
CO_IGMNG | Yield confirmed from order confirmation | |
155 | ![]() |
CO_KDAUF | Sales order number | |
156 | ![]() |
CO_KDPOS | Sales order item | |
157 | ![]() |
CO_KONSI | Selection: Consignment stock | |
158 | ![]() |
CO_KONTI | Account assignment | |
159 | ![]() |
CO_KORRK | Order conversion with the possibility of making corrections | |
160 | ![]() |
CO_KSTEMPF | Indicator: Direct cost collector | |
161 | ![]() |
CO_LAUFNR | Leading order in current processing | |
162 | ![]() |
CO_LEIHG | Selection: Returnable packaging | |
163 | ![]() |
CO_LKNOT | Left node in collective order | |
164 | ![]() |
CO_LTEXT | Long text exists | |
165 | ![]() |
CO_MATNR | Material Number for Order | |
166 | ![]() |
CO_MATXT | Material description | |
167 | ![]() |
CO_MBAUGR | Superior assembly | |
168 | ![]() |
CO_MES_INT_ROUTINGID | Key of a Routing from an ME System | |
169 | ![]() |
CO_MES_MAX_GAMNG | Maximum Value of Total Order Quantity After Distribution | |
170 | ![]() |
CO_MIMEZ | Expected yield variance | |
171 | ![]() |
CO_MLTPS | Order with multiple items | |
172 | ![]() |
CO_NAUCOST | Indicator: Do not cost automatically | |
173 | ![]() |
CO_NAUTERM | Indicator: Do not schedule automatically | |
174 | ![]() |
CO_NOPCOST | Do not calculate planned costs for order | |
175 | ![]() |
CO_PENDD | Outline finish of collective order (date) | |
176 | ![]() |
CO_PENDT | Outline finish time | |
177 | ![]() |
CO_PLAFKZ | Indicator: Convert planned order with RSNUM | |
178 | ![]() |
CO_PLAUF | Date for routing transfer | |
179 | ![]() |
CO_POSNR | Order item number | |
180 | ![]() |
CO_POSNR | Order item number | |
181 | ![]() |
CO_PRMBD | Check with requirements | |
182 | ![]() |
CO_PRODNET | Indicator: Order is part of collective order | |
183 | ![]() |
CO_PRODPRF | Production Scheduling Profile | |
184 | ![]() |
CO_PSTARTD | Outline start of collective network (date) | |
185 | ![]() |
CO_PSTARTT | Start time of a collective order | |
186 | ![]() |
CO_RKNOT | Right node of a collective order | |
187 | ![]() |
CO_RUECK | Completion confirmation number for the operation | |
188 | ![]() |
CO_SDATB | To selection date | |
189 | ![]() |
CO_SDATV | From selection date | |
190 | ![]() |
CO_STTXT | System Status | |
191 | ![]() |
CO_TEILNET | Number of superior network | |
192 | ![]() |
CO_TM_FREI | Indicator: Order is (partially) released | |
193 | ![]() |
CO_TM_TABG | Indicator: Order is technically completed | |
194 | ![]() |
CO_UMSKZ | Indicator: Collective conversion of planned orders | |
195 | ![]() |
CO_UPTER | Indicator: Change to Scheduled Dates | |
196 | ![]() |
CREA_APL | Application code, where the order/network was created | |
197 | ![]() |
CR_OBJID | Object ID of the resource | |
198 | ![]() |
CR_OBJID | Object ID of the resource | |
199 | ![]() |
CR_OBJTY | Object types of the CIM resource | |
200 | ![]() |
CR_OBJTY | Object types of the CIM resource | |
201 | ![]() |
CR_OBJTY | Object types of the CIM resource | |
202 | ![]() |
CSPLIT | Apportionment structure | |
203 | ![]() |
CUOBJ | Configuration (internal object number) | |
204 | ![]() |
CY_SEQNR | Seq. number order | |
205 | ![]() |
C_TIME | Time created | |
206 | ![]() |
DATAN | Date of Technical Inspection | |
207 | ![]() |
DATUV | Valid-From Date | |
208 | ![]() |
DATUV | Valid-From Date | |
209 | ![]() |
DAUFN | Standing order number | |
210 | ![]() |
DEVICEID | Additional Device Data | |
211 | ![]() |
DZKRIZ | Counter for additional criteria | |
212 | ![]() |
EQFNR | Sort Field | |
213 | ![]() |
EQUNR | Equipment Number | |
214 | ![]() |
FEVOR | Production Supervisor | |
215 | ![]() |
FHORI | Scheduling Margin Key for Floats | |
216 | ![]() |
FKBER | Functional Area | |
217 | ![]() |
FLAG | General Flag | |
218 | ![]() |
FLAG | General Flag | |
219 | ![]() |
