Data Element list used by SAP ABAP Table CAUFVDB (Document table structure of the order header)
SAP ABAP Table CAUFVDB (Document table structure of the order header) is using
# Object Type Object Name Object Description Note
     
1 Data Element  /CUM/AUEST CU: Automatic Copy of Estimated Costs
2 Data Element  /CUM/CMNUM CU: Construction Measure Number
3 Data Element  /CUM/DESGUID CU: GUID of Design Document
4 Data Element  /CUM/DESNUM CU: Design Number
5 Data Element  /CUM/INDCU CU: Order is Used for Compatible Units
6 Data Element  /CUM/INTCUNR CU: Internal CU Number in a Work Order
7 Data Element  /ISDFPS/MEQUI Master Equipment
8 Data Element  ABCKZ ABC Indicator for Technical Object
9 Data Element  ABGR_SCHL Results Analysis Key
10 Data Element  ABNUM Maintenance Plan Call Number
11 Data Element  ADDAT PM Order: Reference Date
12 Data Element  ADDCOMPARE_CORE Reference Element PM/PS
13 Data Element  ADUHR Time of Reference Date
14 Data Element  AD_ADDRNUM Address number
15 Data Element  AEKNZ Change indicator
16 Data Element  AEKNZ Change indicator
17 Data Element  AEKNZ Change indicator
18 Data Element  AEKNZ Change indicator
19 Data Element  AEKNZ Change indicator
20 Data Element  AEKNZ Change indicator
21 Data Element  AEKNZ Change indicator
22 Data Element  AEKNZ Change indicator
23 Data Element  AEKNZ Change indicator
24 Data Element  AEKNZ Change indicator
25 Data Element  AEKNZ Change indicator
26 Data Element  AEKNZ Change indicator
27 Data Element  AENNR Change Number
28 Data Element  AENNR Change Number
29 Data Element  AENNR Change Number
30 Data Element  AFAKT Execution Factor
31 Data Element  AKKNZ Order Category Indicator Plant Maintenance
32 Data Element  AM_UMWKZ Reason for environmental investment
33 Data Element  ANING Name of Person Reponsible for System
34 Data Element  ANLBD Date until which the system is available
35 Data Element  ANLBZ Time until which the system is available
36 Data Element  ANLN1 Main Asset Number
37 Data Element  ANLN2 Asset Subnumber
38 Data Element  ANLVD Date from which the system is available
39 Data Element  ANLVZ Time from Which System is Available
40 Data Element  ANLZU Syst.Condition
41 Data Element  AP_KTEXT Short text for the work center
42 Data Element  ARTPR Priority Type
43 Data Element  ATRKZ Request ID
44 Data Element  AUDISP_PLUS Reservation Relevance/Generation of Purchase Requisition
45 Data Element  AUFABKRS Processing group
46 Data Element  AUFAEDAT Change date for Order Master
47 Data Element  AUFAENAM Last changed by
48 Data Element  AUFART Order Type
49 Data Element  AUFERFDAT Created on
50 Data Element  AUFERFNAM Entered by
51 Data Element  AUFIDAT2 Technical completion date
52 Data Element  AUFKALSM Costing Sheet
53 Data Element  AUFKOSTV Responsible cost center
54 Data Element  AUFKSTAR Settlement cost element
55 Data Element  AUFLOEKZ Deletion flag
56 Data Element  AUFLTEXT Long Text Exists
57 Data Element  AUFNR Order Number
58 Data Element  AUFNR Order Number
59 Data Element  AUFNR Order Number
60 Data Element  AUFNR Order Number
61 Data Element  AUFREFNR Reference order number
62 Data Element  AUFSOWRK Location plant
63 Data Element  AUFSTKZ Identifier for statistical order
64 Data Element  AUFTEXT Description
65 Data Element  AUFTYP Order category
66 Data Element  AUFUSER4 Estimated total costs of order
67 Data Element  AUFWAERS Order Currency
68 Data Element  AUFZSCHL Overhead key
69 Data Element  AUF_PLKNZ Maintenance order planning indicator
70 Data Element  AUKBED Indicator: Calculate capacity requirements
71 Data Element  AVOUEB Indicator: Display operation overview
72 Data Element  AWSLS Variance Key
73 Data Element  BASMN Base quantity
74 Data Element  BASMN Base quantity
75 Data Element  BASMN Base quantity
