Data Element list used by SAP ABAP Table COCOLORD_INF (Structure for Order data in Collective Order Overview)
SAP ABAP Table COCOLORD_INF (Structure for Order data in Collective Order Overview) is using
# | Object Type | Object Name | Object Description | Note |
---|---|---|---|---|
1 | Data Element | /CUM/AUEST | CU: Automatic Copy of Estimated Costs | |
2 | Data Element | /CUM/CMNUM | CU: Construction Measure Number | |
3 | Data Element | /CUM/DESGUID | CU: GUID of Design Document | |
4 | Data Element | /CUM/DESNUM | CU: Design Number | |
5 | Data Element | /CUM/INDCU | CU: Order is Used for Compatible Units | |
6 | Data Element | /CUM/INTCUNR | CU: Internal CU Number in a Work Order | |
7 | Data Element | /ISDFPS/MEQUI | Master Equipment | |
8 | Data Element | ABCKZ | ABC Indicator for Technical Object | |
9 | Data Element | ABGR_SCHL | Results Analysis Key | |
10 | Data Element | ABNUM | Maintenance Plan Call Number | |
11 | Data Element | ADDAT | PM Order: Reference Date | |
12 | Data Element | ADDCOMPARE_CORE | Reference Element PM/PS | |
13 | Data Element | ADUHR | Time of Reference Date | |
14 | Data Element | AD_ADDRNUM | Address number | |
15 | Data Element | AEKNZ | Change indicator | |
16 | Data Element | AEKNZ | Change indicator | |
17 | Data Element | AEKNZ | Change indicator | |
18 | Data Element | AEKNZ | Change indicator | |
19 | Data Element | AEKNZ | Change indicator | |
20 | Data Element | AEKNZ | Change indicator | |
21 | Data Element | AEKNZ | Change indicator | |
22 | Data Element | AEKNZ | Change indicator | |
23 | Data Element | AEKNZ | Change indicator | |
24 | Data Element | AEKNZ | Change indicator | |
25 | Data Element | AEKNZ | Change indicator | |
26 | Data Element | AEKNZ | Change indicator | |
27 | Data Element | AENNR | Change Number | |
28 | Data Element | AENNR | Change Number | |
29 | Data Element | AENNR | Change Number | |
30 | Data Element | AFAKT | Execution Factor | |
31 | Data Element | AKKNZ | Order Category Indicator Plant Maintenance | |
32 | Data Element | AM_UMWKZ | Reason for environmental investment | |
33 | Data Element | ANING | Name of Person Reponsible for System | |
34 | Data Element | ANLBD | Date until which the system is available | |
35 | Data Element | ANLBZ | Time until which the system is available | |
36 | Data Element | ANLN1 | Main Asset Number | |
37 | Data Element | ANLN2 | Asset Subnumber | |
38 | Data Element | ANLVD | Date from which the system is available | |
39 | Data Element | ANLVZ | Time from Which System is Available | |
40 | Data Element | ANLZU | Syst.Condition | |
41 | Data Element | AP_KTEXT | Short text for the work center | |
42 | Data Element | ARTPR | Priority Type | |
43 | Data Element | ATRKZ | Request ID | |
44 | Data Element | AUDISP_PLUS | Reservation Relevance/Generation of Purchase Requisition | |
45 | Data Element | AUFABKRS | Processing group | |
46 | Data Element | AUFAEDAT | Change date for Order Master | |
47 | Data Element | AUFAENAM | Last changed by | |
48 | Data Element | AUFART | Order Type | |
49 | Data Element | AUFERFDAT | Created on | |
50 | Data Element | AUFERFNAM | Entered by | |
51 | Data Element | AUFIDAT2 | Technical completion date | |
52 | Data Element | AUFKALSM | Costing Sheet | |
53 | Data Element | AUFKOSTV | Responsible cost center | |
54 | Data Element | AUFKSTAR | Settlement cost element | |
55 | Data Element | AUFLOEKZ | Deletion flag | |
56 | Data Element | AUFLTEXT | Long Text Exists | |
57 | Data Element | AUFNR | Order Number | |
58 | Data Element | AUFNR | Order Number | |
59 | Data Element | AUFNR | Order Number | |
60 | Data Element | AUFNR | Order Number | |
61 | Data Element | AUFREFNR | Reference order number | |
62 | Data Element | AUFSOWRK | Location plant | |