FLGSER | Serial Number with Incomplete Equipment | |
220 | ![]() |
FLG_ADDR | Ind: Address update must be called up | |
221 | ![]() |
FLG_AOB | Indicator: relationships | |
222 | ![]() |
FLG_ARBEI | Indicator: Default value work is relevant | |
223 | ![]() |
FLG_CALC | Indicator: Order (network etc.) still to be calculated | |
224 | ![]() |
FLG_DIRECT | Indicator: Direct function call | |
225 | ![]() |
FLG_ENQ | Indicator: Order is locked | |
226 | ![]() |
FLG_LFINF | Ind.: Book delivery information | |
227 | ![]() |
FLG_LVS | Indicator: WM relevant change made | |
228 | ![]() |
FLG_PARENT | Indicator: Order has dependent orders | |
229 | ![]() |
FLG_PRINT | Indicator: Order still to be printed (internal field) | |
230 | ![]() |
FLG_RUCK | Ind: Confirmation to be saved | |
231 | ![]() |
FLG_SERV | Ind: Services must be updated | |
232 | ![]() |
FLG_TERDIA | Indicator: Refill dialog table for scheduling | |
233 | ![]() |
FLG_TERM | Indicator: Scheduling must take data changes into account | |
234 | ![]() |
FLG_TRME | Indicator: Scheduling is carried out at least once | |
235 | ![]() |
FLG_TRMV | Indicator: Operation changes relevant to scheduling | |
236 | ![]() |
FREIZ | Release period (in days) | |
237 | ![]() |
GAMNG | Total order quantity | |
238 | ![]() |
GASMG | Total scrap quantity in the order | |
239 | ![]() |
GAUZT | Planned downtime in hours | |
240 | ![]() |
GERNR | Serial Number | |
241 | ![]() |
GEWRK | Main work center for maintenance tasks | |
242 | ![]() |
GSBER | Business Area | |
243 | ![]() |
GSBER | Business Area | |
244 | ![]() |
HISDA | PM request: History date | |
245 | ![]() |
HISTU | Level (in Multi-Level BOM Explosions) | |
246 | ![]() |
ILA | Maintenance activity type | |
247 | ![]() |
ILOAI | ILOA Individual | |
248 | ![]() |
ILOAN | Location and account assignment for technical object | |
249 | ![]() |
ILOM_OWNER | Object reference indicator | |
250 | ![]() |
IM_ABUKRS | Requesting company code | |
251 | ![]() |
IM_PROFIL | Investment measure profile | |
252 | ![]() |
IM_SIZECL | Scale of investment objects | |
253 | ![]() |
INGRP | Planner Group for Customer Service and Plant Maintenance | |
254 | ![]() |
INNAM | Name of the Maintenance Planner Group | |
255 | ![]() |
INSPK | Name of Person Responsible for Technical Inspection | |
256 | ![]() |
IWERK | Maintenance Planning Plant | |
257 | ![]() |
IWERK | Maintenance Planning Plant | |
258 | ![]() |
IZWEK | Reason for investment | |
259 | ![]() |
JV_ETYPE | Equity type | |
260 | ![]() |
JV_JIBCL | JIB/JIBE Class | |
261 | ![]() |
JV_JIBSA | JIB/JIBE Subclass A | |
262 | ![]() |
JV_NAME | Joint venture | |
263 | ![]() |
JV_OR_CO | JV original cost object | |
264 | ![]() |
JV_OTYPE | Joint Venture Object Type | |
265 | ![]() |
JV_RECIND | Recovery Indicator | |
266 | ![]() |
J_OBJNR | Object number | |
267 | ![]() |
J_OBJNR | Object number | |
268 | ![]() |
J_STSMA | Status Profile | |
269 | ![]() |
KALKVARIST | Costing variant for actual costs | |
270 | ![]() |
KALKVARPLN | Costing variant for planned costs | |
271 | ![]() |
KALSMA_CH | Search procedure for batch determination | |
272 | ![]() |
KALSN | Calendar Selection for Order | |
273 | ![]() |
KAPPL | Application | |
274 | ![]() |
KAPVERSA | Version of Available Capacity | |
275 | ![]() |
KBED_D | Ind: do not create capacity requirements | |
276 | ![]() |
KDAUF | Sales Order Number | |
277 | ![]() |
KDPOS | Item number in Sales Order | |
278 | ![]() |
KOKRS | Controlling Area | |
279 | ![]() |
KOKRS | Controlling Area | |
280 | ![]() |
KOSTL | Cost Center | |
281 | ![]() |
KUNUM | Customer Number | |
282 | ![]() |
KVEWE | Usage of the Condition Table | |
283 | ![]() |
KZAVC | Indicator for type of availability check | |
284 | ![]() |
K_SALDO | Order balance in controlling-area currency | |
285 | ![]() |