76 Data Element  BAUTL Assembly
77 Data Element  BEBER Organizational Area
78 Data Element  BEDID ID of the capacity requirements record
79 Data Element  BEDID ID of the capacity requirements record
80 Data Element  BEDID ID of the capacity requirements record
81 Data Element  BEMOT Accounting Indicator
82 Data Element  BREAKS Indicator: Scheduling allowing for breaks
83 Data Element  BUKRS Company Code
84 Data Element  BUKRS Company Code
85 Data Element  CADNR Addresses: Address Number
86 Data Element  CCKEY Cost collector key
87 Data Element  CCOBJID Object ID
88 Data Element  CC_CONF_KEY Identical object
89 Data Element  CFB_ADTDAYS Additional Days
90 Data Element  CFB_BBD_PPPI Best-Before Date (BBD)/ Shelf Life Expiration Date (SLED)
91 Data Element  CFB_DATOFM Date of Manufacture
92 Data Element  CIM_COUNT Internal counter
93 Data Element  CIM_COUNT Internal counter
94 Data Element  CIM_COUNT Internal counter
95 Data Element  CKML_F_PROCNR Production Process
96 Data Element  CKML_PROZESS_TYP Process Category (Procurement/Consumption)
97 Data Element  CK_LOSGR Costing lot size
98 Data Element  CN_AUTH Ind.: Authorization exists
99 Data Element  CN_AUTH Ind.: Authorization exists
100 Data Element  CN_AUTH Ind.: Authorization exists
101 Data Element  CN_AUTH Ind.: Authorization exists
102 Data Element  CN_AUTH Ind.: Authorization exists
103 Data Element  CN_AUTH Ind.: Authorization exists
104 Data Element  CN_AUTH Ind.: Authorization exists
105 Data Element  CN_COSTUPD Costs are updated
106 Data Element  COMP_CALC Indicator: Components will not be costed
107 Data Element  CO_ABARB Confirmation: Degree of processing
108 Data Element  CO_APLZL General counter for order
109 Data Element  CO_APRIO Order priority
110 Data Element  CO_APROZ Scrap percentage
111 Data Element  CO_APROZ Scrap percentage
112 Data Element  CO_ASTEX User status active
113 Data Element  CO_ASTTX Field displaying user status
114 Data Element  CO_AUCOST Indicator: Cost automatically
115 Data Element  CO_AUFLD Date of BOM Explosion/Routing Transfer
116 Data Element  CO_AUFPL Routing number of operations in the order
117 Data Element  CO_AUFPL Routing number of operations in the order
118 Data Element  CO_AUFPL Routing number of operations in the order
119 Data Element  CO_AUTERM Indicator: Schedule automatically
120 Data Element  CO_CHG_TIME Changed at
121 Data Element  CO_COLORDPRC Collective order with/without automatic goods movement
122 Data Element  CO_DISPO MRP controller for the order
123 Data Element  CO_FLGMD FAUF: Reading of master data executed
124 Data Element  CO_FREIKZ Indicator: Release order immediately
125 Data Element  CO_FTRMI Actual release date
126 Data Element  CO_FTRMP Planned release date
127 Data Element  CO_FTRMS Scheduled release date
128 Data Element  CO_FTRPS Scheduled release date (forecast)
129 Data Element  CO_GETRI Confirmed Order Finish Date
130 Data Element  CO_GEUZI Confirmed order finish (time)
131 Data Element  CO_GIAMG Expected variance from planned qty to be delivered to stock
132 Data Element  CO_GLTPP Finish date (forecast)
133 Data Element  CO_GLTPS Scheduled forecast finish
134 Data Element  CO_GLTRI Actual finish date
135 Data Element  CO_GLTRP Basic finish date
136 Data Element  CO_GLTRS Scheduled finish
137 Data Element  CO_GLUPP Forecast finish (time)
138 Data Element  CO_GLUPS Scheduled forecast finish time
139 Data Element  CO_GLUZP Basic finish (time)
140 Data Element  CO_GLUZS Scheduled finish time
141 Data Element  CO_GMEIN Common unit of measure for all order items
142 Data Element  CO_GSTPP Forecast start date
143 Data Element  CO_GSTPS Scheduled forecast start
144 Data Element  CO_GSTRI Actual start date
145 Data Element  CO_GSTRP Basic start date