63 | Data Element | AUFSTKZ | Identifier for statistical order | |
64 | Data Element | AUFTEXT | Description | |
65 | Data Element | AUFTYP | Order category | |
66 | Data Element | AUFUSER4 | Estimated total costs of order | |
67 | Data Element | AUFWAERS | Order Currency | |
68 | Data Element | AUFZSCHL | Overhead key | |
69 | Data Element | AUF_PLKNZ | Maintenance order planning indicator | |
70 | Data Element | AUKBED | Indicator: Calculate capacity requirements | |
71 | Data Element | AVOUEB | Indicator: Display operation overview | |
72 | Data Element | AWSLS | Variance Key | |
73 | Data Element | BASMN | Base quantity | |
74 | Data Element | BASMN | Base quantity | |
75 | Data Element | BASMN | Base quantity | |
76 | Data Element | BAUTL | Assembly | |
77 | Data Element | BEBER | Organizational Area | |
78 | Data Element | BEDID | ID of the capacity requirements record | |
79 | Data Element | BEDID | ID of the capacity requirements record | |
80 | Data Element | BEDID | ID of the capacity requirements record | |
81 | Data Element | BEMOT | Accounting Indicator | |
82 | Data Element | BREAKS | Indicator: Scheduling allowing for breaks | |
83 | Data Element | BUKRS | Company Code | |
84 | Data Element | BUKRS | Company Code | |
85 | Data Element | CADNR | Addresses: Address Number | |
86 | Data Element | CCKEY | Cost collector key | |
87 | Data Element | CCOBJID | Object ID | |
88 | Data Element | CC_CONF_KEY | Identical object | |
89 | Data Element | CFB_ADTDAYS | Additional Days | |
90 | Data Element | CFB_BBD_PPPI | Best-Before Date (BBD)/ Shelf Life Expiration Date (SLED) | |
91 | Data Element | CFB_DATOFM | Date of Manufacture | |
92 | Data Element | CHARG_D | Batch Number | |
93 | Data Element | CIM_COUNT | Internal counter | |
94 | Data Element | CIM_COUNT | Internal counter | |
95 | Data Element | CIM_COUNT | Internal counter | |
96 | Data Element | CKML_F_PROCNR | Production Process | |
97 | Data Element | CKML_PROZESS_TYP | Process Category (Procurement/Consumption) | |
98 | Data Element | CK_LOSGR | Costing lot size | |
99 | Data Element | CN_AUTH | Ind.: Authorization exists | |
100 | Data Element | CN_AUTH | Ind.: Authorization exists | |
101 | Data Element | CN_AUTH | Ind.: Authorization exists | |
102 | Data Element | CN_AUTH | Ind.: Authorization exists | |
103 | Data Element | CN_AUTH | Ind.: Authorization exists | |
104 | Data Element | CN_AUTH | Ind.: Authorization exists | |
105 | Data Element | CN_AUTH | Ind.: Authorization exists | |
106 | Data Element | CN_COSTUPD | Costs are updated | |
107 | Data Element | COMP_CALC | Indicator: Components will not be costed | |
108 | Data Element | CO_ABARB | Confirmation: Degree of processing | |
109 | Data Element | CO_APLZL | General counter for order | |
110 | Data Element | CO_APRIO | Order priority | |
111 | Data Element | CO_APROZ | Scrap percentage | |
112 | Data Element | CO_APROZ | Scrap percentage | |
113 | Data Element | CO_ASTEX | User status active | |
114 | Data Element | CO_ASTTX | Field displaying user status | |
115 | Data Element | CO_AUCOST | Indicator: Cost automatically | |
116 | Data Element | CO_AUFLD | Date of BOM Explosion/Routing Transfer | |
117 | Data Element | CO_AUFPL | Routing number of operations in the order | |
118 | Data Element | CO_AUFPL | Routing number of operations in the order | |
119 | Data Element | CO_AUFPL | Routing number of operations in the order | |
120 | Data Element | CO_AUTERM | Indicator: Schedule automatically | |
121 | Data Element | CO_CHG_TIME | Changed at | |
122 | Data Element | CO_COLORDPRC | Collective order with/without automatic goods movement | |
123 | Data Element | CO_DISPO | MRP controller for the order | |
124 | Data Element | CO_FLGMD | FAUF: Reading of master data executed | |