LAUFN | Order number | |
286 | ![]() |
LD_LINE | Line hierarchy | |
287 | ![]() |
LGWID | Object ID of the Work Center | |
288 | ![]() |
LOSBS | To Lot Size | |
289 | ![]() |
LOSDIV | Lot size divisor | |
290 | ![]() |
LOSGRBIS | To lot size | |
291 | ![]() |
LOSGRVON | From Lot Size | |
292 | ![]() |
LOSVN | From Lot Size | |
293 | ![]() |
LZEIH | Unit for maximum storage period | |
294 | ![]() |
MANDT | Client | |
295 | ![]() |
MATNR | Material Number | |
296 | ![]() |
MATNR | Material Number | |
297 | ![]() |
MATNR | Material Number | |
298 | ![]() |
MAUEH | Unit for Breakdown Duration | |
299 | ![]() |
MAUFNR | Number of superior order | |
300 | ![]() |
MAXLZ | Maximum storage period | |
301 | ![]() |
MEINS | Base Unit of Measure | |
302 | ![]() |
MEINS | Base Unit of Measure | |
303 | ![]() |
NEND_IST | Actual finish for collective order (date) | |
304 | ![]() |
NEND_TRM | Scheduled finish date of collective order (date) | |
305 | ![]() |
NENT_IST | Actual finish collective order (time) | |
306 | ![]() |
NENT_TRM | Scheduled finish collective order (time) | |
307 | ![]() |
NETZKONT | Indicator for the account assignment of a network(hdr/act.) | |
308 | ![]() |
NO_DISP_PLUS | Effective for Materials Planning | |
309 | ![]() |
NPLDA | Next planned date | |
310 | ![]() |
NSTART_IST | Actual start collective order (date) | |
311 | ![]() |
NSTART_TRM | Scheduled start date of collective order (date) | |
312 | ![]() |
NSTT_IST | Actual start collective order (time) | |
313 | ![]() |
NSTT_TRM | Scheduled start collective order (time) | |
314 | ![]() |
NWART | Type of network | |
315 | ![]() |
OBJEKTID | Object ID | |
316 | ![]() |
OBJKNR | Object list number | |
317 | ![]() |
OCM_CH_PROC | Process that has lead to the change of an object | |
318 | ![]() |
OCM_COMP_RES | OCM: Result of comparison of two order objects | |
319 | ![]() |
OCM_OBJ_TYPE | Change indicator | |
320 | ![]() |
O_SALDO | Order balance in order currency | |
321 | ![]() |
PKNUM | Control cycle number | |
322 | ![]() |
PKOSA_D | Cost collector for production process PROCNR | |
323 | ![]() |
PKPOS | Kanban item number / control cycle item | |
324 | ![]() |
PLART_TX | Description of the basis for scheduling | |
325 | ![]() |
PLGKZ | Identifier for planning with line items | |
326 | ![]() |
PLNAL | Group Counter | |
327 | ![]() |
PLNAW | Application of the task list | |
328 | ![]() |
PLNME | Task list unit of measure | |
329 | ![]() |
PLNNR | Key for Task List Group | |
330 | ![]() |
PLNNR_REF | Number of standard networks to be copied | |
331 | ![]() |
PLNTY | Task List Type | |
332 | ![]() |
PLN_VERWE | Task list usage | |
333 | ![]() |
PLVAR | Plan Version | |
334 | ![]() |
PM_ABR_FLG | Flag: Maintenance plan call | |
335 | ![]() |
PM_OBJTY | Object Type of CIM Resources for Work Center | |
336 | ![]() |
PM_PHASE | Maintenance Processing Phase | |
337 | ![]() |
PM_PRT_FLG | Indicator: Order Printing Requested | |
338 | ![]() |
PM_WO_FLG | Indicator: Order Creation from PM Notification | |
339 | ![]() |
POSNR | Item number of the SD document | |
340 | ![]() |
POSNR | Item number of the SD document | |
341 | ![]() |
PPSID | Object ID of PP work center | |
342 | ![]() |
PRCTR | Profit Center | |
343 | ![]() |
PRIOK | Priority | |
344 | ![]() |
PROFIDNZPL | Network profile | |
345 | ![]() |
PRREG | Checking rule for the availability check | |
346 | ![]() |
PRTRV | Indicator: Project date definition | |
347 | ![]() |
PS_AKSTL | Requesting cost center | |
348 | ![]() |
PS_KZERB | Indicator: Project summarization | |
349 | ![]() |
PS_PLART | Basis for scheduling | |
350 | ![]() |
PS_PSP_PNR | Work Breakdown Structure Element (WBS Element) | |
351 | ![]() |
PS_PSP_PNR | Work Breakdown Structure Element (WBS Element) | |
352 | ![]() |
PS_PSP_PNR | Work Breakdown Structure Element (WBS Element) | |