146 Data Element  CO_GSTRS Scheduled start
147 Data Element  CO_GSUPP Forecast start (time)
148 Data Element  CO_GSUPS Scheduled start time (Forecast)
149 Data Element  CO_GSUZI Actual start time
150 Data Element  CO_GSUZP Basic start time
151 Data Element  CO_GSUZS Scheduled Start (Time)
152 Data Element  CO_GWEMG Delivered quantity
153 Data Element  CO_IASMG Scrap confirmed for order
154 Data Element  CO_IGMNG Yield confirmed from order confirmation
155 Data Element  CO_KDAUF Sales order number
156 Data Element  CO_KDPOS Sales order item
157 Data Element  CO_KONSI Selection: Consignment stock
158 Data Element  CO_KONTI Account assignment
159 Data Element  CO_KORRK Order conversion with the possibility of making corrections
160 Data Element  CO_KSTEMPF Indicator: Direct cost collector
161 Data Element  CO_LAUFNR Leading order in current processing
162 Data Element  CO_LEIHG Selection: Returnable packaging
163 Data Element  CO_LKNOT Left node in collective order
164 Data Element  CO_LTEXT Long text exists
165 Data Element  CO_MATNR Material Number for Order
166 Data Element  CO_MATXT Material description
167 Data Element  CO_MBAUGR Superior assembly
168 Data Element  CO_MES_INT_ROUTINGID Key of a Routing from an ME System
169 Data Element  CO_MES_MAX_GAMNG Maximum Value of Total Order Quantity After Distribution
170 Data Element  CO_MIMEZ Expected yield variance
171 Data Element  CO_MLTPS Order with multiple items
172 Data Element  CO_NAUCOST Indicator: Do not cost automatically
173 Data Element  CO_NAUTERM Indicator: Do not schedule automatically
174 Data Element  CO_NOPCOST Do not calculate planned costs for order
175 Data Element  CO_PENDD Outline finish of collective order (date)
176 Data Element  CO_PENDT Outline finish time
177 Data Element  CO_PLAFKZ Indicator: Convert planned order with RSNUM
178 Data Element  CO_PLAUF Date for routing transfer
179 Data Element  CO_POSNR Order item number
180 Data Element  CO_POSNR Order item number
181 Data Element  CO_PRMBD Check with requirements
182 Data Element  CO_PRODNET Indicator: Order is part of collective order
183 Data Element  CO_PRODPRF Production Scheduling Profile
184 Data Element  CO_PSTARTD Outline start of collective network (date)
185 Data Element  CO_PSTARTT Start time of a collective order
186 Data Element  CO_RKNOT Right node of a collective order
187 Data Element  CO_RUECK Completion confirmation number for the operation
188 Data Element  CO_SDATB To selection date
189 Data Element  CO_SDATV From selection date
190 Data Element  CO_STTXT System Status
191 Data Element  CO_TEILNET Number of superior network
192 Data Element  CO_TM_FREI Indicator: Order is (partially) released
193 Data Element  CO_TM_TABG Indicator: Order is technically completed
194 Data Element  CO_UMSKZ Indicator: Collective conversion of planned orders
195 Data Element  CO_UPTER Indicator: Change to Scheduled Dates
196 Data Element  CREA_APL Application code, where the order/network was created
197 Data Element  CR_OBJID Object ID of the resource
198 Data Element  CR_OBJID Object ID of the resource
199 Data Element  CR_OBJTY Object types of the CIM resource
200 Data Element  CR_OBJTY Object types of the CIM resource
201 Data Element  CR_OBJTY Object types of the CIM resource
202 Data Element  CSPLIT Apportionment structure
203 Data Element  CUOBJ Configuration (internal object number)
204 Data Element  CY_SEQNR Seq. number order
205 Data Element  C_TIME Time created
206 Data Element  DATAN Date of Technical Inspection
207 Data Element  DATUV Valid-From Date
208 Data Element  DATUV Valid-From Date
209 Data Element  DAUFN Standing order number
210 Data Element  DEVICEID Additional Device Data
211 Data Element  DZKRIZ Counter for additional criteria