125 | Data Element | CO_FREIKZ | Indicator: Release order immediately | |
126 | Data Element | CO_FTRMI | Actual release date | |
127 | Data Element | CO_FTRMP | Planned release date | |
128 | Data Element | CO_FTRMS | Scheduled release date | |
129 | Data Element | CO_FTRPS | Scheduled release date (forecast) | |
130 | Data Element | CO_GETRI | Confirmed Order Finish Date | |
131 | Data Element | CO_GEUZI | Confirmed order finish (time) | |
132 | Data Element | CO_GIAMG | Expected variance from planned qty to be delivered to stock | |
133 | Data Element | CO_GLTPP | Finish date (forecast) | |
134 | Data Element | CO_GLTPS | Scheduled forecast finish | |
135 | Data Element | CO_GLTRI | Actual finish date | |
136 | Data Element | CO_GLTRP | Basic finish date | |
137 | Data Element | CO_GLTRS | Scheduled finish | |
138 | Data Element | CO_GLUPP | Forecast finish (time) | |
139 | Data Element | CO_GLUPS | Scheduled forecast finish time | |
140 | Data Element | CO_GLUZP | Basic finish (time) | |
141 | Data Element | CO_GLUZS | Scheduled finish time | |
142 | Data Element | CO_GMEIN | Common unit of measure for all order items | |
143 | Data Element | CO_GSTPP | Forecast start date | |
144 | Data Element | CO_GSTPS | Scheduled forecast start | |
145 | Data Element | CO_GSTRI | Actual start date | |
146 | Data Element | CO_GSTRP | Basic start date | |
147 | Data Element | CO_GSTRS | Scheduled start | |
148 | Data Element | CO_GSUPP | Forecast start (time) | |
149 | Data Element | CO_GSUPS | Scheduled start time (Forecast) | |
150 | Data Element | CO_GSUZI | Actual start time | |
151 | Data Element | CO_GSUZP | Basic start time | |
152 | Data Element | CO_GSUZS | Scheduled Start (Time) | |
153 | Data Element | CO_GWEMG | Delivered quantity | |
154 | Data Element | CO_IASMG | Scrap confirmed for order | |
155 | Data Element | CO_IGMNG | Yield confirmed from order confirmation | |
156 | Data Element | CO_KDAUF | Sales order number | |
157 | Data Element | CO_KDPOS | Sales order item | |
158 | Data Element | CO_KONSI | Selection: Consignment stock | |
159 | Data Element | CO_KONTI | Account assignment | |
160 | Data Element | CO_KORRK | Order conversion with the possibility of making corrections | |
161 | Data Element | CO_KSTEMPF | Indicator: Direct cost collector | |
162 | Data Element | CO_LAUFNR | Leading order in current processing | |
163 | Data Element | CO_LEIHG | Selection: Returnable packaging | |
164 | Data Element | CO_LKNOT | Left node in collective order | |
165 | Data Element | CO_LTEXT | Long text exists | |
166 | Data Element | CO_MATNR | Material Number for Order | |
167 | Data Element | CO_MATXT | Material description | |
168 | Data Element | CO_MBAUGR | Superior assembly | |
169 | Data Element | CO_MES_INT_ROUTINGID | Key of a Routing from an ME System | |
170 | Data Element | CO_MES_MAX_GAMNG | Maximum Value of Total Order Quantity After Distribution | |
171 | Data Element | CO_MIMEZ | Expected yield variance | |
172 | Data Element | CO_MLTPS | Order with multiple items | |
173 | Data Element | CO_NAUCOST | Indicator: Do not cost automatically | |
174 | Data Element | CO_NAUTERM | Indicator: Do not schedule automatically | |
175 | Data Element | CO_NOPCOST | Do not calculate planned costs for order | |
176 | Data Element | CO_PENDD | Outline finish of collective order (date) | |
177 | Data Element | CO_PENDT | Outline finish time | |
178 | Data Element | CO_PLAFKZ | Indicator: Convert planned order with RSNUM | |
179 | Data Element | CO_PLAUF | Date for routing transfer | |
180 | Data Element | CO_POSNR | Order item number | |
181 | Data Element | CO_POSNR | Order item number | |
182 | Data Element | CO_PRMBD | Check with requirements | |
183 | Data Element | CO_PRODNET | Indicator: Order is part of collective order | |