353 | ![]() |
PS_PSP_PRO | Project definition | |
354 | ![]() |
PS_SPS_ELE | Standard WBS element | |
355 | ![]() |
PS_TERMBAS | Set of dates for network | |
356 | ![]() |
QMNUM | Message Number | |
357 | ![]() |
QPLOS | Inspection Lot Number | |
358 | ![]() |
RAUMNR | Room | |
359 | ![]() |
REDKZ | Reduction indicator for scheduling | |
360 | ![]() |
REDKZP | Reduction indicator for scheduling (forecast) | |
361 | ![]() |
REDKZ_TX | Description of reduction indicator | |
362 | ![]() |
REVLV | Revision level | |
363 | ![]() |
REVNI | Revision of Plant Maintenance and Customer Service | |
364 | ![]() |
RGEKZ | Indicator: Backflush | |
365 | ![]() |
RMNGA | Total confirmed rework quantity | |
366 | ![]() |
RSNUM | Number of reservation/dependent requirements | |
367 | ![]() |
RSNUM | Number of reservation/dependent requirements | |
368 | ![]() |
RSORD | Refurbishment order indicator (PM) | |
369 | ![]() |
RSUPG | Upgrade Order Indicator | |
370 | ![]() |
SCOPE_CV | Object Class | |
371 | ![]() |
SCRTP | Scenario or Subscreen Category | |
372 | ![]() |
SELKZ | Selection flag | |
373 | ![]() |
SICHZ | Float after production (in days) | |
374 | ![]() |
SICHZ_TRM | Scheduled float after production in days | |
375 | ![]() |
SPART | Division | |
376 | ![]() |
SPLIT_STAT | Status of an order in a split hierarchy | |
377 | ![]() |
STALT | Alternative BOM | |
378 | ![]() |
STLAN | BOM Usage | |
379 | ![]() |
STLST | BOM Statuses | |
380 | ![]() |
STLTY | BOM Category | |
381 | ![]() |
STNUM | Bill of Material | |
382 | ![]() |
STORT | Asset location | |
383 | ![]() |
SUPKZ | Statistics update indicator (post in/post out) | |
384 | ![]() |
SWERK | Maintenance Plant | |
385 | ![]() |
SYSUUID_X | UUID in X form (binary) | |
386 | ![]() |
TABIX_D | Field defined as in SY-TABIX | |
387 | ![]() |
TERHW | Scheduling note from order scheduling | |
388 | ![]() |
TERMKZ | Scheduling type | |
389 | ![]() |
TERMKZP | Scheduling type (forecast) | |
390 | ![]() |
TERMKZ_TXT | Description of scheduling type | |
391 | ![]() |
TERMKZ_TXT | Description of scheduling type | |
392 | ![]() |
TEXT40 | Text, 40 Characters Long | |
393 | ![]() |
TIMESTAMPL | UTC Time Stamp in Long Form (YYYYMMDDhhmmssmmmuuun) | |
394 | ![]() |
TMBAS_TX | Description of the planning type | |
395 | ![]() |
TPLNR | Functional Location | |
396 | ![]() |
TRMDT | Date of the last scheduling | |
397 | ![]() |
TXCHG | Indicator: long text changed | |
398 | ![]() |
TXJCD | Tax Jurisdiction | |
399 | ![]() |
TYPKZ | Type of object causing the load (order category) | |
400 | ![]() |
UII_CHAR72 | Unique Item Identifier | |
401 | ![]() |
VAGRP | Responsible planner group/department | |
402 | ![]() |
VAGRP | Responsible planner group/department | |
403 | ![]() |
VANTW | Person/Group responsible for the network | |
404 | ![]() |
VBELN | Sales and Distribution Document Number | |
405 | ![]() |
VBKZ | Update indicator | |
406 | ![]() |
VKORG | Sales Organization | |
407 | ![]() |
VORGZ | Float before production (in days) | |
408 | ![]() |
VORGZ_TRM | Scheduled float before production in days | |
409 | ![]() |
VSINACT | Version inactive indicator | |
410 | ![]() |
VSNMR | Number or description of a version | |
411 | ![]() |
VSNMR_V | Sales document version number | |
412 | ![]() |
VTWEG | Distribution Channel | |
413 | ![]() |
WAPOS | Maintenance item | |
414 | ![]() |
WARPL | Maintenance Plan | |
415 | ![]() |
WEGXX | Path (for Multi-Level BOM Explosions) | |
416 | ![]() |
WEGXX | Path (for Multi-Level BOM Explosions) | |
417 | ![]() |
WERGW | Plant associated with main work center | |
418 | ![]() |
WERKS_D | Plant | |
419 | ![]() |
WFCID | Factory Calendar | |
420 | ![]() |
XFELD | Checkbox | |
421 | ![]() |
XFELD | Checkbox | |
422 | ![]() |
XFELD | Checkbox |