212 Data Element  EQFNR Sort Field
213 Data Element  EQUNR Equipment Number
214 Data Element  FEVOR Production Supervisor
215 Data Element  FHORI Scheduling Margin Key for Floats
216 Data Element  FKBER Functional Area
217 Data Element  FLAG General Flag
218 Data Element  FLAG General Flag
219 Data Element  FLGSER Serial Number with Incomplete Equipment
220 Data Element  FLG_ADDR Ind: Address update must be called up
221 Data Element  FLG_AOB Indicator: relationships
222 Data Element  FLG_ARBEI Indicator: Default value work is relevant
223 Data Element  FLG_CALC Indicator: Order (network etc.) still to be calculated
224 Data Element  FLG_DIRECT Indicator: Direct function call
225 Data Element  FLG_ENQ Indicator: Order is locked
226 Data Element  FLG_LFINF Ind.: Book delivery information
227 Data Element  FLG_LVS Indicator: WM relevant change made
228 Data Element  FLG_PARENT Indicator: Order has dependent orders
229 Data Element  FLG_PRINT Indicator: Order still to be printed (internal field)
230 Data Element  FLG_RUCK Ind: Confirmation to be saved
231 Data Element  FLG_SERV Ind: Services must be updated
232 Data Element  FLG_TERDIA Indicator: Refill dialog table for scheduling
233 Data Element  FLG_TERM Indicator: Scheduling must take data changes into account
234 Data Element  FLG_TRME Indicator: Scheduling is carried out at least once
235 Data Element  FLG_TRMV Indicator: Operation changes relevant to scheduling
236 Data Element  FREIZ Release period (in days)
237 Data Element  GAMNG Total order quantity
238 Data Element  GASMG Total scrap quantity in the order
239 Data Element  GAUZT Planned downtime in hours
240 Data Element  GERNR Serial Number
241 Data Element  GEWRK Main work center for maintenance tasks
242 Data Element  GSBER Business Area
243 Data Element  GSBER Business Area
244 Data Element  HISDA PM request: History date
245 Data Element  HISTU Level (in Multi-Level BOM Explosions)
246 Data Element  ILA Maintenance activity type
247 Data Element  ILOAI ILOA Individual
248 Data Element  ILOAN Location and account assignment for technical object
249 Data Element  ILOM_OWNER Object reference indicator
250 Data Element  IM_ABUKRS Requesting company code
251 Data Element  IM_PROFIL Investment measure profile
252 Data Element  IM_SIZECL Scale of investment objects
253 Data Element  INGRP Planner Group for Customer Service and Plant Maintenance
254 Data Element  INNAM Name of the Maintenance Planner Group
255 Data Element  INSPK Name of Person Responsible for Technical Inspection
256 Data Element  IWERK Maintenance Planning Plant
257 Data Element  IWERK Maintenance Planning Plant
258 Data Element  IZWEK Reason for investment
259 Data Element  JV_ETYPE Equity type
260 Data Element  JV_JIBCL JIB/JIBE Class
261 Data Element  JV_JIBSA JIB/JIBE Subclass A
262 Data Element  JV_NAME Joint venture
263 Data Element  JV_OR_CO JV original cost object
264 Data Element  JV_OTYPE Joint Venture Object Type
265 Data Element  JV_RECIND Recovery Indicator
266 Data Element  J_OBJNR Object number
267 Data Element  J_OBJNR Object number
268 Data Element  J_STSMA Status Profile
269 Data Element  KALKVARIST Costing variant for actual costs
270 Data Element  KALKVARPLN Costing variant for planned costs
271 Data Element  KALSMA_CH Search procedure for batch determination
272 Data Element  KALSN Calendar Selection for Order
273 Data Element  KAPPL Application
274 Data Element  KAPVERSA Version of Available Capacity
275 Data Element  KBED_D Ind: do not create capacity requirements
276 Data Element  KDAUF Sales Order Number
277 Data Element  KDPOS Item number in Sales Order
278 Data Element  KOKRS Controlling Area
279 Data Element  KOKRS Controlling Area
280 Data Element  KOSTL Cost Center