184 | Data Element | CO_PRODPRF | Production Scheduling Profile | |
185 | Data Element | CO_PSTARTD | Outline start of collective network (date) | |
186 | Data Element | CO_PSTARTT | Start time of a collective order | |
187 | Data Element | CO_PWERK | Planning plant for the order | |
188 | Data Element | CO_RKNOT | Right node of a collective order | |
189 | Data Element | CO_RUECK | Completion confirmation number for the operation | |
190 | Data Element | CO_SDATB | To selection date | |
191 | Data Element | CO_SDATV | From selection date | |
192 | Data Element | CO_STTXT | System Status | |
193 | Data Element | CO_TEILNET | Number of superior network | |
194 | Data Element | CO_TM_FREI | Indicator: Order is (partially) released | |
195 | Data Element | CO_TM_TABG | Indicator: Order is technically completed | |
196 | Data Element | CO_UMSKZ | Indicator: Collective conversion of planned orders | |
197 | Data Element | CO_UPTER | Indicator: Change to Scheduled Dates | |
198 | Data Element | CREA_APL | Application code, where the order/network was created | |
199 | Data Element | CR_OBJID | Object ID of the resource | |
200 | Data Element | CR_OBJID | Object ID of the resource | |
201 | Data Element | CR_OBJTY | Object types of the CIM resource | |
202 | Data Element | CR_OBJTY | Object types of the CIM resource | |
203 | Data Element | CR_OBJTY | Object types of the CIM resource | |
204 | Data Element | CSPLIT | Apportionment structure | |
205 | Data Element | CUOBJ | Configuration (internal object number) | |
206 | Data Element | CY_SEQNR | Seq. number order | |
207 | Data Element | C_TIME | Time created | |
208 | Data Element | DATAN | Date of Technical Inspection | |
209 | Data Element | DATUV | Valid-From Date | |
210 | Data Element | DATUV | Valid-From Date | |
211 | Data Element | DAUFN | Standing order number | |
212 | Data Element | DEVICEID | Additional Device Data | |
213 | Data Element | DZKRIZ | Counter for additional criteria | |
214 | Data Element | EQFNR | Sort Field | |
215 | Data Element | EQUNR | Equipment Number | |
216 | Data Element | FEVOR | Production Supervisor | |
217 | Data Element | FHORI | Scheduling Margin Key for Floats | |
218 | Data Element | FKBER | Functional Area | |
219 | Data Element | FLAG | General Flag | |
220 | Data Element | FLAG | General Flag | |
221 | Data Element | FLGSER | Serial Number with Incomplete Equipment | |
222 | Data Element | FLG_ADDR | Ind: Address update must be called up | |
223 | Data Element | FLG_AOB | Indicator: relationships | |
224 | Data Element | FLG_ARBEI | Indicator: Default value work is relevant | |
225 | Data Element | FLG_CALC | Indicator: Order (network etc.) still to be calculated | |
226 | Data Element | FLG_DIRECT | Indicator: Direct function call | |
227 | Data Element | FLG_LFINF | Ind.: Book delivery information | |
228 | Data Element | FLG_LVS | Indicator: WM relevant change made | |
229 | Data Element | FLG_PARENT | Indicator: Order has dependent orders | |
230 | Data Element | FLG_PRINT | Indicator: Order still to be printed (internal field) | |
231 | Data Element | FLG_RUCK | Ind: Confirmation to be saved | |
232 | Data Element | FLG_SERV | Ind: Services must be updated | |
233 | Data Element | FLG_TERDIA | Indicator: Refill dialog table for scheduling | |
234 | Data Element | FLG_TERM | Indicator: Scheduling must take data changes into account | |
235 | Data Element | FLG_TRME | Indicator: Scheduling is carried out at least once | |
236 | Data Element | FLG_TRMV | Indicator: Operation changes relevant to scheduling | |
237 | Data Element | FREIZ | Release period (in days) | |
238 | Data Element | GAMNG | Total order quantity | |
239 | Data Element | GASMG | Total scrap quantity in the order | |
240 | Data Element | GAUZT | Planned downtime in hours | |