281 Data Element  KUNUM Customer Number
282 Data Element  KVEWE Usage of the Condition Table
283 Data Element  KZAVC Indicator for type of availability check
284 Data Element  K_SALDO Order balance in controlling-area currency
285 Data Element  LAUFN Order number
286 Data Element  LD_LINE Line hierarchy
287 Data Element  LGWID Object ID of the Work Center
288 Data Element  LOSBS To Lot Size
289 Data Element  LOSDIV Lot size divisor
290 Data Element  LOSGRBIS To lot size
291 Data Element  LOSGRVON From Lot Size
292 Data Element  LOSVN From Lot Size
293 Data Element  LZEIH Unit for maximum storage period
294 Data Element  MANDT Client
295 Data Element  MATNR Material Number
296 Data Element  MATNR Material Number
297 Data Element  MATNR Material Number
298 Data Element  MAUEH Unit for Breakdown Duration
299 Data Element  MAUFNR Number of superior order
300 Data Element  MAXLZ Maximum storage period
301 Data Element  MEINS Base Unit of Measure
302 Data Element  MEINS Base Unit of Measure
303 Data Element  NEND_IST Actual finish for collective order (date)
304 Data Element  NEND_TRM Scheduled finish date of collective order (date)
305 Data Element  NENT_IST Actual finish collective order (time)
306 Data Element  NENT_TRM Scheduled finish collective order (time)
307 Data Element  NETZKONT Indicator for the account assignment of a network(hdr/act.)
308 Data Element  NO_DISP_PLUS Effective for Materials Planning
309 Data Element  NPLDA Next planned date
310 Data Element  NSTART_IST Actual start collective order (date)
311 Data Element  NSTART_TRM Scheduled start date of collective order (date)
312 Data Element  NSTT_IST Actual start collective order (time)
313 Data Element  NSTT_TRM Scheduled start collective order (time)
314 Data Element  NWART Type of network
315 Data Element  OBJEKTID Object ID
316 Data Element  OBJKNR Object list number
317 Data Element  OCM_CH_PROC Process that has lead to the change of an object
318 Data Element  OCM_COMP_RES OCM: Result of comparison of two order objects
319 Data Element  OCM_OBJ_TYPE Change indicator
320 Data Element  O_SALDO Order balance in order currency
321 Data Element  PKNUM Control cycle number
322 Data Element  PKOSA_D Cost collector for production process PROCNR
323 Data Element  PKPOS Kanban item number / control cycle item
324 Data Element  PLART_TX Description of the basis for scheduling
325 Data Element  PLGKZ Identifier for planning with line items
326 Data Element  PLNAL Group Counter
327 Data Element  PLNAW Application of the task list
328 Data Element  PLNME Task list unit of measure
329 Data Element  PLNNR Key for Task List Group
330 Data Element  PLNNR_REF Number of standard networks to be copied
331 Data Element  PLNTY Task List Type
332 Data Element  PLN_VERWE Task list usage
333 Data Element  PLVAR Plan Version
334 Data Element  PM_ABR_FLG Flag: Maintenance plan call
335 Data Element  PM_OBJTY Object Type of CIM Resources for Work Center
336 Data Element  PM_PHASE Maintenance Processing Phase
337 Data Element  PM_PRT_FLG Indicator: Order Printing Requested
338 Data Element  PM_WO_FLG Indicator: Order Creation from PM Notification
339 Data Element  POSNR Item number of the SD document
340 Data Element  POSNR Item number of the SD document
341 Data Element  PPSID Object ID of PP work center
342 Data Element  PRCTR Profit Center
343 Data Element  PRIOK Priority
344 Data Element  PROFIDNZPL Network profile
345 Data Element  PRREG Checking rule for the availability check
346 Data Element  PRTRV Indicator: Project date definition
347 Data Element  PS_AKSTL Requesting cost center
348 Data Element  PS_KZERB Indicator: Project summarization
349 Data Element  PS_PLART Basis for scheduling