241 | Data Element | GERNR | Serial Number | |
242 | Data Element | GEWRK | Main work center for maintenance tasks | |
243 | Data Element | GSBER | Business Area | |
244 | Data Element | GSBER | Business Area | |
245 | Data Element | HISDA | PM request: History date | |
246 | Data Element | HISTU | Level (in Multi-Level BOM Explosions) | |
247 | Data Element | ILA | Maintenance activity type | |
248 | Data Element | ILOAI | ILOA Individual | |
249 | Data Element | ILOAN | Location and account assignment for technical object | |
250 | Data Element | ILOM_OWNER | Object reference indicator | |
251 | Data Element | IM_ABUKRS | Requesting company code | |
252 | Data Element | IM_PROFIL | Investment measure profile | |
253 | Data Element | IM_SIZECL | Scale of investment objects | |
254 | Data Element | INGRP | Planner Group for Customer Service and Plant Maintenance | |
255 | Data Element | INNAM | Name of the Maintenance Planner Group | |
256 | Data Element | INSPK | Name of Person Responsible for Technical Inspection | |
257 | Data Element | IWERK | Maintenance Planning Plant | |
258 | Data Element | IWERK | Maintenance Planning Plant | |
259 | Data Element | IZWEK | Reason for investment | |
260 | Data Element | JV_ETYPE | Equity type | |
261 | Data Element | JV_JIBCL | JIB/JIBE Class | |
262 | Data Element | JV_JIBSA | JIB/JIBE Subclass A | |
263 | Data Element | JV_NAME | Joint venture | |
264 | Data Element | JV_OR_CO | JV original cost object | |
265 | Data Element | JV_OTYPE | Joint Venture Object Type | |
266 | Data Element | JV_RECIND | Recovery Indicator | |
267 | Data Element | J_OBJNR | Object number | |
268 | Data Element | J_OBJNR | Object number | |
269 | Data Element | J_STSMA | Status Profile | |
270 | Data Element | KALKVARIST | Costing variant for actual costs | |
271 | Data Element | KALKVARPLN | Costing variant for planned costs | |
272 | Data Element | KALSMA_CH | Search procedure for batch determination | |
273 | Data Element | KALSN | Calendar Selection for Order | |
274 | Data Element | KAPPL | Application | |
275 | Data Element | KAPVERSA | Version of Available Capacity | |
276 | Data Element | KBED_D | Ind: do not create capacity requirements | |
277 | Data Element | KDAUF | Sales Order Number | |
278 | Data Element | KDPOS | Item number in Sales Order | |
279 | Data Element | KOKRS | Controlling Area | |
280 | Data Element | KOKRS | Controlling Area | |
281 | Data Element | KOSTL | Cost Center | |
282 | Data Element | KUNUM | Customer Number | |
283 | Data Element | KVEWE | Usage of the Condition Table | |
284 | Data Element | KZAVC | Indicator for type of availability check | |
285 | Data Element | K_SALDO | Order balance in controlling-area currency | |
286 | Data Element | LAUFN | Order number | |
287 | Data Element | LD_LINE | Line hierarchy | |
288 | Data Element | LGWID | Object ID of the Work Center | |
289 | Data Element | LOSBS | To Lot Size | |
290 | Data Element | LOSDIV | Lot size divisor | |
291 | Data Element | LOSGRBIS | To lot size | |
292 | Data Element | LOSGRVON | From Lot Size | |
293 | Data Element | LOSVN | From Lot Size | |
294 | Data Element | LZEIH | Unit for maximum storage period | |
295 | Data Element | MANDT | Client | |
296 | Data Element | MATNR | Material Number | |
297 | Data Element | MATNR | Material Number | |
298 | Data Element | MATNR | Material Number | |
299 | Data Element | MATSV | Service product | |
300 | Data Element | MAUEH | Unit for Breakdown Duration | |
301 | Data Element | MAUFNR | Number of superior order | |
302 | Data Element | MAXLZ | Maximum storage period | |
303 | Data Element | MEINS | Base Unit of Measure | |
304 | Data Element | MEINS | Base Unit of Measure | |
305 | Data Element | MEINS | Base Unit of Measure | |
306 | Data Element | MNGSP | Service product quantity | |
307 | Data Element | NEND_IST | Actual finish for collective order (date) | |
308 | Data Element | NEND_TRM | Scheduled finish date of collective order (date) | |
309 | Data Element | NENT_IST | Actual finish collective order (time) | |
310 | Data Element | NENT_TRM | Scheduled finish collective order (time) | |
311 | Data Element | NETZKONT | Indicator for the account assignment of a network(hdr/act.) | |
312 | Data Element | NO_DISP_PLUS | Effective for Materials Planning | |
313 | Data Element | NPLDA | Next planned date | |
314 | Data Element | NSTART_IST | Actual start collective order (date) | |
315 | Data Element | NSTART_TRM | Scheduled start date of collective order (date) | |
316 | Data Element | NSTT_IST | Actual start collective order (time) | |
317 | Data Element | NSTT_TRM | Scheduled start collective order (time) | |
318 | Data Element | NWART | Type of network | |
319 | Data Element | OBJEKTID | Object ID | |
320 | Data Element | OBJKNR | Object list number | |
321 | Data Element | OCM_CH_PROC | Process that has lead to the change of an object | |
322 | Data Element | OCM_COMP_RES | OCM: Result of comparison of two order objects | |
323 | Data Element | OCM_OBJ_TYPE | Change indicator | |
324 | Data Element | O_SALDO | Order balance in order currency | |
325 | Data Element | PKNUM | Control cycle number | |
326 | Data Element | PKOSA_D | Cost collector for production process PROCNR | |
327 | Data Element | PKPOS | Kanban item number / control cycle item | |
328 | Data Element | PLART_TX | Description of the basis for scheduling | |
329 | Data Element | PLGKZ | Identifier for planning with line items | |
330 | Data Element | PLNAL | Group Counter | |
331 | Data Element | PLNAW | Application of the task list | |
332 | Data Element | PLNME | Task list unit of measure | |
333 | Data Element | PLNNR | Key for Task List Group | |
334 | Data Element | PLNNR_REF | Number of standard networks to be copied | |
335 | Data Element | PLNTY | Task List Type | |
336 | Data Element | PLN_VERWE | Task list usage | |
337 | Data Element | PLVAR | Plan Version | |
338 | Data Element | PM_ABR_FLG | Flag: Maintenance plan call | |
339 | Data Element | PM_OBJTY | Object Type of CIM Resources for Work Center | |
340 | Data Element | PM_PHASE | Maintenance Processing Phase | |
341 | Data Element | PM_PRT_FLG | Indicator: Order Printing Requested | |
342 | Data Element | PM_WO_FLG | Indicator: Order Creation from PM Notification | |
343 | Data Element | POSNR | Item number of the SD document | |
344 | Data Element | POSNR | Item number of the SD document | |
345 | Data Element | PPSID | Object ID of PP work center | |
346 | Data Element | PRCTR | Profit Center | |
347 | Data Element | PRIOK | Priority | |
348 | Data Element | PROFIDNZPL | Network profile | |
349 | Data Element | PRREG | Checking rule for the availability check | |
350 | Data Element | PRTRV | Indicator: Project date definition | |
351 | Data Element | PS_AKSTL | Requesting cost center | |
352 | Data Element | PS_KZERB | Indicator: Project summarization | |
353 | Data Element | PS_PLART | Basis for scheduling | |
354 | Data Element | PS_PSP_PNR | Work Breakdown Structure Element (WBS Element) | |
355 | Data Element | PS_PSP_PNR | Work Breakdown Structure Element (WBS Element) | |
356 | Data Element | PS_PSP_PNR | Work Breakdown Structure Element (WBS Element) | |
357 | Data Element | PS_PSP_PRO | Project definition | |
358 | Data Element | PS_SPS_ELE | Standard WBS element | |
359 | Data Element | PS_TERMBAS | Set of dates for network | |
360 | Data Element | QMNUM | Message Number | |
361 | Data Element | QPLOS | Inspection Lot Number | |
362 | Data Element | RAUMNR | Room | |