350 Data Element  PS_PSP_PNR Work Breakdown Structure Element (WBS Element)
351 Data Element  PS_PSP_PNR Work Breakdown Structure Element (WBS Element)
352 Data Element  PS_PSP_PNR Work Breakdown Structure Element (WBS Element)
353 Data Element  PS_PSP_PRO Project definition
354 Data Element  PS_SPS_ELE Standard WBS element
355 Data Element  PS_TERMBAS Set of dates for network
356 Data Element  QMNUM Message Number
357 Data Element  QPLOS Inspection Lot Number
358 Data Element  RAUMNR Room
359 Data Element  REDKZ Reduction indicator for scheduling
360 Data Element  REDKZP Reduction indicator for scheduling (forecast)
361 Data Element  REDKZ_TX Description of reduction indicator
362 Data Element  REVLV Revision level
363 Data Element  REVNI Revision of Plant Maintenance and Customer Service
364 Data Element  RGEKZ Indicator: Backflush
365 Data Element  RMNGA Total confirmed rework quantity
366 Data Element  RSNUM Number of reservation/dependent requirements
367 Data Element  RSNUM Number of reservation/dependent requirements
368 Data Element  RSORD Refurbishment order indicator (PM)
369 Data Element  RSUPG Upgrade Order Indicator
370 Data Element  SCOPE_CV Object Class
371 Data Element  SCRTP Scenario or Subscreen Category
372 Data Element  SELKZ Selection flag
373 Data Element  SICHZ Float after production (in days)
374 Data Element  SICHZ_TRM Scheduled float after production in days
375 Data Element  SPART Division
376 Data Element  SPLIT_STAT Status of an order in a split hierarchy
377 Data Element  STALT Alternative BOM
378 Data Element  STLAN BOM Usage
379 Data Element  STLST BOM Statuses
380 Data Element  STLTY BOM Category
381 Data Element  STNUM Bill of Material
382 Data Element  STORT Asset location
383 Data Element  SWERK Maintenance Plant
384 Data Element  SYSUUID_X UUID in X form (binary)
385 Data Element  TABIX_D Field defined as in SY-TABIX
386 Data Element  TERHW Scheduling note from order scheduling
387 Data Element  TERMKZ Scheduling type
388 Data Element  TERMKZP Scheduling type (forecast)
389 Data Element  TERMKZ_TXT Description of scheduling type
390 Data Element  TERMKZ_TXT Description of scheduling type
391 Data Element  TEXT40 Text, 40 Characters Long
392 Data Element  TIMESTAMPL UTC Time Stamp in Long Form (YYYYMMDDhhmmssmmmuuun)
393 Data Element  TMBAS_TX Description of the planning type
394 Data Element  TPLNR Functional Location
395 Data Element  TRMDT Date of the last scheduling
396 Data Element  TXCHG Indicator: long text changed
397 Data Element  TXJCD Tax Jurisdiction
398 Data Element  TYPKZ Type of object causing the load (order category)
399 Data Element  UII_CHAR72 Unique Item Identifier
400 Data Element  VAGRP Responsible planner group/department
401 Data Element  VAGRP Responsible planner group/department
402 Data Element  VANTW Person/Group responsible for the network
403 Data Element  VBELN Sales and Distribution Document Number
404 Data Element  VBKZ Update indicator
405 Data Element  VKORG Sales Organization
406 Data Element  VORGZ Float before production (in days)
407 Data Element  VORGZ_TRM Scheduled float before production in days
408 Data Element  VSINACT Version inactive indicator
409 Data Element  VSNMR Number or description of a version
410 Data Element  VSNMR_V Sales document version number
411 Data Element  VTWEG Distribution Channel
412 Data Element  WAPOS Maintenance item
413 Data Element  WARPL Maintenance Plan
414 Data Element  WEGXX Path (for Multi-Level BOM Explosions)
415 Data Element  WEGXX Path (for Multi-Level BOM Explosions)
416 Data Element  WERGW Plant associated with main work center
417 Data Element  WERKS_D Plant
418 Data Element  WFCID Factory Calendar
419 Data Element  XFELD Checkbox
420 Data Element  XFELD Checkbox
421 Data Element  XFELD Checkbox