363 | Data Element | REDKZ | Reduction indicator for scheduling | |
364 | Data Element | REDKZP | Reduction indicator for scheduling (forecast) | |
365 | Data Element | REDKZ_TX | Description of reduction indicator | |
366 | Data Element | REVLV | Revision level | |
367 | Data Element | REVNI | Revision of Plant Maintenance and Customer Service | |
368 | Data Element | RGEKZ | Indicator: Backflush | |
369 | Data Element | RMNGA | Total confirmed rework quantity | |
370 | Data Element | RSNUM | Number of reservation/dependent requirements | |
371 | Data Element | RSNUM | Number of reservation/dependent requirements | |
372 | Data Element | RSORD | Refurbishment order indicator (PM) | |
373 | Data Element | RSUPG | Upgrade Order Indicator | |
374 | Data Element | SCOPE_CV | Object Class | |
375 | Data Element | SCRTP | Scenario or Subscreen Category | |
376 | Data Element | SICHZ | Float after production (in days) | |
377 | Data Element | SICHZ_TRM | Scheduled float after production in days | |
378 | Data Element | SPART | Division | |
379 | Data Element | SPLIT_STAT | Status of an order in a split hierarchy | |
380 | Data Element | STALT | Alternative BOM | |
381 | Data Element | STLAN | BOM Usage | |
382 | Data Element | STLST | BOM Statuses | |
383 | Data Element | STLTY | BOM Category | |
384 | Data Element | STNUM | Bill of Material | |
385 | Data Element | STORT | Asset location | |
386 | Data Element | SWERK | Maintenance Plant | |
387 | Data Element | SYSUUID_X | UUID in X form (binary) | |
388 | Data Element | TABIX_D | Field defined as in SY-TABIX | |
389 | Data Element | TERHW | Scheduling note from order scheduling | |
390 | Data Element | TERMKZ | Scheduling type | |
391 | Data Element | TERMKZP | Scheduling type (forecast) | |
392 | Data Element | TERMKZ_TXT | Description of scheduling type | |
393 | Data Element | TERMKZ_TXT | Description of scheduling type | |
394 | Data Element | TEXT40 | Text, 40 Characters Long | |
395 | Data Element | TIMESTAMPL | UTC Time Stamp in Long Form (YYYYMMDDhhmmssmmmuuun) | |
396 | Data Element | TMBAS_TX | Description of the planning type | |
397 | Data Element | TPLNR | Functional Location | |
398 | Data Element | TRMDT | Date of the last scheduling | |
399 | Data Element | TXCHG | Indicator: long text changed | |
400 | Data Element | TXJCD | Tax Jurisdiction | |
401 | Data Element | TYPKZ | Type of object causing the load (order category) | |
402 | Data Element | UII_CHAR72 | Unique Item Identifier | |
403 | Data Element | VAGRP | Responsible planner group/department | |
404 | Data Element | VAGRP | Responsible planner group/department | |
405 | Data Element | VANTW | Person/Group responsible for the network | |
406 | Data Element | VBELN | Sales and Distribution Document Number | |
407 | Data Element | VKORG | Sales Organization | |
408 | Data Element | VORAB_SM | Advance Shipment Indicator | |
409 | Data Element | VORGZ | Float before production (in days) | |
410 | Data Element | VORGZ_TRM | Scheduled float before production in days | |
411 | Data Element | VSINACT | Version inactive indicator | |
412 | Data Element | VSNMR | Number or description of a version | |
413 | Data Element | VSNMR_V | Sales document version number | |
414 | Data Element | VTWEG | Distribution Channel | |
415 | Data Element | WAPOS | Maintenance item | |
416 | Data Element | WARPL | Maintenance Plan | |
417 | Data Element | WEGXX | Path (for Multi-Level BOM Explosions) | |
418 | Data Element | WEGXX | Path (for Multi-Level BOM Explosions) | |
419 | Data Element | WERGW | Plant associated with main work center | |
420 | Data Element | WERKS_D | Plant | |
421 | Data Element | WFCID | Factory Calendar | |
422 | Data Element | XFELD | Checkbox | |
423 | Data Element | XFELD | Checkbox | |
424 | Data Element | XFELD | Checkbox |